HL incident on 2015-10-06 — TX

Operator
Calnev Pipeline Co
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$10,000
Incident datetime
2015-10-06 21:40
Report number
Location
TX
Narrative
At approximately 1912, october 6th, the orange control center controller received a seal leak and high sump level alarm associated with the calnev 8-inch pipeline at the remote baker pump station. The pipeline was shutdown and the baker facility was isolated from the pipeline. Local personnel were dispatched to investigate and on arrival at approximately 2140 found jet-a product released from unit #2 pump seal. Upon further investigation in the morning, it was confirmed that all released product remained within engineered containment (no soil was affected). The release volume has been calculated to be 8.1 gallons. Nrc leak notifications were made per special agreement with san bernardino county. Note: part a, #4; this is the time of discovery by the technician. The leak probably occurred at approximately 1912. .Note: part c, #3, the pump was installed in 1997; the seal had been replaced in 2014.
Detailed record list
Report Received Date
2015-11-02 00:00:00
Iyear
2015
Report Number
20150389
Supplemental Number
20870
Report Type
Original Final
Operator Id
Name
Calnev Pipeline Co
Operator Street Address
1001 Louisiana St, Suite 1000
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2015-10-06 21:40:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
0.2
Recovered Bbls
0.2
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime
2015-10-06 21:40:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2015-10-06 19:12:00
Restart Datetime
2015-10-07 01:33:00
On Site Datetime
2015-10-06 21:40:00
Nrc Rpt Datetime
2015-10-06 22:12:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Baker Pump Station
Segment Name
Ls Ml-001 (Plmp 146.2)
Onshore State Abbreviation
Ca
Onshore Postal Code
92309
Onshore City Name
Baker
Onshore County Name
San Bernardino
Designated Location
Milepost/valve Station
Designated Name
Ml001-Mp146.2
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pump
Installation Year
1997
Material Involved
Material Other Than Carbon Steel
Material Details
Silicone Carbide/tungsten
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
13
Est Cost Prop Damage
10000
Est Cost Emergency
1000
Est Cost Environmental
0
Est Cost Other
0
Prpty
11013
Accident Psig
1639
Mop Psig
2160
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Pump Or Pump-Related Equipment
Eq Failure Type
Pump Or Pump-Related Equipment
Other Pump Ind
Seal/packing Failure
Eq Additional Other Ind
Yes
Eq Additional Other Details
Unpredictable Maintenance Failure
Preparer Name
S**** M*******
Preparer Title
Mgr Ccs
Preparer Email
S*************@k***********.com
Preparer Telephone
9098735146
Preparer Fax
3039843620
Prepared Date
2015-11-02 00:00:00
Authorizer Name
E***** A* F***
Authorizer Telephone
7133699454
Authorizer Title
Dir Ccs
Authorizer Email
B********@k***********.com
Narrative
At approximately 1912, october 6th, the orange control center controller received a seal leak and high sump level alarm associated with the calnev 8-inch pipeline at the remote baker pump station. The pipeline was shutdown and the baker facility was isolated from the pipeline. Local personnel were dispatched to investigate and on arrival at approximately 2140 found jet-a product released from unit #2 pump seal. Upon further investigation in the morning, it was confirmed that all released product remained within engineered containment (no soil was affected). The release volume has been calculated to be 8.1 gallons. Nrc leak notifications were made per special agreement with san bernardino county. Note: part a, #4; this is the time of discovery by the technician. The leak probably occurred at approximately 1912. .Note: part c, #3, the pump was installed in 1997; the seal had been replaced in 2014.
Report Received Date 2015-11-02 00:00:00
Iyear 2015
Report Number 20150389
Supplemental Number 20870
Report Type Original Final
Operator Id 26125 PHMSA Enforcement
Name Calnev Pipeline Co
Operator Street Address 1001 Louisiana St, Suite 1000
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2015-10-06 21:40:00
Location Latitude 35.276957 Google Maps OpenStreetMap
Location Longitude -116.021774 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls 0.2
Recovered Bbls 0.2
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime 2015-10-06 21:40:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2015-10-06 19:12:00
Restart Datetime 2015-10-07 01:33:00
On Site Datetime 2015-10-06 21:40:00
Nrc Rpt Datetime 2015-10-06 22:12:00
Nrc Rpt Num 1130281 NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Baker Pump Station
Segment Name Ls Ml-001 (Plmp 146.2)
Onshore State Abbreviation Ca
Onshore Postal Code 92309
Onshore City Name Baker
Onshore County Name San Bernardino
Designated Location Milepost/valve Station
Designated Name Ml001-Mp146.2
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Pump
Installation Year 1997
Material Involved Material Other Than Carbon Steel
Material Details Silicone Carbide/tungsten
Release Type Leak
Leak Type Seal Or Packing
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 13
Est Cost Prop Damage 10000
Est Cost Emergency 1000
Est Cost Environmental 0
Est Cost Other 0
Prpty 11013
Accident Psig 1639
Mop Psig 2160
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind Yes
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Pump Or Pump-Related Equipment
Eq Failure Type Pump Or Pump-Related Equipment
Other Pump Ind Seal/packing Failure
Eq Additional Other Ind Yes
Eq Additional Other Details Unpredictable Maintenance Failure
Preparer Name S**** M*******
Preparer Title Mgr Ccs
Preparer Email S*************@k***********.com
Preparer Telephone 9098735146
Preparer Fax 3039843620
Prepared Date 2015-11-02 00:00:00
Authorizer Name E***** A* F***
Authorizer Telephone 7133699454
Authorizer Title Dir Ccs
Authorizer Email B********@k***********.com
Narrative At approximately 1912, october 6th, the orange control center controller received a seal leak and high sump level alarm associated with the calnev 8-inch pipeline at the remote baker pump station. The pipeline was shutdown and the baker facility was isolated from the pipeline. Local personnel were dispatched to investigate and on arrival at approximately 2140 found jet-a product released from unit #2 pump seal. Upon further investigation in the morning, it was confirmed that all released product remained within engineered containment (no soil was affected). The release volume has been calculated to be 8.1 gallons. Nrc leak notifications were made per special agreement with san bernardino county. Note: part a, #4; this is the time of discovery by the technician. The leak probably occurred at approximately 1912. .Note: part c, #3, the pump was installed in 1997; the seal had been replaced in 2014.

All rights reserved. Copyright © by ClearPHMSA