HL incident on 2015-09-25 — GA
Operator
Colonial Pipeline Co
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$500
Incident datetime
2015-09-25 23:31
Report number
Location
GA
Narrative
On 9/25/2015, at 23:00, the gasket at the four-inch vent pipe flange failed on the line 02 prover at houston station. The release was discovered by an employee at 23:31 and the line was immediately shutdown and the station and prover isolated. A technician responded at approximately 00:15 on 9/26/2015 and completed further isolation (lockout/tagout) and draining of the prover. The line was restarted on 9/26/15 at 01:38. On 9/26/15 at 09:20 the texas state emergency response center was notified and they in turn notified tceq. The nrc was notified on monday 9/28/2015 at 15:11 when it was determined that the cost of cleanup and recovery were likely going to exceed $50,000. The failed gasket was installed by a qualified colonial technician in january 2015 following a water draw of the prover. Incident analysis of the event determined that the basic causes of the gasket failure were: 1.) failure to follow colonial's cm-111 bolted connections procedure when the gasket was replaced in january 2015. 2.) failure to follow colonial's material & equipment specification ms-07-06 for proper marking of gaskets with date of manufacture and receipt when the gasket was received at the warehouse. Following the determination that the technician's actions were a contributing factor to the accident, the technician's oq qualification to perform flange bolting procedures was disqualified in accordance with colonial's operator qualification program manual. As a remedial action, the technician was required to re-qualify using the performance verification method. Two corrective actions have been identified to improve the process of tracking gasket shelf life.
Detailed record list
Report Received Date
2015-10-22 00:00:00
Iyear
2015
Report Number
20150369
Supplemental Number
20997
Report Type
Supplemental Final
Operator Id
2552
Name
Colonial Pipeline Co
Operator Street Address
1000 Lake St.
Operator City Name
Alpharetta
Operator State Abbreviation
GA
Operator Postal Code
30009
Local Datetime
2015-09-25 23:30:00
Location Latitude
29.71897
Location Longitude
-95.1793
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
38.7
Recovered Bbls
38.5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2015-09-25 23:31:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2015-09-25 23:31:00
Restart Datetime
2015-09-26 01:38:00
On Site Datetime
2015-09-25 23:31:00
Nrc Rpt Datetime
2015-09-28 15:04:00
Nrc Rpt Num
1129595
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Houston Station
Segment Name
Line 2 Prover
Onshore State Abbreviation
Tx
Onshore Postal Code
77506
Onshore City Name
Pasadena
Onshore County Name
Harris
Designated Location
Milepost/valve Station
Designated Name
Location 0120
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Meter/prover
Installation Year
2010
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
Yes
Remediation Ind
Yes
Groundwater Remed Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
5500
Est Cost Prop Damage
500
Est Cost Emergency
45000
Est Cost Environmental
249000
Est Cost Other
0
Prpty
300000
Accident Psig
156
Mop Psig
275
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The release resulted from a failed gasket.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
Gasket
Additional Installation Ind
Yes
Preparer Name
K**** M****
Preparer Title
Compliance Coordinator
Preparer Email
K*****@c******.com
Preparer Telephone
601-765-9168
Preparer Fax
770-754-8489
Prepared Date
2015-12-17 00:00:00
Authorizer Name
D*** L*****
Authorizer Telephone
678-7622872
Authorizer Title
Manager Phmsa Regulatory Compliance
Authorizer Email
D*******@c******.com
Narrative
On 9/25/2015, at 23:00, the gasket at the four-inch vent pipe flange failed on the line 02 prover at houston station. The release was discovered by an employee at 23:31 and the line was immediately shutdown and the station and prover isolated. A technician responded at approximately 00:15 on 9/26/2015 and completed further isolation (lockout/tagout) and draining of the prover. The line was restarted on 9/26/15 at 01:38. On 9/26/15 at 09:20 the texas state emergency response center was notified and they in turn notified tceq. The nrc was notified on monday 9/28/2015 at 15:11 when it was determined that the cost of cleanup and recovery were likely going to exceed $50,000. The failed gasket was installed by a qualified colonial technician in january 2015 following a water draw of the prover. Incident analysis of the event determined that the basic causes of the gasket failure were: 1.) failure to follow colonial's cm-111 bolted connections procedure when the gasket was replaced in january 2015. 2.) failure to follow colonial's material & equipment specification ms-07-06 for proper marking of gaskets with date of manufacture and receipt when the gasket was received at the warehouse. Following the determination that the technician's actions were a contributing factor to the accident, the technician's oq qualification to perform flange bolting procedures was disqualified in accordance with colonial's operator qualification program manual. As a remedial action, the technician was required to re-qualify using the performance verification method. Two corrective actions have been identified to improve the process of tracking gasket shelf life.
