HL incident on 2015-09-23 — PA

Operator
Buckeye Partners, Lp
Cause
Corrosion Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$150,000
Incident datetime
2015-09-23 14:00
Report number
Location
PA
Narrative
At 9/23/2015 14:00, local buckeye operations personnel were performing a pressure test on a repaired pipeline in springfield ma, on the section of line 915 right of way between agnew junction and ati delivery facility. The purpose of this pressure test was for verification of the repair of nrc incident 1127403. Unsatisfactory pressure test results prompted an investigation, which led to the discovery of this release. The pipeline was not running at the time of discovery. It has been estimated that approximately 2.9 barrels of transmix was released, and 2.9 barrels has been recovered. All free product has been recovered, and all effected stones/soil has been removed. No further remediation is necessary. There were no injuries. An investigation into the root cause is on-going. Update on 09/06/2016: the metallurgical cause of the through-wall leak was external pitting corrosion in an area where the pipe coating had failed.
Detailed record list
Report Received Date
2015-10-23 00:00:00
Iyear
2015
Report Number
20150373
Supplemental Number
23043
Report Type
Supplemental Final
Operator Id
Name
Buckeye Partners, Lp
Operator Street Address
The Buckeye Building 6161 Hamilton Boulevar
Operator City Name
Allentown
Operator State Abbreviation
PA
Operator Postal Code
18106
Local Datetime
2015-09-23 14:00:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Mixture Of Refined Products (Transmix Or Other Mixture)
Unintentional Release Bbls
2.9
Recovered Bbls
2.9
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2015-09-23 14:00:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
The Line Was Not Running At The Time Of Discovery
On Site Datetime
2015-09-23 14:00:00
Nrc Rpt Datetime
2015-09-23 14:46:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Agnew Street Junction To Ati Terminal
Segment Name
Gw999a4
Onshore State Abbreviation
Ma
Onshore Postal Code
01109
Onshore City Name
Springfield
Onshore County Name
Hampden
Designated Location
Survey Station No.
Designated Name
100671
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
36
Crossing
Yes
Road Crossing Ind
Yes
Road Type
Cased
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8.625
Pipe Wall Thickness
0.322
Pipe Smys
52000
Pipe Specification
Api-5l
Pipe Seam Type
Erw � Unknown Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Coal Tar
Installation Year
1961
Manufactured Year
1961
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Pinhole
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
6000
Est Cost Gas Released
12000
Est Cost Prop Damage
150000
Est Cost Emergency
120000
Est Cost Environmental
140443
Est Cost Other
0
Prpty
428443
Accident Psig
60
Mop Psig
240
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
900
Internal Inspection Ind
No
Tight Mitered Ind
Yes
Other Inspection Ind
Yes
Internal Inspection Details
The Launch And Recovery Side Manifolds Are Not Suitable For Ili Tools
Operation Complications Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
Localized Pitting
Other Corrosion Ind
Yes
Corrosion Type Details
External Pitting Corrosion
Metallurgical Basis Ind
Yes
Underground Location
Yes
Under Cathodic Protection Ind
Yes
Cathodic Pro Start Year
Unknown
Shielding Evident
Yes
Cathodic Survey Type
Yes
Cp Annual Survey Ind
Yes
Close Interval Survey Ind
Yes
Cp Annual Survey Year
2015
Close Interval Survey Year
2015
Prior Damage
Yes
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2011
Hydrtst Most Rcnt Pressure
450
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
C********** A S********
Preparer Title
Senior Compliance Specialist
Preparer Email
C*********@b******.com
Preparer Telephone
610-904-4410
Prepared Date
2018-01-15 00:00:00
Authorizer Name
C****** P********
Authorizer Telephone
610-904-4113
Authorizer Title
Director Regulatory Compliance
Authorizer Email
C*********@b******.com
Narrative
At 9/23/2015 14:00, local buckeye operations personnel were performing a pressure test on a repaired pipeline in springfield ma, on the section of line 915 right of way between agnew junction and ati delivery facility. The purpose of this pressure test was for verification of the repair of nrc incident 1127403. Unsatisfactory pressure test results prompted an investigation, which led to the discovery of this release. The pipeline was not running at the time of discovery. It has been estimated that approximately 2.9 barrels of transmix was released, and 2.9 barrels has been recovered. All free product has been recovered, and all effected stones/soil has been removed. No further remediation is necessary. There were no injuries. An investigation into the root cause is on-going. Update on 09/06/2016: the metallurgical cause of the through-wall leak was external pitting corrosion in an area where the pipe coating had failed.
