Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2015-06-30 — TX
Operator
Phillips 66 Pipeline Llc
Cause
Other Outside Force Damage
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$12,087
Incident datetime
2015-06-30 13:03
Report number
Location
TX
Narrative
A third party crew performing demolition work impacted the phillips 66 seminoe pipeline with a 6" x 3" I-beam at a location about 1.5 miles north of sinclair, wyoming, resulting in a spill of diesel fuel. Phillips 66 personnel shut down and blocked in the pipeline segment and made the appropriate regulatory notifications.
Detailed record list
Report Received Date
2015-07-29 00:00:00
Iyear
2015
Report Number
20150271
Supplemental Number
20635
Report Type
Original Final
Operator Id
31684
Name
Phillips 66 Pipeline Llc
Operator Street Address
2331 Citywest Blvd
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77042
Local Datetime
2015-06-30 13:15:00
Location Latitude
41.800416
Location Longitude
-107.109865
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
260
Recovered Bbls
260
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime
2015-06-30 13:03:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2015-06-30 13:15:00
Restart Datetime
2015-07-02 15:23:00
On Site Datetime
2015-06-30 13:12:00
Nrc Rpt Datetime
2015-06-30 14:15:00
Nrc Rpt Num
1121455
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Seminoe Pipeline
Segment Name
Sm02
Onshore State Abbreviation
Wy
Onshore Postal Code
82334
Onshore City Name
Not Within A Municipality
Onshore County Name
Carbon
Designated Location
Milepost/valve Station
Designated Name
Mp 332
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under A Building
Depth Of Cover
27
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8.625
Pipe Wall Thickness
0.156
Pipe Smys
52000
Pipe Specification
5l
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
National
Pipe Coating Type
Coal Tar
Installation Year
1960
Manufactured Year
1960
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
6
Puncture Circum
3
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
32760
Est Cost Prop Damage
12087
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Prpty
44847
Accident Psig
132
Mop Psig
570
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
6653
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The third party that hit our line called and reported the incident.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Outside Force Damage
Cause Details
Nearby Industrial, Man-Made, Or Other Fire/explosion As Primary Cause Of Accident
Outside Force Type
Nearby Industrial, Man-Made, Or Other Fire/explosion As Primary Cause Of Incident
Preparer Name
M****** J* D******
Preparer Title
Dot Coordinator
Preparer Email
M****************@p**.com
Preparer Telephone
406.855.6963
Preparer Fax
406.255.5734
Prepared Date
2015-07-29 00:00:00
Authorizer Name
T*** L* T*****
Authorizer Telephone
832.765.1636
Authorizer Title
Manager Of Regulatory Compliance
Authorizer Email
T************@p**.com
Narrative
A third party crew performing demolition work impacted the phillips 66 seminoe pipeline with a 6" x 3" I-beam at a location about 1.5 miles north of sinclair, wyoming, resulting in a spill of diesel fuel. Phillips 66 personnel shut down and blocked in the pipeline segment and made the appropriate regulatory notifications.
| Report Received Date | 2015-07-29 00:00:00 |
|---|---|
| Iyear | 2015 |
| Report Number | 20150271 |
| Supplemental Number | 20635 |
| Report Type | Original Final |
| Operator Id | 31684 PHMSA Enforcement |
| Name | Phillips 66 Pipeline Llc |
| Operator Street Address | 2331 Citywest Blvd |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77042 |
| Local Datetime | 2015-06-30 13:15:00 |
| Location Latitude | 41.800416 Google Maps OpenStreetMap |
| Location Longitude | -107.109865 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Diesel, Fuel Oil, Kerosene, Jet Fuel |
| Unintentional Release Bbls | 260 |
| Recovered Bbls | 260 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations) |
| Incident Identified Datetime | 2015-06-30 13:03:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2015-06-30 13:15:00 |
| Restart Datetime | 2015-07-02 15:23:00 |
| On Site Datetime | 2015-06-30 13:12:00 |
| Nrc Rpt Datetime | 2015-06-30 14:15:00 |
| Nrc Rpt Num | 1121455 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Remotely Controlled |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Seminoe Pipeline |
| Segment Name | Sm02 |
| Onshore State Abbreviation | Wy |
| Onshore Postal Code | 82334 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Carbon |
| Designated Location | Milepost/valve Station |
| Designated Name | Mp 332 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under A Building |
| Depth Of Cover | 27 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 8.625 |
| Pipe Wall Thickness | 0.156 |
| Pipe Smys | 52000 |
| Pipe Specification | 5l |
| Pipe Seam Type | Erw - High Frequency |
| Pipe Manufacturer | National |
| Pipe Coating Type | Coal Tar |
| Installation Year | 1960 |
| Manufactured Year | 1960 |
| Material Involved | Carbon Steel |
| Release Type | Mechanical Puncture |
| Puncture Axial | 6 |
| Puncture Circum | 3 |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 32760 |
| Est Cost Prop Damage | 12087 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 44847 |
| Accident Psig | 132 |
| Mop Psig | 570 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 6653 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | Yes |
| Cpm Conf Ind | Yes |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | The third party that hit our line called and reported the incident. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Other Outside Force Damage |
| Cause Details | Nearby Industrial, Man-Made, Or Other Fire/explosion As Primary Cause Of Accident |
| Outside Force Type | Nearby Industrial, Man-Made, Or Other Fire/explosion As Primary Cause Of Incident |
| Preparer Name | M****** J* D****** |
| Preparer Title | Dot Coordinator |
| Preparer Email | M****************@p**.com |
| Preparer Telephone | 406.855.6963 |
| Preparer Fax | 406.255.5734 |
| Prepared Date | 2015-07-29 00:00:00 |
| Authorizer Name | T*** L* T***** |
| Authorizer Telephone | 832.765.1636 |
| Authorizer Title | Manager Of Regulatory Compliance |
| Authorizer Email | T************@p**.com |
| Narrative | A third party crew performing demolition work impacted the phillips 66 seminoe pipeline with a 6" x 3" I-beam at a location about 1.5 miles north of sinclair, wyoming, resulting in a spill of diesel fuel. Phillips 66 personnel shut down and blocked in the pipeline segment and made the appropriate regulatory notifications. |