GD incident on 2016-10-11 — IL

Operator
Northern Illinois Gas Co
Cause
Locating Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 1 injury
Property damage (nominal)
$72,450
Incident datetime
2016-10-11 14:59
Report number
Location
IL, WILL
Narrative
Incident originally reported to the nrc as 77 strawflower. Actual address of explosion is 91 strawflower ct. A third party excavator was installing conduit via directional drilling. A main was struck multiple times during the pullback. The release of gas was secured about 2 hours prior to the incident. Subsequently, the explosion occurred. In section g3 question 14, only one root cause can be selected; however, our investigation indicated 2 root causes; locating practices insufficient and excavation practices insufficient.
Detailed record list
Occurred At
2016-10-11 14:59:00
Year
2016
Report Received Date
2016-11-11 00:00:00
Iyear
2016.0
Report Number
20160114.0
Supplemental Number
16723.0
Report Type
Supplemental Final
Operator Id
Name
Northern Illinois Gas Co
Operator Street Address
P.o. Box 190, Rt 59 & I-88
Operator City Name
Aurora
Operator State Abbreviation
IL
Operator Postal Code
60507
Local Datetime
2016-10-11 19:33:00
Location Street Address
91 Strawflower Ct
Location City Name
Romeoville
Location County Name
Will
Location State Abbreviation
IL
Location Postal Code
60446
Location Latitude
Location Longitude
Nrc Rpt Datetime
2016-10-11 20:20:00
Nrc Rpt Num
Commodity Released Type
Natural Gas
Unintentional Release
566.0
Fatality Ind
No
Fatal
0
Injury Ind
Yes
Num Emp Injuries
1
Num Contr Injuries
0
Num Er Injuries
0
Num Worker Injuries
0
Num Gp Injuries
0
Injure
1
Ignite Ind
Yes
Explode Ind
Yes
Num Pub Evacuated
20.0
Incident Identified Datetime
2016-10-11 14:59:00
On Site Datetime
2016-10-11 15:20:00
Federal
No
Location Type
Public Property
Incident Area Type
Underground
Incident Area Subtype
Under Pavement
Depth Of Cover
43.0
Crossing
No
Pipe Facility Type
Investor Owned
System Part Involved
Main
Installation Year
1998.0
Pipe Diameter
2.0
Pipe Specification
Astm D2513
Pipe Manufacturer
Driscopipe
Material Involved
Plastic
Plastic Type
Polyethylene (Pe)
Plastic Sdr
11
Material Pe Pipe Code
2406
Release Type
Other
Release Type Details
Multiple Mechanical Punctures Every Couple Of Inches For Several Feet Along The Length Of The Main.
Class Location Type
Class 3 Location
Est Cost Oper Paid
1038000.0
Est Cost Prop Damage
72450.0
Est Cost Emergency
76067.0
Est Cost Other
0.0
Est Cost Unintentional Release
2296.0
Prpty
1188813.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
8.0
Accident Psig
56.0
Normal Psig
57.0
Mop Psig
60.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
No
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
Yes
Num Employees Tested
12
Num Employees Failed
0
Contractor Drug Test Ind
Yes
Num Contractors Tested
1
Num Contractors Failed
0
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
Notify Cga Dirt
No
Public Row Ind
Yes
Public Subtype
City Street
Excavator Type
Contractor
Excavator Equipment
Directional Drilling
Work Performed
Telecommunications
One Call Notified Ind
Yes
One Call Ticket Num
2632375
One Call Center Name
J.u.l.i.e. Note That Julie Tickets Number Above Start With An "a". Second And Third Ticket Is A263335 And A263391
Locator Type
Contract Locator
Visible Marks
No
Service Interruption
Yes
Service Interruption Hours
316.0
Root Cause Category
Locating Issue
Root Cause Type
Facility Not Marked Due To Incomplete Marks At Damage Location
Preparer Name
L****** Q******
Preparer Title
Director Compliance And Qa
Preparer Email
L******@s*********.com
Preparer Telephone
630-388-2316
Authorizer Name
L****** Q******
Authorizer Title
Director Compliance And Qa
Authorizer Telephone
630-388-2316
Authorizer Email
L******@s*********.com
Narrative
Incident originally reported to the nrc as 77 strawflower. Actual address of explosion is 91 strawflower ct. A third party excavator was installing conduit via directional drilling. A main was struck multiple times during the pullback. The release of gas was secured about 2 hours prior to the incident. Subsequently, the explosion occurred. In section g3 question 14, only one root cause can be selected; however, our investigation indicated 2 root causes; locating practices insufficient and excavation practices insufficient.
Occurred At 2016-10-11 14:59:00
Year 2016
Report Received Date 2016-11-11 00:00:00
Iyear 2016.0
Report Number 20160114.0
Supplemental Number 16723.0
Report Type Supplemental Final
Operator Id 13710 PHMSA Enforcement
Name Northern Illinois Gas Co
Operator Street Address P.o. Box 190, Rt 59 & I-88
Operator City Name Aurora
Operator State Abbreviation IL
Operator Postal Code 60507
Local Datetime 2016-10-11 19:33:00
Location Street Address 91 Strawflower Ct
Location City Name Romeoville
Location County Name Will
Location State Abbreviation IL
Location Postal Code 60446
Location Latitude 41.620039 Google Maps OpenStreetMap
Location Longitude -88.129629 Google Maps OpenStreetMap
Nrc Rpt Datetime 2016-10-11 20:20:00
Nrc Rpt Num 1161337 NRC Report How to search
Commodity Released Type Natural Gas
Unintentional Release 566.0
Fatality Ind No
Fatal 0
Injury Ind Yes
Num Emp Injuries 1
Num Contr Injuries 0
Num Er Injuries 0
Num Worker Injuries 0
Num Gp Injuries 0
Injure 1
Ignite Ind Yes
Explode Ind Yes
Num Pub Evacuated 20.0
Incident Identified Datetime 2016-10-11 14:59:00
On Site Datetime 2016-10-11 15:20:00
Federal No
Location Type Public Property
Incident Area Type Underground
Incident Area Subtype Under Pavement
Depth Of Cover 43.0
Crossing No
Pipe Facility Type Investor Owned
System Part Involved Main
Installation Year 1998.0
Pipe Diameter 2.0
Pipe Specification Astm D2513
Pipe Manufacturer Driscopipe
Material Involved Plastic
Plastic Type Polyethylene (Pe)
Plastic Sdr 11
Material Pe Pipe Code 2406
Release Type Other
Release Type Details Multiple Mechanical Punctures Every Couple Of Inches For Several Feet Along The Length Of The Main.
Class Location Type Class 3 Location
Est Cost Oper Paid 1038000.0
Est Cost Prop Damage 72450.0
Est Cost Emergency 76067.0
Est Cost Other 0.0
Est Cost Unintentional Release 2296.0
Prpty 1188813.0
Commercial Affected 0.0
Industrial Affected 0.0
Residences Affected 8.0
Accident Psig 56.0
Normal Psig 57.0
Mop Psig 60.0
Accident Pressure Pressure Did Not Exceed Maop
Scada In Place Ind No
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Investigation Status No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind Yes
Num Employees Tested 12
Num Employees Failed 0
Contractor Drug Test Ind Yes
Num Contractors Tested 1
Num Contractors Failed 0
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind Yes
One Call System Ind Yes
Notify Cga Dirt No
Public Row Ind Yes
Public Subtype City Street
Excavator Type Contractor
Excavator Equipment Directional Drilling
Work Performed Telecommunications
One Call Notified Ind Yes
One Call Ticket Num 2632375
One Call Center Name J.u.l.i.e. Note That Julie Tickets Number Above Start With An "a". Second And Third Ticket Is A263335 And A263391
Locator Type Contract Locator
Visible Marks No
Service Interruption Yes
Service Interruption Hours 316.0
Root Cause Category Locating Issue
Root Cause Type Facility Not Marked Due To Incomplete Marks At Damage Location
Preparer Name L****** Q******
Preparer Title Director Compliance And Qa
Preparer Email L******@s*********.com
Preparer Telephone 630-388-2316
Authorizer Name L****** Q******
Authorizer Title Director Compliance And Qa
Authorizer Telephone 630-388-2316
Authorizer Email L******@s*********.com
Narrative Incident originally reported to the nrc as 77 strawflower. Actual address of explosion is 91 strawflower ct. A third party excavator was installing conduit via directional drilling. A main was struck multiple times during the pullback. The release of gas was secured about 2 hours prior to the incident. Subsequently, the explosion occurred. In section g3 question 14, only one root cause can be selected; however, our investigation indicated 2 root causes; locating practices insufficient and excavation practices insufficient.

All rights reserved. Copyright © by ClearPHMSA