HL incident on 2015-06-30 — CO

Operator
Western Refining Pipeline, Llc
Cause
Notification Issue
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$35,000
Incident datetime
2015-06-30 13:20
Report number
Location
CO
Narrative
On june 30, 2015 at 13:06 hospah leak alarm was acknowledged by controllers, investigation of psi drop checking for pig arrival at gallup and verifying drag reduction agent (dra). At 13:20, pipeline field operator reports navajo DOT backhoe operator (blade operator) has hit hospah 6", requests shutdown of line. 13:21 hospah line is shut down. At 14:21 block valves el bv 28 and 37 are closed. At 14:27 pipeline operator is onsite, securing site and reporting conditions. 14:38 national response center (nrc) is notified. At 16:05 no one call ticket from navajo DOT had been received. 16:42 western refining emergency one call is received, all response personnel are onsite, cleanup and repair to begin within two hours of the emergency one call. At 18:35, 10 belly dump trucks and 2 backhoes will be on site by 08:00. July 1, 2015, 07:15 block valves had been re-opened, hospah station restarted. Cleanup operations continuing to meet the bureau of indian affairs standards.
Detailed record list
Report Received Date
2015-07-30 00:00:00
Iyear
2015
Report Number
20150272
Supplemental Number
21041
Report Type
Supplemental Final
Operator Id
Name
Western Refining Pipeline, Llc
Operator Street Address
1515 Arapahoe St. Tower 1; Suite 1600
Operator City Name
Denver
Operator State Abbreviation
CO
Operator Postal Code
80202
Local Datetime
2015-06-30 12:55:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
682
Recovered Bbls
682
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Third Party That Caused The Accident
Incident Identified Datetime
2015-06-30 13:20:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2015-06-30 13:21:00
Restart Datetime
2015-07-01 07:15:00
On Site Datetime
2015-06-30 14:27:00
Nrc Rpt Datetime
2015-06-30 14:38:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Milepost 33
Segment Name
Hospah To Gallup Refinery
Onshore State Abbreviation
Nm
Onshore Postal Code
87313
Onshore City Name
Not Within A Municipality
Onshore County Name
Mckinley
Designated Location
Milepost/valve Station
Designated Name
Milepost
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
Unknown
Crossing
Yes
Road Crossing Ind
Yes
Road Type
Uncased
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
6
Pipe Wall Thickness
0.156
Pipe Smys
35000
Pipe Specification
Grade B
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Coal Tar
Installation Year
1973
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
13
Puncture Circum
9
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
31693
Est Cost Prop Damage
35000
Est Cost Emergency
10000
Est Cost Environmental
338307
Est Cost Other
0
Prpty
415000
Accident Psig
330
Mop Psig
1360
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
67591
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Pipeline was struck by a third party.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
No
Notify Cga Dirt
Yes
Private Row Ind
Yes
Private Subtype
Private Landowner
Excavator Type
Municipality
Excavator Equipment
Grader/scraper
Work Performed
Grading
One Call Notified Ind
No
Service Interruption
Yes
Service Interruption Hours
18
Root Cause Category
Notification Issue
Root Cause Type
No Notification Made To The One-Call Center/811
Preparer Name
D*** R*******
Preparer Title
Regulatory Compliance Supervisor
Preparer Email
D************@w**.com
Preparer Telephone
(505) 632-8006
Preparer Fax
(505) 632-4021
Prepared Date
2016-01-11 00:00:00
Authorizer Name
D*** R*******
Authorizer Telephone
(505) 632-8006
Authorizer Title
Regulatory Compliance Supervisor
Authorizer Email
D************@w**.com
Narrative
On june 30, 2015 at 13:06 hospah leak alarm was acknowledged by controllers, investigation of psi drop checking for pig arrival at gallup and verifying drag reduction agent (dra). At 13:20, pipeline field operator reports navajo DOT backhoe operator (blade operator) has hit hospah 6", requests shutdown of line. 13:21 hospah line is shut down. At 14:21 block valves el bv 28 and 37 are closed. At 14:27 pipeline operator is onsite, securing site and reporting conditions. 14:38 national response center (nrc) is notified. At 16:05 no one call ticket from navajo DOT had been received. 16:42 western refining emergency one call is received, all response personnel are onsite, cleanup and repair to begin within two hours of the emergency one call. At 18:35, 10 belly dump trucks and 2 backhoes will be on site by 08:00. July 1, 2015, 07:15 block valves had been re-opened, hospah station restarted. Cleanup operations continuing to meet the bureau of indian affairs standards.
