HL incident on 2015-08-06 — TX

Operator
Wyoming Pipeline Company
Cause
Locating Issue
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$2,000
Incident datetime
2015-08-06 11:00
Report number
Location
TX
Narrative
Contractor working for oil company called in locate for injection line. The line in question is a non-operational gathering line. We located the wrong line. We got off of our row; contractor dug out our line, because it was not located , dug through our line, causing spill. All product was recovered, contaminated soil collected and properly disposed of, new soil was placed in the excavation.
Detailed record list
Report Received Date
2016-03-31 00:00:00
Iyear
2015
Report Number
20160099
Supplemental Number
23050
Report Type
Supplemental Final
Operator Id
Name
Wyoming Pipeline Company
Operator Street Address
825 Town & Country Lane
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77024
Local Datetime
2015-08-06 11:00:00
Location Latitude
Location Longitude
-104.6031611
Commodity Released Type
Crude Oil
Unintentional Release Bbls
35
Recovered Bbls
35
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Third Party That Caused The Accident
Incident Identified Datetime
2015-08-06 11:00:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Line Segment Was Not In Operation
On Site Datetime
2015-08-06 11:30:00
Nrc Rpt Datetime
2015-08-07 10:22:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Wyoming Pipeline Company
Segment Name
Fiddler Crk- Gathering Line - Permian Line
Onshore State Abbreviation
Wy
Onshore Postal Code
82701
Onshore City Name
Not Within A Municipality
Onshore County Name
Weston
Designated Location
Milepost/valve Station
Designated Name
Fc/permian Ln
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
34
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8
Pipe Wall Thickness
0.277
Pipe Smys
24000
Pipe Specification
Unknown
Pipe Seam Type
Erw - Low Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Coal Tar
Installation Year
1949
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
8
Puncture Circum
25
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Vegetation Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
3000
Est Cost Gas Released
1400
Est Cost Prop Damage
2000
Est Cost Emergency
5000
Est Cost Environmental
310000
Est Cost Other
0
Prpty
321400
Accident Psig
0
Mop Psig
550
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
10560
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
=< 20% Smys Regulated Gathering
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
Notify Cga Dirt
No
Pipeline Easement Row Ind
Yes
Excavator Type
Contractor
Excavator Equipment
Backhoe/trackhoe
Work Performed
Liquid Pipeline
One Call Notified Ind
Yes
One Call Ticket Num
Unknown
Locator Type
Utility Owner
Visible Marks
Yes
Root Cause Category
Locating Issue
Root Cause Type
Facility Marked Inaccurately Due To Locator Error
Preparer Name
W****** M********
Preparer Title
Compliance Consultant
Preparer Email
W*****@c**.net
Preparer Telephone
4058201304
Prepared Date
2018-01-16 00:00:00
Authorizer Name
N***** H******
Authorizer Telephone
3077469479
Authorizer Title
Pipeline Manager
Authorizer Email
N*******@w****.com
Narrative
Contractor working for oil company called in locate for injection line. The line in question is a non-operational gathering line. We located the wrong line. We got off of our row; contractor dug out our line, because it was not located , dug through our line, causing spill. All product was recovered, contaminated soil collected and properly disposed of, new soil was placed in the excavation.
Report Received Date 2016-03-31 00:00:00
Iyear 2015
Report Number 20160099
Supplemental Number 23050
Report Type Supplemental Final
Operator Id 32537 PHMSA Enforcement
Name Wyoming Pipeline Company
Operator Street Address 825 Town & Country Lane
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77024
Local Datetime 2015-08-06 11:00:00
Location Latitude 43.9567944 Google Maps OpenStreetMap
Location Longitude -104.6031611 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 35
Recovered Bbls 35
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Notification From Third Party That Caused The Accident
Incident Identified Datetime 2015-08-06 11:00:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain Line Segment Was Not In Operation
On Site Datetime 2015-08-06 11:30:00
Nrc Rpt Datetime 2015-08-07 10:22:00
Nrc Rpt Num 1124998 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name Wyoming Pipeline Company
Segment Name Fiddler Crk- Gathering Line - Permian Line
Onshore State Abbreviation Wy
Onshore Postal Code 82701
Onshore City Name Not Within A Municipality
Onshore County Name Weston
Designated Location Milepost/valve Station
Designated Name Fc/permian Ln
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Exposed Due To Excavation
Depth Of Cover 34
Crossing No
Pipe Facility Type Intrastate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 8
Pipe Wall Thickness 0.277
Pipe Smys 24000
Pipe Specification Unknown
Pipe Seam Type Erw - Low Frequency
Pipe Manufacturer Unknown
Pipe Coating Type Coal Tar
Installation Year 1949
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Mechanical Puncture
Puncture Axial 8
Puncture Circum 25
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Vegetation Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 3000
Est Cost Gas Released 1400
Est Cost Prop Damage 2000
Est Cost Emergency 5000
Est Cost Environmental 310000
Est Cost Other 0
Prpty 321400
Accident Psig 0
Mop Psig 550
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 10560
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function =< 20% Smys Regulated Gathering
Scada In Place Ind No
Cpm In Place Ind No
Investigation Status No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind Yes
One Call System Ind Yes
Notify Cga Dirt No
Pipeline Easement Row Ind Yes
Excavator Type Contractor
Excavator Equipment Backhoe/trackhoe
Work Performed Liquid Pipeline
One Call Notified Ind Yes
One Call Ticket Num Unknown
Locator Type Utility Owner
Visible Marks Yes
Root Cause Category Locating Issue
Root Cause Type Facility Marked Inaccurately Due To Locator Error
Preparer Name W****** M********
Preparer Title Compliance Consultant
Preparer Email W*****@c**.net
Preparer Telephone 4058201304
Prepared Date 2018-01-16 00:00:00
Authorizer Name N***** H******
Authorizer Telephone 3077469479
Authorizer Title Pipeline Manager
Authorizer Email N*******@w****.com
Narrative Contractor working for oil company called in locate for injection line. The line in question is a non-operational gathering line. We located the wrong line. We got off of our row; contractor dug out our line, because it was not located , dug through our line, causing spill. All product was recovered, contaminated soil collected and properly disposed of, new soil was placed in the excavation.