HL incident on 2015-10-26 — TX

Operator
Citgo Pipeline Co
Cause
Natural Force Damage
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$1,000,000
Incident datetime
2015-10-26 09:30
Report number
Location
TX
Narrative
Due to very heavy rains in the area of the facility over the course of a couple of days, the weight of the excessive water on the external floating roof exceeded the drain capacity of the storage tank roof drain system causing the roof to sink below the crude oil level in the tank at the time. A post-accident investigation performed by hmt, inc. Revealed no evidence of the roof drain being plugged up, or partially plugged up, and the drain valve at the bottom of the tank was operated in the normal, open position to allow rainfall to drain off the roof. When the crude oil got on top of the external floating roof, the reported volume drained out of the tank from the roof drain valve near the bottom of the tank. All released crude oil was completely contained within the tank's dikewall and none left the facility property. A second nrc notification was made regarding this accident. The second notification was made at 08:37am on 10/27/15. It was assigned report # 1131792.
Detailed record list
Report Received Date
2015-11-23 00:00:00
Iyear
2015
Report Number
20150423
Supplemental Number
21507
Report Type
Supplemental Final
Operator Id
Name
Citgo Pipeline Co
Operator Street Address
1293 Eldridge Parkway
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77077
Local Datetime
2015-10-26 09:30:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
1064
Recovered Bbls
1044
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Controller
Operator Type
Operator Employee
Incident Identified Datetime
2015-10-26 09:30:00
System Part Involved
Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
The Tank Farm Facility Did Not Have To Be Shutdown Due To The Accident.
On Site Datetime
2015-10-26 10:25:00
Nrc Rpt Datetime
2015-10-26 10:19:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Sour Lake Breakout Station
Onshore State Abbreviation
Tx
Onshore Postal Code
77659
Onshore City Name
Not Within A Municipality
Onshore County Name
Hardin County
Designated Location
Milepost/valve Station
Designated Name
No M.p
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Tank, Including Attached Appurtenances
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Tank/vessel
Tank Vessel Subtype
Roof Drain System
Tank Type
Atmospheric
Installation Year
1953
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Very Heavy Rains Overcame The Roof Drain System Causing The External Floating Roof To Sink Under The Crude Oil With The Reported Volume Being Released Into The Tank's Dikewall From The Roof Drain System.
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
840
Est Cost Prop Damage
1000000
Est Cost Emergency
750000
Est Cost Environmental
25000
Est Cost Other
0
Prpty
1775840
Accident Psig
0
Mop Psig
0
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
1
Num Employees Failed
0
Cause
Natural Force Damage
Cause Details
Heavy Rains/floods
Natural Force Type
Heavy Rains/floods
Heavy Rains Subtype
Other
Nf Other Details
Very Heavy Rains Were Too Much To Adequately Drain Off Of The Tank External Floating Roof Causing It To Sink Below The Crude Oil Level In The Tank
Nf Extreme Weather Ind
Yes
Nf Other Ind
Yes
Nf Extreme Weather Details
Very Heavy Rain Event During A Couple Of Days In The Region.
Preparer Name
R***** B*******
Preparer Title
Ehss Manager
Preparer Email
R******@c****.com
Preparer Telephone
337-802-1179
Preparer Fax
337-708-6123
Prepared Date
2016-07-07 00:00:00
Authorizer Name
R**** M******
Authorizer Telephone
409-287-2276
Authorizer Title
Terminal Manager
Authorizer Email
M******@c****.com
Narrative
Due to very heavy rains in the area of the facility over the course of a couple of days, the weight of the excessive water on the external floating roof exceeded the drain capacity of the storage tank roof drain system causing the roof to sink below the crude oil level in the tank at the time. A post-accident investigation performed by hmt, inc. Revealed no evidence of the roof drain being plugged up, or partially plugged up, and the drain valve at the bottom of the tank was operated in the normal, open position to allow rainfall to drain off the roof. When the crude oil got on top of the external floating roof, the reported volume drained out of the tank from the roof drain valve near the bottom of the tank. All released crude oil was completely contained within the tank's dikewall and none left the facility property. A second nrc notification was made regarding this accident. The second notification was made at 08:37am on 10/27/15. It was assigned report # 1131792.
Report Received Date 2015-11-23 00:00:00
Iyear 2015
Report Number 20150423
Supplemental Number 21507
Report Type Supplemental Final
Operator Id 2387 PHMSA Enforcement
Name Citgo Pipeline Co
Operator Street Address 1293 Eldridge Parkway
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77077
Local Datetime 2015-10-26 09:30:00
Location Latitude 30.145766 Google Maps OpenStreetMap
Location Longitude -94.404044 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 1064
Recovered Bbls 1044
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Controller
Operator Type Operator Employee
Incident Identified Datetime 2015-10-26 09:30:00
System Part Involved Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain The Tank Farm Facility Did Not Have To Be Shutdown Due To The Accident.
On Site Datetime 2015-10-26 10:25:00
Nrc Rpt Datetime 2015-10-26 10:19:00
Nrc Rpt Num 1131707 NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Sour Lake Breakout Station
Onshore State Abbreviation Tx
Onshore Postal Code 77659
Onshore City Name Not Within A Municipality
Onshore County Name Hardin County
Designated Location Milepost/valve Station
Designated Name No M.p
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Tank, Including Attached Appurtenances
Crossing No
Pipe Facility Type Interstate
Item Involved Tank/vessel
Tank Vessel Subtype Roof Drain System
Tank Type Atmospheric
Installation Year 1953
Material Involved Carbon Steel
Release Type Other
Release Type Details Very Heavy Rains Overcame The Roof Drain System Causing The External Floating Roof To Sink Under The Crude Oil With The Reported Volume Being Released Into The Tank's Dikewall From The Roof Drain System.
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 840
Est Cost Prop Damage 1000000
Est Cost Emergency 750000
Est Cost Environmental 25000
Est Cost Other 0
Prpty 1775840
Accident Psig 0
Mop Psig 0
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind Yes
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind Yes
Contractor Drug Test Ind No
Num Employees Tested 1
Num Employees Failed 0
Cause Natural Force Damage
Cause Details Heavy Rains/floods
Natural Force Type Heavy Rains/floods
Heavy Rains Subtype Other
Nf Other Details Very Heavy Rains Were Too Much To Adequately Drain Off Of The Tank External Floating Roof Causing It To Sink Below The Crude Oil Level In The Tank
Nf Extreme Weather Ind Yes
Nf Other Ind Yes
Nf Extreme Weather Details Very Heavy Rain Event During A Couple Of Days In The Region.
Preparer Name R***** B*******
Preparer Title Ehss Manager
Preparer Email R******@c****.com
Preparer Telephone 337-802-1179
Preparer Fax 337-708-6123
Prepared Date 2016-07-07 00:00:00
Authorizer Name R**** M******
Authorizer Telephone 409-287-2276
Authorizer Title Terminal Manager
Authorizer Email M******@c****.com
Narrative Due to very heavy rains in the area of the facility over the course of a couple of days, the weight of the excessive water on the external floating roof exceeded the drain capacity of the storage tank roof drain system causing the roof to sink below the crude oil level in the tank at the time. A post-accident investigation performed by hmt, inc. Revealed no evidence of the roof drain being plugged up, or partially plugged up, and the drain valve at the bottom of the tank was operated in the normal, open position to allow rainfall to drain off the roof. When the crude oil got on top of the external floating roof, the reported volume drained out of the tank from the roof drain valve near the bottom of the tank. All released crude oil was completely contained within the tank's dikewall and none left the facility property. A second nrc notification was made regarding this accident. The second notification was made at 08:37am on 10/27/15. It was assigned report # 1131792.

All rights reserved. Copyright © by ClearPHMSA