Report Received Date 2015-07-30 00:00:00
Iyear 2015
Report Number 20150272
Supplemental Number 21041
Report Type Supplemental Final
Operator Id 31574 PHMSA Enforcement
Name Western Refining Pipeline, Llc
Operator Street Address 1515 Arapahoe St. Tower 1; Suite 1600
Operator City Name Denver
Operator State Abbreviation CO
Operator Postal Code 80202
Local Datetime 2015-06-30 12:55:00
Location Latitude 35.5314135 Google Maps OpenStreetMap
Location Longitude -108.210311 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 682
Recovered Bbls 682
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Notification From Third Party That Caused The Accident
Incident Identified Datetime 2015-06-30 13:20:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2015-06-30 13:21:00
Restart Datetime 2015-07-01 07:15:00
On Site Datetime 2015-06-30 14:27:00
Nrc Rpt Datetime 2015-06-30 14:38:00
Nrc Rpt Num 1121456 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name Milepost 33
Segment Name Hospah To Gallup Refinery
Onshore State Abbreviation Nm
Onshore Postal Code 87313
Onshore City Name Not Within A Municipality
Onshore County Name Mckinley
Designated Location Milepost/valve Station
Designated Name Milepost
Federal No
Location Type Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover Unknown
Crossing Yes
Road Crossing Ind Yes
Road Type Uncased
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 6
Pipe Wall Thickness 0.156
Pipe Smys 35000
Pipe Specification Grade B
Pipe Seam Type Erw - High Frequency
Pipe Manufacturer Unknown
Pipe Coating Type Coal Tar
Installation Year 1973
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Mechanical Puncture
Puncture Axial 13
Puncture Circum 9
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 31693
Est Cost Prop Damage 35000
Est Cost Emergency 10000
Est Cost Environmental 338307
Est Cost Other 0
Prpty 415000
Accident Psig 330
Mop Psig 1360
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 67591
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Pipeline was struck by a third party.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind No
Notify Cga Dirt Yes
Private Row Ind Yes
Private Subtype Private Landowner
Excavator Type Municipality
Excavator Equipment Grader/scraper
Work Performed Grading
One Call Notified Ind No
Service Interruption Yes
Service Interruption Hours 18
Root Cause Category Notification Issue
Root Cause Type No Notification Made To The One-Call Center/811
Preparer Name D*** R*******
Preparer Title Regulatory Compliance Supervisor
Preparer Email D************@w**.com
Preparer Telephone (505) 632-8006
Preparer Fax (505) 632-4021
Prepared Date 2016-01-11 00:00:00
Authorizer Name D*** R*******
Authorizer Telephone (505) 632-8006
Authorizer Title Regulatory Compliance Supervisor
Authorizer Email D************@w**.com
Narrative On june 30, 2015 at 13:06 hospah leak alarm was acknowledged by controllers, investigation of psi drop checking for pig arrival at gallup and verifying drag reduction agent (dra). At 13:20, pipeline field operator reports navajo DOT backhoe operator (blade operator) has hit hospah 6", requests shutdown of line. 13:21 hospah line is shut down. At 14:21 block valves el bv 28 and 37 are closed. At 14:27 pipeline operator is onsite, securing site and reporting conditions. 14:38 national response center (nrc) is notified. At 16:05 no one call ticket from navajo DOT had been received. 16:42 western refining emergency one call is received, all response personnel are onsite, cleanup and repair to begin within two hours of the emergency one call. At 18:35, 10 belly dump trucks and 2 backhoes will be on site by 08:00. July 1, 2015, 07:15 block valves had been re-opened, hospah station restarted. Cleanup operations continuing to meet the bureau of indian affairs standards.

All rights reserved. Copyright © by ClearPHMSA