HL incident on 2015-09-24 — TX
Operator
Plains Pipeline, L.p.
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$28,000
Incident datetime
2015-09-24 09:45
Report number
Location
TX
Narrative
Approximately 3 bbls of crude oil were released from a 12-inch suction/fill line for tank 1995, as a result of internal corrosion. Plains determined the pipe corroded over time due to lack of flow. The failed piece of pipe has been clamped and operations is preparing to replace this segment. Plains will be conducting a non-destructive examination (nde) inspection at this facility in 2016. Supplemental narrative: part c, number 2 has been updated from 'onshore breakout tank or storage vessel' to onshore terminal/tank farm equipment and piping' following an internal annual review.
Detailed record list
Report Received Date
2015-10-23 00:00:00
Iyear
2015
Report Number
20150375
Supplemental Number
21167
Report Type
Supplemental Final
Operator Id
Name
Plains Pipeline, L.p.
Operator Street Address
333 Clay Street, Suite 1900
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2015-09-24 09:45:00
Location Latitude
31.42565
Location Longitude
-102.32753
Commodity Released Type
Crude Oil
Unintentional Release Bbls
3
Recovered Bbls
3
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2015-09-24 09:45:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2015-09-24 09:50:00
Restart Datetime
2015-09-24 13:30:00
On Site Datetime
2015-09-24 09:45:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Crane East
Segment Name
Tank 1995
Onshore State Abbreviation
Tx
Onshore Postal Code
79731
Onshore City Name
Crane
Onshore County Name
Crane
Designated Location
Milepost/valve Station
Designated Name
Tank 1995
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
24
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
12.75
Pipe Wall Thickness
0.365
Pipe Smys
24000
Pipe Specification
Unknown.
Pipe Seam Type
Erw - Low Frequency
Pipe Manufacturer
Unknown.
Pipe Coating Type
Coal Tar
Installation Year
1956
Manufactured Year
1956
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
150
Est Cost Prop Damage
28000
Est Cost Emergency
1100
Est Cost Environmental
0
Est Cost Other
0
Prpty
29250
Accident Psig
35
Mop Psig
275
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Water Acid Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
C******* C*****
Preparer Title
Compliance Specialist
Preparer Email
C*******@p****.com
Preparer Telephone
713-993-5080
Preparer Fax
713-646-4310
Prepared Date
2016-02-25 00:00:00
Authorizer Name
T***** M*****
Authorizer Telephone
713-646-4109
Authorizer Title
Sr Dir Of Environmental And Regulatory Compliance
Authorizer Email
T*******@p****.com
Narrative
Approximately 3 bbls of crude oil were released from a 12-inch suction/fill line for tank 1995, as a result of internal corrosion. Plains determined the pipe corroded over time due to lack of flow. The failed piece of pipe has been clamped and operations is preparing to replace this segment. Plains will be conducting a non-destructive examination (nde) inspection at this facility in 2016. Supplemental narrative: part c, number 2 has been updated from 'onshore breakout tank or storage vessel' to onshore terminal/tank farm equipment and piping' following an internal annual review.
| Report Received Date | 2015-10-23 00:00:00 |
|---|---|
| Iyear | 2015 |
| Report Number | 20150375 |
| Supplemental Number | 21167 |
| Report Type | Supplemental Final |
| Operator Id | 300 PHMSA Enforcement |
| Name | Plains Pipeline, L.p. |
| Operator Street Address | 333 Clay Street, Suite 1900 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2015-09-24 09:45:00 |
| Location Latitude | 31.42565 Google Maps OpenStreetMap |
| Location Longitude | -102.32753 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 3 |
| Recovered Bbls | 3 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Contractor Working For The Operator |
| Incident Identified Datetime | 2015-09-24 09:45:00 |
| System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2015-09-24 09:50:00 |
| Restart Datetime | 2015-09-24 13:30:00 |
| On Site Datetime | 2015-09-24 09:45:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Crane East |
| Segment Name | Tank 1995 |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 79731 |
| Onshore City Name | Crane |
| Onshore County Name | Crane |
| Designated Location | Milepost/valve Station |
| Designated Name | Tank 1995 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 24 |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 12.75 |
| Pipe Wall Thickness | 0.365 |
| Pipe Smys | 24000 |
| Pipe Specification | Unknown. |
| Pipe Seam Type | Erw - Low Frequency |
| Pipe Manufacturer | Unknown. |
| Pipe Coating Type | Coal Tar |
| Installation Year | 1956 |
| Manufactured Year | 1956 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 150 |
| Est Cost Prop Damage | 28000 |
| Est Cost Emergency | 1100 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 29250 |
| Accident Psig | 35 |
| Mop Psig | 275 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | < 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | Internal Corrosion |
| Internal External | Internal Corrosion |
| Int Visual Exam Results | Localized Pitting |
| Int Water Acid Ind | Yes |
| Int Field Exam Basis Ind | Yes |
| Int Low Point Pipe Loc Ind | Yes |
| Corrosion Inhibitors | Yes |
| Corrosion Lining | No |
| Cleaning Dewatering | Not Applicable - Not Mainline Pipe |
| Corrosion Coupons | Not Applicable - Not Mainline Pipe |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | C******* C***** |
| Preparer Title | Compliance Specialist |
| Preparer Email | C*******@p****.com |
| Preparer Telephone | 713-993-5080 |
| Preparer Fax | 713-646-4310 |
| Prepared Date | 2016-02-25 00:00:00 |
| Authorizer Name | T***** M***** |
| Authorizer Telephone | 713-646-4109 |
| Authorizer Title | Sr Dir Of Environmental And Regulatory Compliance |
| Authorizer Email | T*******@p****.com |
| Narrative | Approximately 3 bbls of crude oil were released from a 12-inch suction/fill line for tank 1995, as a result of internal corrosion. Plains determined the pipe corroded over time due to lack of flow. The failed piece of pipe has been clamped and operations is preparing to replace this segment. Plains will be conducting a non-destructive examination (nde) inspection at this facility in 2016. Supplemental narrative: part c, number 2 has been updated from 'onshore breakout tank or storage vessel' to onshore terminal/tank farm equipment and piping' following an internal annual review. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA