HL incident on 2015-08-06 — OK

Operator
Williams Field Services
Cause
Excavation Issue
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$200,000
Incident datetime
2015-08-06 15:20
Report number
Location
OK
Narrative
On august 6, 2015 at 14:09 pm, a third-party contractor was excavating with a trenching machine across the right of way, striking the lucerne lateral of the overland pass pipeline system. The pipe wall was penetrated, and the equipment operator immediately evacuated. The fumes migrated to a tank battery and vapor combustion unit approximately 200 yards from the location of the strike, which ignited the vapor per eyewitness accounts. At 15:20, williams received call from kersey colorado fire department reporting a fire. At 15:51, two oppl op/techs responded to reported release location. Fire department evacuated a 2 mile area. At 16:50, an op/tech closed the block value at lucerne junction which isolated the lucerne lateral from the dj lateral mainline. At 17:30, an op/tech closed the lucerne lateral block valve, isolating the lucerne plant from the lateral. The fire continued to burn through the night and at low levels until august 8. On august 9, williams completed repairs to the pipeline and at 15:50 the line was returned to service.
Detailed record list
Report Received Date
2015-09-03 00:00:00
Iyear
2015
Report Number
20150316
Supplemental Number
20833
Report Type
Supplemental Final
Operator Id
Name
Williams Field Services
Operator Street Address
One Williams Center Wrc-3
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74172
Local Datetime
2015-08-06 14:09:00
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls
1300
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Emergency Responder
Incident Identified Datetime
2015-08-06 15:20:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2015-08-06 15:40:00
Restart Datetime
2015-08-09 21:40:00
On Site Datetime
2015-08-06 15:51:00
Nrc Rpt Datetime
2015-08-06 17:20:00
Nrc Rpt Num
Ignite Ind
Yes
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Overland Pass Pipeline
Segment Name
Lucerne Lateral
Onshore State Abbreviation
Co
Onshore Postal Code
80624
Onshore City Name
Gill
Onshore County Name
Weld
Designated Location
Survey Station No.
Designated Name
62477
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
Unknown
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
6.625
Pipe Wall Thickness
0.188
Pipe Smys
52000
Pipe Specification
Api 5l
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Tubular Products
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Installation Year
2009
Manufactured Year
2008
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
4
Puncture Circum
6
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
300000
Est Cost Gas Released
100000
Est Cost Prop Damage
200000
Est Cost Emergency
20000
Est Cost Environmental
5000
Est Cost Other
0
Prpty
625000
Accident Psig
980
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
37171
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
Notify Cga Dirt
No
Public Row Ind
Yes
Public Subtype
Other
Excavator Type
Contractor
Excavator Equipment
Trencher
Work Performed
Liquid Pipeline
One Call Notified Ind
Yes
One Call Ticket Num
52040225000
Locator Type
Contract Locator
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
78
Root Cause Category
Excavation Issue
Root Cause Type
Improper Excavation Practice Not Listed Above
Preparer Name
M****** V** H***
Preparer Title
Pipeline Safety Engineer
Preparer Email
M**************@w*******.com
Preparer Telephone
801-584-6931
Prepared Date
2015-10-21 00:00:00
Authorizer Name
J**** E********
Authorizer Telephone
801-584-6539
Authorizer Title
Pipeline Safety Manager
Authorizer Email
J**************@w*******.com
Narrative
On august 6, 2015 at 14:09 pm, a third-party contractor was excavating with a trenching machine across the right of way, striking the lucerne lateral of the overland pass pipeline system. The pipe wall was penetrated, and the equipment operator immediately evacuated. The fumes migrated to a tank battery and vapor combustion unit approximately 200 yards from the location of the strike, which ignited the vapor per eyewitness accounts. At 15:20, williams received call from kersey colorado fire department reporting a fire. At 15:51, two oppl op/techs responded to reported release location. Fire department evacuated a 2 mile area. At 16:50, an op/tech closed the block value at lucerne junction which isolated the lucerne lateral from the dj lateral mainline. At 17:30, an op/tech closed the lucerne lateral block valve, isolating the lucerne plant from the lateral. The fire continued to burn through the night and at low levels until august 8. On august 9, williams completed repairs to the pipeline and at 15:50 the line was returned to service.
Report Received Date 2015-09-03 00:00:00
Iyear 2015
Report Number 20150316
Supplemental Number 20833
Report Type Supplemental Final
Operator Id 30826 PHMSA Enforcement
Name Williams Field Services
Operator Street Address One Williams Center Wrc-3
Operator City Name Tulsa
Operator State Abbreviation OK
Operator Postal Code 74172
Local Datetime 2015-08-06 14:09:00
Location Latitude 40.45772 Google Maps OpenStreetMap
Location Longitude -104.44393 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls 1300
Intentional Release Bbls 0
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Notification From Emergency Responder
Incident Identified Datetime 2015-08-06 15:20:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2015-08-06 15:40:00
Restart Datetime 2015-08-09 21:40:00
On Site Datetime 2015-08-06 15:51:00
Nrc Rpt Datetime 2015-08-06 17:20:00
Nrc Rpt Num 1124936 NRC Report How to search
Ignite Ind Yes
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name Overland Pass Pipeline
Segment Name Lucerne Lateral
Onshore State Abbreviation Co
Onshore Postal Code 80624
Onshore City Name Gill
Onshore County Name Weld
Designated Location Survey Station No.
Designated Name 62477
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover Unknown
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 6.625
Pipe Wall Thickness 0.188
Pipe Smys 52000
Pipe Specification Api 5l
Pipe Seam Type Erw - High Frequency
Pipe Manufacturer Tubular Products
Pipe Coating Type Fusion Bonded Epoxy(Fbe)
Installation Year 2009
Manufactured Year 2008
Material Involved Carbon Steel
Release Type Mechanical Puncture
Puncture Axial 4
Puncture Circum 6
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 300000
Est Cost Gas Released 100000
Est Cost Prop Damage 200000
Est Cost Emergency 20000
Est Cost Environmental 5000
Est Cost Other 0
Prpty 625000
Accident Psig 980
Mop Psig 1440
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 37171
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind Yes
Cpm Conf Ind Yes
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind Yes
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind Yes
One Call System Ind Yes
Notify Cga Dirt No
Public Row Ind Yes
Public Subtype Other
Excavator Type Contractor
Excavator Equipment Trencher
Work Performed Liquid Pipeline
One Call Notified Ind Yes
One Call Ticket Num 52040225000
Locator Type Contract Locator
Visible Marks Yes
Service Interruption Yes
Service Interruption Hours 78
Root Cause Category Excavation Issue
Root Cause Type Improper Excavation Practice Not Listed Above
Preparer Name M****** V** H***
Preparer Title Pipeline Safety Engineer
Preparer Email M**************@w*******.com
Preparer Telephone 801-584-6931
Prepared Date 2015-10-21 00:00:00
Authorizer Name J**** E********
Authorizer Telephone 801-584-6539
Authorizer Title Pipeline Safety Manager
Authorizer Email J**************@w*******.com
Narrative On august 6, 2015 at 14:09 pm, a third-party contractor was excavating with a trenching machine across the right of way, striking the lucerne lateral of the overland pass pipeline system. The pipe wall was penetrated, and the equipment operator immediately evacuated. The fumes migrated to a tank battery and vapor combustion unit approximately 200 yards from the location of the strike, which ignited the vapor per eyewitness accounts. At 15:20, williams received call from kersey colorado fire department reporting a fire. At 15:51, two oppl op/techs responded to reported release location. Fire department evacuated a 2 mile area. At 16:50, an op/tech closed the block value at lucerne junction which isolated the lucerne lateral from the dj lateral mainline. At 17:30, an op/tech closed the lucerne lateral block valve, isolating the lucerne plant from the lateral. The fire continued to burn through the night and at low levels until august 8. On august 9, williams completed repairs to the pipeline and at 15:50 the line was returned to service.

All rights reserved. Copyright © by ClearPHMSA