HL incident on 2016-05-09 — OK
Operator
Magellan Pipeline Company, Lp
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$10
Incident datetime
2016-05-09 23:40
Report number
Location
OK
Narrative
Stainless steel thermal relief tubing installed around a check valve on tank 2700's tank line developed a crack resulting in a release of approximately 1 barrel of gasoline. It was determined that fatigue failure of the thermal relief tubing occurred due to lack of adequate support to counter vibration. Replacement tubing was installed with sufficient supports to counter the impact of excessive vibration. This project has been closed out with the idnr and within magellan so no future costs or activities will take place. Approximately 31 cubic yards of impacted soil was remediated through excavation and proper disposal. Supplemental/final filed: updated part a11(volume recovered), part d 8d(emergency response cost), and 8e (environmental remediation cost) and part h (narrative)
Detailed record list
Report Received Date
2016-06-06 00:00:00
Iyear
2016
Report Number
20160172
Supplemental Number
22859
Report Type
Supplemental Final
Operator Id
22610
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2016-05-09 23:40:00
Location Latitude
41.56244
Location Longitude
-93.52198
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
1
Recovered Bbls
0.46
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2016-05-09 23:40:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2016-05-09 23:40:00
Restart Datetime
2016-05-10 00:30:00
On Site Datetime
2016-05-09 23:40:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Des Moines Terminal
Segment Name
Terminal No. 201, Tank No. 2700
Onshore State Abbreviation
Ia
Onshore Postal Code
50327
Onshore City Name
Des Moines
Onshore County Name
Polk
Designated Location
Milepost/valve Station
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Tubing
Installation Year
2013
Material Involved
Material Other Than Carbon Steel
Material Details
Stainless Steel Tubing
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Groundwater Remed Ind
Yes
Water Contam Ind
Yes
Groundwater Contam Ind
Yes
Amount Released
0.26
Rel Water Name
Subsurface Groundwater
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
90
Est Cost Prop Damage
10
Est Cost Emergency
33000
Est Cost Environmental
8000
Est Cost Other
0
Prpty
41100
Accident Psig
17
Mop Psig
275
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Informal investigation by operations control supervisor determined no controller actions contributed to the event, and controller was following procedure for the task being performed.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Threaded Connection/coupling Failure
Eq Failure Type
Threaded Connection/coupling Failure
Other Stripped Ind
Threaded Fitting
Additional Support Ind
Yes
Preparer Name
S****** L******
Preparer Title
Ai Analyst
Preparer Email
S**************@m*********.com
Preparer Telephone
918-574-7327
Preparer Fax
918-574-7376
Prepared Date
2017-12-04 00:00:00
Authorizer Name
S****** L******
Authorizer Telephone
918-574-7327
Authorizer Title
Ai Analyst
Authorizer Email
S**************@m**********.com
Narrative
Stainless steel thermal relief tubing installed around a check valve on tank 2700's tank line developed a crack resulting in a release of approximately 1 barrel of gasoline. It was determined that fatigue failure of the thermal relief tubing occurred due to lack of adequate support to counter vibration. Replacement tubing was installed with sufficient supports to counter the impact of excessive vibration. This project has been closed out with the idnr and within magellan so no future costs or activities will take place. Approximately 31 cubic yards of impacted soil was remediated through excavation and proper disposal. Supplemental/final filed: updated part a11(volume recovered), part d 8d(emergency response cost), and 8e (environmental remediation cost) and part h (narrative)
| Report Received Date | 2016-06-06 00:00:00 |
|---|---|
| Iyear | 2016 |
| Report Number | 20160172 |
| Supplemental Number | 22859 |
| Report Type | Supplemental Final |
| Operator Id | 22610 PHMSA Enforcement |
| Name | Magellan Pipeline Company, Lp |
| Operator Street Address | 100 West 5th Street |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74103 |
| Local Datetime | 2016-05-09 23:40:00 |
| Location Latitude | 41.56244 Google Maps OpenStreetMap |
| Location Longitude | -93.52198 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Gasoline (Non-Ethanol) |
| Unintentional Release Bbls | 1 |
| Recovered Bbls | 0.46 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2016-05-09 23:40:00 |
| System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2016-05-09 23:40:00 |
| Restart Datetime | 2016-05-10 00:30:00 |
| On Site Datetime | 2016-05-09 23:40:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Des Moines Terminal |
| Segment Name | Terminal No. 201, Tank No. 2700 |
| Onshore State Abbreviation | Ia |
| Onshore Postal Code | 50327 |
| Onshore City Name | Des Moines |
| Onshore County Name | Polk |
| Designated Location | Milepost/valve Station |
| Designated Name | 0 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Tubing |
| Installation Year | 2013 |
| Material Involved | Material Other Than Carbon Steel |
| Material Details | Stainless Steel Tubing |
| Release Type | Leak |
| Leak Type | Crack |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Groundwater Remed Ind | Yes |
| Water Contam Ind | Yes |
| Groundwater Contam Ind | Yes |
| Amount Released | 0.26 |
| Rel Water Name | Subsurface Groundwater |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 90 |
| Est Cost Prop Damage | 10 |
| Est Cost Emergency | 33000 |
| Est Cost Environmental | 8000 |
| Est Cost Other | 0 |
| Prpty | 41100 |
| Accident Psig | 17 |
| Mop Psig | 275 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Informal investigation by operations control supervisor determined no controller actions contributed to the event, and controller was following procedure for the task being performed. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Threaded Connection/coupling Failure |
| Eq Failure Type | Threaded Connection/coupling Failure |
| Other Stripped Ind | Threaded Fitting |
| Additional Support Ind | Yes |
| Preparer Name | S****** L****** |
| Preparer Title | Ai Analyst |
| Preparer Email | S**************@m*********.com |
| Preparer Telephone | 918-574-7327 |
| Preparer Fax | 918-574-7376 |
| Prepared Date | 2017-12-04 00:00:00 |
| Authorizer Name | S****** L****** |
| Authorizer Telephone | 918-574-7327 |
| Authorizer Title | Ai Analyst |
| Authorizer Email | S**************@m**********.com |
| Narrative | Stainless steel thermal relief tubing installed around a check valve on tank 2700's tank line developed a crack resulting in a release of approximately 1 barrel of gasoline. It was determined that fatigue failure of the thermal relief tubing occurred due to lack of adequate support to counter vibration. Replacement tubing was installed with sufficient supports to counter the impact of excessive vibration. This project has been closed out with the idnr and within magellan so no future costs or activities will take place. Approximately 31 cubic yards of impacted soil was remediated through excavation and proper disposal. Supplemental/final filed: updated part a11(volume recovered), part d 8d(emergency response cost), and 8e (environmental remediation cost) and part h (narrative) |