GTG incident on 2016-04-29 — TX

Operator
Texas Eastern Transmission, Lp (Spectra Energy Partners, Lp)
Cause
Corrosion Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 1 injury
Property damage (nominal)
$624,000
Incident datetime
2016-04-29 08:13
Report number
Location
TX
Narrative
At approximately 8:13 a.M. Est on april 29, 2016, tetlp's 30-inch diameter line 27 transporting natural gas from delmont compressor station to armagh compressor station in pennsylvania failed at mp 2.07. The failure resulted in an explosion and fire. Tetlp personnel were immediately dispatched to close mainline block valves within the delmont compressor station and at the conemaugh river mainline valves at mp 15.45. First responders evacuated the public from 9 structures. Metallurgical analysis concluded the failure occurred at the 5:30 o'clock orientation at a region of external metal loss near a girth weld that had been coated with polyethylene tape. The failure initiated in the axial direction and propagated axially and circumferentially. The presence of external corrosion at the failure location indicates that the field joint coating was compromised. This narrative description has been updated since filing of the original report to reflect the company's failure analysis. Supplemental report: tetlp has made the decision to abandon the idled section of line 27. Tetlp has commenced work on the required ferc abandonment filing.
Detailed record list
Report Received Date
2016-05-27 00:00:00
Iyear
2016
Report Number
20160042
Supplemental Number
31657
Report Type
Supplemental Final
Operator Id
Name
Texas Eastern Transmission, Lp (Spectra Energy Partners, Lp)
Operator Street Address
915 North Eldridge Parkway
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77079
Local Datetime
2016-04-29 08:13:00
Location Latitude
Location Longitude
-79.52351279
Nrc Rpt Num
Nrc Rpt Datetime
2016-04-29 09:15:00
Commodity Released Type
Natural Gas
Unintentional Release
208425
Intentional Release
27775
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
Yes
Num Emp Injuries
0
Num Contr Injuries
0
Num Er Injuries
0
Num Worker Injuries
0
Num Gp Injuries
1
Injure
1
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2016-04-29 09:12:00
Still Shutdown Ind
Yes
Ignite Ind
Yes
Explode Ind
Yes
Num Pub Evacuated
12
Incident Identified Datetime
2016-04-29 08:13:00
On Site Datetime
2016-04-29 08:25:00
On Off Shore
Onshore
Onshore State Abbreviation
Pa
Onshore Postal Code
15601
Onshore City Name
Not Within A Municipality
Onshore County Name
Westmoreland
Designated Location
Milepost
Designated Name
2.0
Pipe Fac Name
Line 27
Segment Name
Delmont To Armagh
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
57
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
30
Pipe Wall Thickness
0.404
Pipe Smys
65000
Pipe Specification
Api - 5lx
Pipe Seam Type
Dsaw
Pipe Manufacturer
Us Steel
Pipe Coating Type
Epoxy
Installation Year
1981
Manufactured Year
1981
Material Involved
Carbon Steel
Release Type
Rupture
Rupture Orient
Longitudinal
Rupture Length
1213
Rupture Width
94
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
671
Heat Damage Ind
Yes
Non Heat Damage Ind
No
Hca Fatalities Ind
No
Est Cost Oper Paid
2350000
Est Cost Unintentional Release
406850
Est Cost Intentional Release
55550
Est Cost Prop Damage
624000
Est Cost Emergency
0
Est Cost Other
0
Prpty
3436400
Accident Psig
1039
Mop Psig
1050
Mop Cfr Section
192.619(A)(1)
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Length Segment Isolated
79411
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
5
Num Employees Failed
0
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
General Corrosion
Galvanic Corrosion Ind
Yes
Metallurgical Basis Ind
Yes
Underground Location
Yes
Under Cathodic Protection Ind
Yes
Cathodic Pro Start Year
1981
Cathodic Survey Type
Yes
Cp Annual Survey Ind
Yes
Cp Annual Survey Year
2016
Prior Damage
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Axial Recent Year
2012
Geometry Recent Year
2012
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
M**** S******
Preparer Title
Engineer
Preparer Email
M************@e*******.com
Preparer Telephone
713-627-4726
Authorizer Name
N***** A****
Authorizer Title
Supervisor
Authorizer Telephone
713-627-5008
Authorizer Email
N***********@e*******.com
Narrative
At approximately 8:13 a.M. Est on april 29, 2016, tetlp's 30-inch diameter line 27 transporting natural gas from delmont compressor station to armagh compressor station in pennsylvania failed at mp 2.07. The failure resulted in an explosion and fire. Tetlp personnel were immediately dispatched to close mainline block valves within the delmont compressor station and at the conemaugh river mainline valves at mp 15.45. First responders evacuated the public from 9 structures. Metallurgical analysis concluded the failure occurred at the 5:30 o'clock orientation at a region of external metal loss near a girth weld that had been coated with polyethylene tape. The failure initiated in the axial direction and propagated axially and circumferentially. The presence of external corrosion at the failure location indicates that the field joint coating was compromised. This narrative description has been updated since filing of the original report to reflect the company's failure analysis. Supplemental report: tetlp has made the decision to abandon the idled section of line 27. Tetlp has commenced work on the required ferc abandonment filing.
Report Received Date 2016-05-27 00:00:00
Iyear 2016
Report Number 20160042
Supplemental Number 31657
Report Type Supplemental Final
Operator Id 19235 PHMSA Enforcement
Name Texas Eastern Transmission, Lp (Spectra Energy Partners, Lp)
Operator Street Address 915 North Eldridge Parkway
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77079
Local Datetime 2016-04-29 08:13:00
Location Latitude 40.39682924 Google Maps OpenStreetMap
Location Longitude -79.52351279 Google Maps OpenStreetMap
Nrc Rpt Num 1146495 NRC Report How to search
Nrc Rpt Datetime 2016-04-29 09:15:00
Commodity Released Type Natural Gas
Unintentional Release 208425
Intentional Release 27775
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind Yes
Num Emp Injuries 0
Num Contr Injuries 0
Num Er Injuries 0
Num Worker Injuries 0
Num Gp Injuries 1
Injure 1
Shutdown Due Accident Ind Yes
Shutdown Datetime 2016-04-29 09:12:00
Still Shutdown Ind Yes
Ignite Ind Yes
Explode Ind Yes
Num Pub Evacuated 12
Incident Identified Datetime 2016-04-29 08:13:00
On Site Datetime 2016-04-29 08:25:00
On Off Shore Onshore
Onshore State Abbreviation Pa
Onshore Postal Code 15601
Onshore City Name Not Within A Municipality
Onshore County Name Westmoreland
Designated Location Milepost
Designated Name 2.0
Pipe Fac Name Line 27
Segment Name Delmont To Armagh
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 57
Crossing No
Pipe Facility Type Interstate
System Part Involved Onshore Pipeline, Including Valve Sites
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 30
Pipe Wall Thickness 0.404
Pipe Smys 65000
Pipe Specification Api - 5lx
Pipe Seam Type Dsaw
Pipe Manufacturer Us Steel
Pipe Coating Type Epoxy
Installation Year 1981
Manufactured Year 1981
Material Involved Carbon Steel
Release Type Rupture
Rupture Orient Longitudinal
Rupture Length 1213
Rupture Width 94
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 671
Heat Damage Ind Yes
Non Heat Damage Ind No
Hca Fatalities Ind No
Est Cost Oper Paid 2350000
Est Cost Unintentional Release 406850
Est Cost Intentional Release 55550
Est Cost Prop Damage 624000
Est Cost Emergency 0
Est Cost Other 0
Prpty 3436400
Accident Psig 1039
Mop Psig 1050
Mop Cfr Section 192.619(A)(1) View CFR 49 §192
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Length Segment Isolated 79411
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function Transmission System
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind Yes
Contractor Drug Test Ind No
Num Employees Tested 5
Num Employees Failed 0
Cause Corrosion Failure
Cause Details External Corrosion
Internal External External Corrosion
Visual Exam Results General Corrosion
Galvanic Corrosion Ind Yes
Metallurgical Basis Ind Yes
Underground Location Yes
Under Cathodic Protection Ind Yes
Cathodic Pro Start Year 1981
Cathodic Survey Type Yes
Cp Annual Survey Ind Yes
Cp Annual Survey Year 2016
Prior Damage Yes
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Geometry Deformation Ind Yes
Axial Recent Year 2012
Geometry Recent Year 2012
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name M**** S******
Preparer Title Engineer
Preparer Email M************@e*******.com
Preparer Telephone 713-627-4726
Authorizer Name N***** A****
Authorizer Title Supervisor
Authorizer Telephone 713-627-5008
Authorizer Email N***********@e*******.com
Narrative At approximately 8:13 a.M. Est on april 29, 2016, tetlp's 30-inch diameter line 27 transporting natural gas from delmont compressor station to armagh compressor station in pennsylvania failed at mp 2.07. The failure resulted in an explosion and fire. Tetlp personnel were immediately dispatched to close mainline block valves within the delmont compressor station and at the conemaugh river mainline valves at mp 15.45. First responders evacuated the public from 9 structures. Metallurgical analysis concluded the failure occurred at the 5:30 o'clock orientation at a region of external metal loss near a girth weld that had been coated with polyethylene tape. The failure initiated in the axial direction and propagated axially and circumferentially. The presence of external corrosion at the failure location indicates that the field joint coating was compromised. This narrative description has been updated since filing of the original report to reflect the company's failure analysis. Supplemental report: tetlp has made the decision to abandon the idled section of line 27. Tetlp has commenced work on the required ferc abandonment filing.

All rights reserved. Copyright © by ClearPHMSA