HL incident on 2015-10-13 — TX

Operator
Sunoco Pipeline L.p.
Cause
Excavation Issue
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$5,000
Incident datetime
2015-10-13 10:00
Report number
Location
TX
Narrative
During excavation activities at diboll station on 10/13/2015, a 1/2" drain line was damaged at a threaded connection resulting in approximately 25 gallons of crude oil being released. The piping and connections were replaced and the contaminated soil was remediated onsite. The release was telephonically reported to the texas railroad commission at 13:35 on 10/13/2015, id no: 1253.
Detailed record list
Report Received Date
2015-11-11 00:00:00
Iyear
2015
Report Number
20150398
Supplemental Number
20892
Report Type
Original Final
Operator Id
Name
Sunoco Pipeline L.p.
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2015-10-13 10:00:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.6
Recovered Bbls
0.6
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2015-10-13 10:00:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Station Was Already Down For Scheduled Maintenance.
On Site Datetime
2015-10-13 10:00:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Diboll Station
Segment Name
21003-10" Nederland To Longview
Onshore State Abbreviation
Tx
Onshore Postal Code
75941
Onshore City Name
Diboll
Onshore County Name
Angelina
Designated Location
Survey Station No.
Designated Name
5233+12.4
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
12
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Auxiliary Piping (E.g. Drain Lines)
Installation Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
26
Est Cost Prop Damage
5000
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Prpty
5026
Accident Psig
14
Mop Psig
908
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Operator's Contractor (Second Party)
Ex Party Type
Excavation Damage By Operator's Contractor (Second Party)
Notify Cga Dirt
No
Pipeline Easement Row Ind
Yes
Excavator Type
Contractor
Excavator Equipment
Backhoe/trackhoe
Work Performed
Liquid Pipeline
One Call Notified Ind
Yes
One Call Ticket Num
1578529240
One Call Center Name
Texas One-Call (811)
Locator Type
Unknown/other
Visible Marks
Unknown/other
Root Cause Category
Excavation Issue
Root Cause Type
Improper Backfilling Practices
Preparer Name
T*** G* N*******
Preparer Title
Dot Compliance Manager
Preparer Email
T*********@s**************.com
Preparer Telephone
281-637-6576
Preparer Fax
877-917-0448
Prepared Date
2015-11-11 00:00:00
Authorizer Name
T*** G* N*******
Authorizer Telephone
281-637-6576
Authorizer Title
Dot Compliance Manager
Authorizer Email
T*********@s**************.com
Narrative
During excavation activities at diboll station on 10/13/2015, a 1/2" drain line was damaged at a threaded connection resulting in approximately 25 gallons of crude oil being released. The piping and connections were replaced and the contaminated soil was remediated onsite. The release was telephonically reported to the texas railroad commission at 13:35 on 10/13/2015, id no: 1253.
Report Received Date 2015-11-11 00:00:00
Iyear 2015
Report Number 20150398
Supplemental Number 20892
Report Type Original Final
Operator Id 18718 PHMSA Enforcement
Name Sunoco Pipeline L.p.
Operator Street Address 1300 Main Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2015-10-13 10:00:00
Location Latitude 31.15885 Google Maps OpenStreetMap
Location Longitude -94.67583 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 0.6
Recovered Bbls 0.6
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2015-10-13 10:00:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain Station Was Already Down For Scheduled Maintenance.
On Site Datetime 2015-10-13 10:00:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Diboll Station
Segment Name 21003-10" Nederland To Longview
Onshore State Abbreviation Tx
Onshore Postal Code 75941
Onshore City Name Diboll
Onshore County Name Angelina
Designated Location Survey Station No.
Designated Name 5233+12.4
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 12
Crossing No
Pipe Facility Type Intrastate
Item Involved Auxiliary Piping (E.g. Drain Lines)
Installation Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Connection Failure
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 26
Est Cost Prop Damage 5000
Est Cost Emergency 0
Est Cost Environmental 0
Est Cost Other 0
Prpty 5026
Accident Psig 14
Mop Psig 908
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Operator's Contractor (Second Party)
Ex Party Type Excavation Damage By Operator's Contractor (Second Party)
Notify Cga Dirt No
Pipeline Easement Row Ind Yes
Excavator Type Contractor
Excavator Equipment Backhoe/trackhoe
Work Performed Liquid Pipeline
One Call Notified Ind Yes
One Call Ticket Num 1578529240
One Call Center Name Texas One-Call (811)
Locator Type Unknown/other
Visible Marks Unknown/other
Root Cause Category Excavation Issue
Root Cause Type Improper Backfilling Practices
Preparer Name T*** G* N*******
Preparer Title Dot Compliance Manager
Preparer Email T*********@s**************.com
Preparer Telephone 281-637-6576
Preparer Fax 877-917-0448
Prepared Date 2015-11-11 00:00:00
Authorizer Name T*** G* N*******
Authorizer Telephone 281-637-6576
Authorizer Title Dot Compliance Manager
Authorizer Email T*********@s**************.com
Narrative During excavation activities at diboll station on 10/13/2015, a 1/2" drain line was damaged at a threaded connection resulting in approximately 25 gallons of crude oil being released. The piping and connections were replaced and the contaminated soil was remediated onsite. The release was telephonically reported to the texas railroad commission at 13:35 on 10/13/2015, id no: 1253.

All rights reserved. Copyright © by ClearPHMSA