HL incident on 2015-10-16 — PA

Operator
Buckeye Partners, Lp
Cause
Notification Issue
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$210,000
Incident datetime
2015-10-16 15:02
Report number
Location
PA
Narrative
On 10/16/2015 at 14:02 cdt the control center received a leak alarm on the 162 line and within a minute shut down and closed in the pipeline. While the pipeline was being shut down the control center received a call, on the emergency phone number, from a farmer who said he had hit the pipeline while plowing his field. At 15:05 local operation arrived on scene. The pipeline was excavated, as well as the entire pipeline section under where the farmer had plowed in order to inspect for any further damage. No further damage was found, a temporary clamp was applied to the leak, the clamp was leak tested and the line was restarted. The contaminated soil was removed. The damaged section will be removed during the upcoming hydro test. Even though the controller reacted appropriately, out of an abundance of caution the employee was sent out for drug and alcohol testing.
Detailed record list
Report Received Date
2015-11-13 00:00:00
Iyear
2015
Report Number
20150404
Supplemental Number
21669
Report Type
Supplemental Final
Operator Id
Name
Buckeye Partners, Lp
Operator Street Address
The Buckeye Building 6161 Hamilton Boulevar
Operator City Name
Allentown
Operator State Abbreviation
PA
Operator Postal Code
18106
Local Datetime
2015-10-16 14:02:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
24
Recovered Bbls
12
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime
2015-10-16 15:02:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2015-10-16 15:03:00
Restart Datetime
2015-10-17 16:50:00
On Site Datetime
2015-10-16 15:05:00
Nrc Rpt Datetime
2015-10-16 15:03:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
162
Segment Name
Du162dh
Onshore State Abbreviation
Il
Onshore Postal Code
62568
Onshore City Name
Willeys
Onshore County Name
Christian
Designated Location
Survey Station No.
Designated Name
41213+03
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
12
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8
Pipe Wall Thickness
0.188
Pipe Smys
42000
Pipe Specification
X42
Pipe Seam Type
Erw - Low Frequency
Pipe Manufacturer
Republic
Pipe Coating Type
Coal Tar
Installation Year
1951
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
4.5
Puncture Circum
4.5
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
1800
Est Cost Prop Damage
210000
Est Cost Emergency
150000
Est Cost Environmental
75000
Est Cost Other
0
Prpty
436800
Accident Psig
200
Mop Psig
615
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
42983
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
1
Num Employees Failed
0
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
No
Notify Cga Dirt
No
Private Row Ind
Yes
Private Subtype
Private Landowner
Excavator Type
Farmer
Excavator Equipment
Farm Equipment
Work Performed
Agriculture
One Call Notified Ind
No
Service Interruption
Yes
Service Interruption Hours
26
Root Cause Category
Notification Issue
Root Cause Type
No Notification Made To The One-Call Center/811
Preparer Name
M***** E*****
Preparer Title
District Compliance Specalist
Preparer Email
M******@b******.com
Preparer Telephone
219-796-8230
Prepared Date
2016-09-07 00:00:00
Authorizer Name
C****** P********
Authorizer Telephone
610-904-4113
Authorizer Title
Director Regulatory Compliance
Authorizer Email
C*********@b******.com
Narrative
On 10/16/2015 at 14:02 cdt the control center received a leak alarm on the 162 line and within a minute shut down and closed in the pipeline. While the pipeline was being shut down the control center received a call, on the emergency phone number, from a farmer who said he had hit the pipeline while plowing his field. At 15:05 local operation arrived on scene. The pipeline was excavated, as well as the entire pipeline section under where the farmer had plowed in order to inspect for any further damage. No further damage was found, a temporary clamp was applied to the leak, the clamp was leak tested and the line was restarted. The contaminated soil was removed. The damaged section will be removed during the upcoming hydro test. Even though the controller reacted appropriately, out of an abundance of caution the employee was sent out for drug and alcohol testing.
Report Received Date 2015-11-13 00:00:00
Iyear 2015
Report Number 20150404
Supplemental Number 21669
Report Type Supplemental Final
Operator Id 1845 PHMSA Enforcement
Name Buckeye Partners, Lp
Operator Street Address The Buckeye Building 6161 Hamilton Boulevar
Operator City Name Allentown
Operator State Abbreviation PA
Operator Postal Code 18106
Local Datetime 2015-10-16 14:02:00
Location Latitude 39.59606 Google Maps OpenStreetMap
Location Longitude -89.2332 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Gasoline (Non-Ethanol)
Unintentional Release Bbls 24
Recovered Bbls 12
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime 2015-10-16 15:02:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2015-10-16 15:03:00
Restart Datetime 2015-10-17 16:50:00
On Site Datetime 2015-10-16 15:05:00
Nrc Rpt Datetime 2015-10-16 15:03:00
Nrc Rpt Num 1131019 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name 162
Segment Name Du162dh
Onshore State Abbreviation Il
Onshore Postal Code 62568
Onshore City Name Willeys
Onshore County Name Christian
Designated Location Survey Station No.
Designated Name 41213+03
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 12
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 8
Pipe Wall Thickness 0.188
Pipe Smys 42000
Pipe Specification X42
Pipe Seam Type Erw - Low Frequency
Pipe Manufacturer Republic
Pipe Coating Type Coal Tar
Installation Year 1951
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Mechanical Puncture
Puncture Axial 4.5
Puncture Circum 4.5
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
Usa Drinking Ind Yes
Usa Drinking Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 1800
Est Cost Prop Damage 210000
Est Cost Emergency 150000
Est Cost Environmental 75000
Est Cost Other 0
Prpty 436800
Accident Psig 200
Mop Psig 615
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 42983
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind Yes
Cpm Conf Ind Yes
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind Yes
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind Yes
Contractor Drug Test Ind No
Num Employees Tested 1
Num Employees Failed 0
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind No
Notify Cga Dirt No
Private Row Ind Yes
Private Subtype Private Landowner
Excavator Type Farmer
Excavator Equipment Farm Equipment
Work Performed Agriculture
One Call Notified Ind No
Service Interruption Yes
Service Interruption Hours 26
Root Cause Category Notification Issue
Root Cause Type No Notification Made To The One-Call Center/811
Preparer Name M***** E*****
Preparer Title District Compliance Specalist
Preparer Email M******@b******.com
Preparer Telephone 219-796-8230
Prepared Date 2016-09-07 00:00:00
Authorizer Name C****** P********
Authorizer Telephone 610-904-4113
Authorizer Title Director Regulatory Compliance
Authorizer Email C*********@b******.com
Narrative On 10/16/2015 at 14:02 cdt the control center received a leak alarm on the 162 line and within a minute shut down and closed in the pipeline. While the pipeline was being shut down the control center received a call, on the emergency phone number, from a farmer who said he had hit the pipeline while plowing his field. At 15:05 local operation arrived on scene. The pipeline was excavated, as well as the entire pipeline section under where the farmer had plowed in order to inspect for any further damage. No further damage was found, a temporary clamp was applied to the leak, the clamp was leak tested and the line was restarted. The contaminated soil was removed. The damaged section will be removed during the upcoming hydro test. Even though the controller reacted appropriately, out of an abundance of caution the employee was sent out for drug and alcohol testing.

All rights reserved. Copyright © by ClearPHMSA