Report Received Date 2015-10-23 00:00:00
Iyear 2015
Report Number 20150373
Supplemental Number 23043
Report Type Supplemental Final
Operator Id 1845 PHMSA Enforcement
Name Buckeye Partners, Lp
Operator Street Address The Buckeye Building 6161 Hamilton Boulevar
Operator City Name Allentown
Operator State Abbreviation PA
Operator Postal Code 18106
Local Datetime 2015-09-23 14:00:00
Location Latitude 42.115822 Google Maps OpenStreetMap
Location Longitude -72.580744 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Mixture Of Refined Products (Transmix Or Other Mixture)
Unintentional Release Bbls 2.9
Recovered Bbls 2.9
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2015-09-23 14:00:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain The Line Was Not Running At The Time Of Discovery
On Site Datetime 2015-09-23 14:00:00
Nrc Rpt Datetime 2015-09-23 14:46:00
Nrc Rpt Num 1129207 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name Agnew Street Junction To Ati Terminal
Segment Name Gw999a4
Onshore State Abbreviation Ma
Onshore Postal Code 01109
Onshore City Name Springfield
Onshore County Name Hampden
Designated Location Survey Station No.
Designated Name 100671
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 36
Crossing Yes
Road Crossing Ind Yes
Road Type Cased
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 8.625
Pipe Wall Thickness 0.322
Pipe Smys 52000
Pipe Specification Api-5l
Pipe Seam Type Erw � Unknown Frequency
Pipe Manufacturer Unknown
Pipe Coating Type Coal Tar
Installation Year 1961
Manufactured Year 1961
Material Involved Carbon Steel
Release Type Other
Release Type Details Pinhole
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Est Cost Oper Paid 6000
Est Cost Gas Released 12000
Est Cost Prop Damage 150000
Est Cost Emergency 120000
Est Cost Environmental 140443
Est Cost Other 0
Prpty 428443
Accident Psig 60
Mop Psig 240
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 900
Internal Inspection Ind No
Tight Mitered Ind Yes
Other Inspection Ind Yes
Internal Inspection Details The Launch And Recovery Side Manifolds Are Not Suitable For Ili Tools
Operation Complications Ind No
Pipeline Function < 20% Smys Regulated Transmission
Scada In Place Ind No
Cpm In Place Ind No
Investigation Status No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details External Corrosion
Internal External External Corrosion
Visual Exam Results Localized Pitting
Other Corrosion Ind Yes
Corrosion Type Details External Pitting Corrosion
Metallurgical Basis Ind Yes
Underground Location Yes
Under Cathodic Protection Ind Yes
Cathodic Pro Start Year Unknown
Shielding Evident Yes
Cathodic Survey Type Yes
Cp Annual Survey Ind Yes
Close Interval Survey Ind Yes
Cp Annual Survey Year 2015
Close Interval Survey Year 2015
Prior Damage Yes
Collected Data Ind No
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 2011
Hydrtst Most Rcnt Pressure 450
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name C********** A S********
Preparer Title Senior Compliance Specialist
Preparer Email C*********@b******.com
Preparer Telephone 610-904-4410
Prepared Date 2018-01-15 00:00:00
Authorizer Name C****** P********
Authorizer Telephone 610-904-4113
Authorizer Title Director Regulatory Compliance
Authorizer Email C*********@b******.com
Narrative At 9/23/2015 14:00, local buckeye operations personnel were performing a pressure test on a repaired pipeline in springfield ma, on the section of line 915 right of way between agnew junction and ati delivery facility. The purpose of this pressure test was for verification of the repair of nrc incident 1127403. Unsatisfactory pressure test results prompted an investigation, which led to the discovery of this release. The pipeline was not running at the time of discovery. It has been estimated that approximately 2.9 barrels of transmix was released, and 2.9 barrels has been recovered. All free product has been recovered, and all effected stones/soil has been removed. No further remediation is necessary. There were no injuries. An investigation into the root cause is on-going. Update on 09/06/2016: the metallurgical cause of the through-wall leak was external pitting corrosion in an area where the pipe coating had failed.