GTG incident on 2016-06-10 — KY

Operator
Southern Star Central Gas Pipeline, Inc
Cause
Natural Force Damage
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$195,000
Incident datetime
2016-06-10 20:39
Report number
Location
KY
Narrative
On june 10 at 8:39 pm southern star received a call from public stating there was a plastic (determined to be steel) line in walnut creek that was bubbling and probably caused by debris in the creek. At 8:30 pm ssc operations were notified to report to the location of the possible leak. After operations notification ssc gas control attempted to contact the local emergency response (psap) between the times of 8:40-9:49. Contact with psap was made at 9:49 pm. Ssc operations arrived on scene at 10:31 pm and at 11:15 the line was determined to be southern star's. It was decided to have operations personnel stay on site to monitor the scene and wait until morning to investigate further because of water over the pipeline and wet, dark conditions. By 9:15 am on june 11 the leak had been investigated and determined there was a kink in the line and a crack approximately 1" long. The kink in the line would not allow a leak clamp to be installed. The work scheduled was to feed the town borders west of hamlin mlg with tank trucks and isolate the segment from the tap to the hamlin mlg to lower the pressure and removed the debris from the pipeline and make a replacement of the leak section of pipe. The line was isolated at 7:30 am on june 14. Until that time the segment was monitored 24/7 by operations personnel to make sure the leak did not get worse. The replacement section was complete and the line was back in service on june 16 at 12:36 pm.
Detailed record list
Report Received Date
2016-07-07 00:00:00
Iyear
2016
Report Number
20160059
Supplemental Number
17160
Report Type
Supplemental Final
Operator Id
Name
Southern Star Central Gas Pipeline, Inc
Operator Street Address
4700 Highway 56; Box 20010
Operator City Name
Owensboro
Operator State Abbreviation
KY
Operator Postal Code
42301
Local Datetime
2016-06-10 20:39:00
Location Latitude
Location Longitude
-95.59315615
Nrc Rpt Num
Nrc Rpt Datetime
2016-06-11 10:29:00
Commodity Released Type
Natural Gas
Unintentional Release
1005
Intentional Release
207
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2016-06-14 07:30:00
Restart Datetime
2016-06-16 14:36:00
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Incident Identified Datetime
2016-06-10 20:39:00
On Site Datetime
2016-06-10 22:31:00
On Off Shore
Onshore
Onshore State Abbreviation
Ks
Onshore Postal Code
66534
Onshore City Name
Not Within A Municipality
Onshore County Name
Brown County
Designated Location
Survey Station No.
Designated Name
100/187+07
Pipe Fac Name
Line Er
Segment Name
Sabetha Tap
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Aboveground
Incident Area Subtype
In Or Spanning An Open Ditch
Crossing
Yes
Water Crossing Ind
Yes
Water Type
Uncased
Water Name
Walnut Creek
Water Depth
6
Water Subtype
Below Water, Pipe On Or Above Bottom
Pipe Facility Type
Interstate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
6
Pipe Wall Thickness
0.188
Pipe Smys
35000
Pipe Specification
Api 5l
Pipe Seam Type
Longitudinal Erw - Low Frequency
Pipe Manufacturer
Interlake Steel
Pipe Coating Type
Coal Tar
Installation Year
1969
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
1
Puncture Circum
0.1
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
102
Heat Damage Ind
No
Non Heat Damage Ind
No
Hca Fatalities Ind
No
Est Cost Oper Paid
10000
Est Cost Unintentional Release
2171
Est Cost Intentional Release
447
Est Cost Prop Damage
195000
Est Cost Emergency
10000
Est Cost Other
0
Prpty
217618
Accident Psig
350
Mop Psig
500
Mop Cfr Section
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Length Segment Isolated
26300
Internal Inspection Ind
No
Other Inspection Ind
Yes
Internal Inspection Details
No Launcher Or Receiver.
Operation Complications Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Notification From Public
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Natural Force Damage
Cause Details
Heavy Rains/floods
Natural Force Type
Heavy Rains/floods
Heavy Rains Subtype
Other
Nf Other Details
Heavy Rains Caused Extremely High Water And Numerous Trees And Branches To Be Washed Down The Creek. The Debris Got Caught On The Pipeline And Caused A Bend In The Pipe To Kink And Then Crack.
Nf Extreme Weather Ind
Yes
Nf Other Ind
Yes
Nf Extreme Weather Details
Flooding Due To Heavy Rainfall
Preparer Name
D**** C*****
Preparer Title
Pipeline Compliance Engineer
Preparer Email
D***********@s****.com
Preparer Telephone
270.852.4391
Authorizer Name
D**** L* S*******
Authorizer Title
Pipeline Compliance Manager
Authorizer Telephone
270.852.4424
Authorizer Email
D***************@s****.com
Narrative
On june 10 at 8:39 pm southern star received a call from public stating there was a plastic (determined to be steel) line in walnut creek that was bubbling and probably caused by debris in the creek. At 8:30 pm ssc operations were notified to report to the location of the possible leak. After operations notification ssc gas control attempted to contact the local emergency response (psap) between the times of 8:40-9:49. Contact with psap was made at 9:49 pm. Ssc operations arrived on scene at 10:31 pm and at 11:15 the line was determined to be southern star's. It was decided to have operations personnel stay on site to monitor the scene and wait until morning to investigate further because of water over the pipeline and wet, dark conditions. By 9:15 am on june 11 the leak had been investigated and determined there was a kink in the line and a crack approximately 1" long. The kink in the line would not allow a leak clamp to be installed. The work scheduled was to feed the town borders west of hamlin mlg with tank trucks and isolate the segment from the tap to the hamlin mlg to lower the pressure and removed the debris from the pipeline and make a replacement of the leak section of pipe. The line was isolated at 7:30 am on june 14. Until that time the segment was monitored 24/7 by operations personnel to make sure the leak did not get worse. The replacement section was complete and the line was back in service on june 16 at 12:36 pm.
Report Received Date 2016-07-07 00:00:00
Iyear 2016
Report Number 20160059
Supplemental Number 17160
Report Type Supplemental Final
Operator Id 31711 PHMSA Enforcement
Name Southern Star Central Gas Pipeline, Inc
Operator Street Address 4700 Highway 56; Box 20010
Operator City Name Owensboro
Operator State Abbreviation KY
Operator Postal Code 42301
Local Datetime 2016-06-10 20:39:00
Location Latitude 39.89894131 Google Maps OpenStreetMap
Location Longitude -95.59315615 Google Maps OpenStreetMap
Nrc Rpt Num 1150315 NRC Report How to search
Nrc Rpt Datetime 2016-06-11 10:29:00
Commodity Released Type Natural Gas
Unintentional Release 1005
Intentional Release 207
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Shutdown Due Accident Ind Yes
Shutdown Datetime 2016-06-14 07:30:00
Restart Datetime 2016-06-16 14:36:00
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Incident Identified Datetime 2016-06-10 20:39:00
On Site Datetime 2016-06-10 22:31:00
On Off Shore Onshore
Onshore State Abbreviation Ks
Onshore Postal Code 66534
Onshore City Name Not Within A Municipality
Onshore County Name Brown County
Designated Location Survey Station No.
Designated Name 100/187+07
Pipe Fac Name Line Er
Segment Name Sabetha Tap
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Aboveground
Incident Area Subtype In Or Spanning An Open Ditch
Crossing Yes
Water Crossing Ind Yes
Water Type Uncased
Water Name Walnut Creek
Water Depth 6
Water Subtype Below Water, Pipe On Or Above Bottom
Pipe Facility Type Interstate
System Part Involved Onshore Pipeline, Including Valve Sites
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 6
Pipe Wall Thickness 0.188
Pipe Smys 35000
Pipe Specification Api 5l
Pipe Seam Type Longitudinal Erw - Low Frequency
Pipe Manufacturer Interlake Steel
Pipe Coating Type Coal Tar
Installation Year 1969
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Mechanical Puncture
Puncture Axial 1
Puncture Circum 0.1
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 102
Heat Damage Ind No
Non Heat Damage Ind No
Hca Fatalities Ind No
Est Cost Oper Paid 10000
Est Cost Unintentional Release 2171
Est Cost Intentional Release 447
Est Cost Prop Damage 195000
Est Cost Emergency 10000
Est Cost Other 0
Prpty 217618
Accident Psig 350
Mop Psig 500
Mop Cfr Section 192.619(C) View CFR 49 §192
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Length Segment Isolated 26300
Internal Inspection Ind No
Other Inspection Ind Yes
Internal Inspection Details No Launcher Or Receiver.
Operation Complications Ind No
Pipeline Function Transmission System
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Accident Identifier Notification From Public
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Natural Force Damage
Cause Details Heavy Rains/floods
Natural Force Type Heavy Rains/floods
Heavy Rains Subtype Other
Nf Other Details Heavy Rains Caused Extremely High Water And Numerous Trees And Branches To Be Washed Down The Creek. The Debris Got Caught On The Pipeline And Caused A Bend In The Pipe To Kink And Then Crack.
Nf Extreme Weather Ind Yes
Nf Other Ind Yes
Nf Extreme Weather Details Flooding Due To Heavy Rainfall
Preparer Name D**** C*****
Preparer Title Pipeline Compliance Engineer
Preparer Email D***********@s****.com
Preparer Telephone 270.852.4391
Authorizer Name D**** L* S*******
Authorizer Title Pipeline Compliance Manager
Authorizer Telephone 270.852.4424
Authorizer Email D***************@s****.com
Narrative On june 10 at 8:39 pm southern star received a call from public stating there was a plastic (determined to be steel) line in walnut creek that was bubbling and probably caused by debris in the creek. At 8:30 pm ssc operations were notified to report to the location of the possible leak. After operations notification ssc gas control attempted to contact the local emergency response (psap) between the times of 8:40-9:49. Contact with psap was made at 9:49 pm. Ssc operations arrived on scene at 10:31 pm and at 11:15 the line was determined to be southern star's. It was decided to have operations personnel stay on site to monitor the scene and wait until morning to investigate further because of water over the pipeline and wet, dark conditions. By 9:15 am on june 11 the leak had been investigated and determined there was a kink in the line and a crack approximately 1" long. The kink in the line would not allow a leak clamp to be installed. The work scheduled was to feed the town borders west of hamlin mlg with tank trucks and isolate the segment from the tap to the hamlin mlg to lower the pressure and removed the debris from the pipeline and make a replacement of the leak section of pipe. The line was isolated at 7:30 am on june 14. Until that time the segment was monitored 24/7 by operations personnel to make sure the leak did not get worse. The replacement section was complete and the line was back in service on june 16 at 12:36 pm.