| Report Received Date | 2015-10-22 00:00:00 |
|---|---|
| Iyear | 2015 |
| Report Number | 20150369 |
| Supplemental Number | 20997 |
| Report Type | Supplemental Final |
| Operator Id | 2552 PHMSA Enforcement |
| Name | Colonial Pipeline Co |
| Operator Street Address | 1000 Lake St. |
| Operator City Name | Alpharetta |
| Operator State Abbreviation | GA |
| Operator Postal Code | 30009 |
| Local Datetime | 2015-09-25 23:30:00 |
| Location Latitude | 29.71897 Google Maps OpenStreetMap |
| Location Longitude | -95.1793 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Diesel, Fuel Oil, Kerosene, Jet Fuel |
| Unintentional Release Bbls | 38.7 |
| Recovered Bbls | 38.5 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2015-09-25 23:31:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2015-09-25 23:31:00 |
| Restart Datetime | 2015-09-26 01:38:00 |
| On Site Datetime | 2015-09-25 23:31:00 |
| Nrc Rpt Datetime | 2015-09-28 15:04:00 |
| Nrc Rpt Num | 1129595 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Houston Station |
| Segment Name | Line 2 Prover |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 77506 |
| Onshore City Name | Pasadena |
| Onshore County Name | Harris |
| Designated Location | Milepost/valve Station |
| Designated Name | Location 0120 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Meter/prover |
| Installation Year | 2010 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | Yes |
| Remediation Ind | Yes |
| Groundwater Remed Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Usa Drinking Ind | Yes |
| Usa Drinking Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 5500 |
| Est Cost Prop Damage | 500 |
| Est Cost Emergency | 45000 |
| Est Cost Environmental | 249000 |
| Est Cost Other | 0 |
| Prpty | 300000 |
| Accident Psig | 156 |
| Mop Psig | 275 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | The release resulted from a failed gasket. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Non-Threaded Connection Failure |
| Eq Failure Type | Non-Threaded Connection Failure |
| Other Non Threaded Ind | Gasket |
| Additional Installation Ind | Yes |
| Preparer Name | K**** M**** |
| Preparer Title | Compliance Coordinator |
| Preparer Email | K*****@c******.com |
| Preparer Telephone | 601-765-9168 |
| Preparer Fax | 770-754-8489 |
| Prepared Date | 2015-12-17 00:00:00 |
| Authorizer Name | D*** L***** |
| Authorizer Telephone | 678-7622872 |
| Authorizer Title | Manager Phmsa Regulatory Compliance |
| Authorizer Email | D*******@c******.com |
| Narrative | On 9/25/2015, at 23:00, the gasket at the four-inch vent pipe flange failed on the line 02 prover at houston station. The release was discovered by an employee at 23:31 and the line was immediately shutdown and the station and prover isolated. A technician responded at approximately 00:15 on 9/26/2015 and completed further isolation (lockout/tagout) and draining of the prover. The line was restarted on 9/26/15 at 01:38. On 9/26/15 at 09:20 the texas state emergency response center was notified and they in turn notified tceq. The nrc was notified on monday 9/28/2015 at 15:11 when it was determined that the cost of cleanup and recovery were likely going to exceed $50,000. The failed gasket was installed by a qualified colonial technician in january 2015 following a water draw of the prover. Incident analysis of the event determined that the basic causes of the gasket failure were: 1.) failure to follow colonial's cm-111 bolted connections procedure when the gasket was replaced in january 2015. 2.) failure to follow colonial's material & equipment specification ms-07-06 for proper marking of gaskets with date of manufacture and receipt when the gasket was received at the warehouse. Following the determination that the technician's actions were a contributing factor to the accident, the technician's oq qualification to perform flange bolting procedures was disqualified in accordance with colonial's operator qualification program manual. As a remedial action, the technician was required to re-qualify using the performance verification method. Two corrective actions have been identified to improve the process of tracking gasket shelf life. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA