HL incident on 2013-08-16 — TX

Operator
Enterprise Products Operating Llc
Cause
Incorrect Operation
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2013-08-16 04:55
Report number
Location
TX
Narrative
In reference to parts a(6), f,and I, this report is being made as part of a comprehensive review and analysis of prior incidents or near misses involving flash fire or ignition of flammable vapors, pursuant to a compliance order issued by PHMSA (cpf no. 4-2014-5017). A flash fire occurred at a recently completed weld when air movers were being relocated. A valve (hv-3) upstream of the weld location was not sealing resulting in leaking hydrocarbons. Air movers were utilized to pull the hydrocarbon vapors away from the welding location. Prior to the start of welding, lel levels were checked initially, documented on the permit and periodically throughout the welding job. These checks indicated a 0% lel reading while the air movers were in operations. When the air movers were shutdown to accommodate moving one of the air movers, hydrocarbon vapors came in contact with hot metal (post welding) at the weld location and ignited. Post incident, continuous gas monitoring performed in the work area indicated a 0% lel readings while the air movers were in operations.
Detailed record list
Report Received Date
2015-07-13 00:00:00
Iyear
2013
Report Number
20150250
Supplemental Number
20584
Report Type
Original Final
Operator Id
Name
Enterprise Products Operating Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2013-08-16 04:55:00
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Y-Grade
Unintentional Release Bbls
0
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2013-08-16 04:55:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
The Station Was Bypassed Due To The Work Being Completed At The Station.
On Site Datetime
2013-08-16 04:55:00
Nrc Rpt Num
Nrc Notification Required But Not Made
Ignite Ind
Yes
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Needville Station
Segment Name
Needville Station
Onshore State Abbreviation
Tx
Onshore Postal Code
77461
Onshore City Name
Needville
Onshore County Name
Fort Bend
Designated Location
Milepost/valve Station
Designated Name
Needville
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Other
Item Involved Details
Tee Fitting
Installation Year
2013
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Hydrocarbon Vapors Came In Contact With The Hot Metal At The Welding Location And Ignited
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
0
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Prpty
0
Accident Psig
0
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Controllers were not involved with the tie-in work.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Incorrect Operation
Cause Details
Other Incorrect Operation
Operation Type
Other Incorrect Operation
Operation Details
Failure To Properly Isolate And/or Control All Sources Of Energy.
Related Other Ind
Yes
Operation Related Details
Failure To Properly Isolate And/or Control All Sources Of Energy.
Category Type
Construction
Operator Qualification Ind
Yes
Qualified Individuals
Yes, They Were Qualified For The Task(S)
Preparer Name
N*** T*****
Preparer Title
Senior Compliance Engineer
Preparer Email
N*******@e****.com
Preparer Telephone
7133812493
Prepared Date
2015-07-13 00:00:00
Authorizer Name
N*** T*****
Authorizer Telephone
7133812493
Authorizer Title
Senior Compliance Engineer
Authorizer Email
N*******@e****.com
Narrative
In reference to parts a(6), f,and I, this report is being made as part of a comprehensive review and analysis of prior incidents or near misses involving flash fire or ignition of flammable vapors, pursuant to a compliance order issued by PHMSA (cpf no. 4-2014-5017). A flash fire occurred at a recently completed weld when air movers were being relocated. A valve (hv-3) upstream of the weld location was not sealing resulting in leaking hydrocarbons. Air movers were utilized to pull the hydrocarbon vapors away from the welding location. Prior to the start of welding, lel levels were checked initially, documented on the permit and periodically throughout the welding job. These checks indicated a 0% lel reading while the air movers were in operations. When the air movers were shutdown to accommodate moving one of the air movers, hydrocarbon vapors came in contact with hot metal (post welding) at the weld location and ignited. Post incident, continuous gas monitoring performed in the work area indicated a 0% lel readings while the air movers were in operations.
Report Received Date 2015-07-13 00:00:00
Iyear 2013
Report Number 20150250
Supplemental Number 20584
Report Type Original Final
Operator Id 31618 PHMSA Enforcement
Name Enterprise Products Operating Llc
Operator Street Address 1100 Louisiana Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2013-08-16 04:55:00
Location Latitude 29.358902 Google Maps OpenStreetMap
Location Longitude -95.85094 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Other Hvl
Commodity Details Y-Grade
Unintentional Release Bbls 0
Intentional Release Bbls 0
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2013-08-16 04:55:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain The Station Was Bypassed Due To The Work Being Completed At The Station.
On Site Datetime 2013-08-16 04:55:00
Nrc Rpt Num Nrc Notification Required But Not Made NRC Report How to search
Ignite Ind Yes
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Needville Station
Segment Name Needville Station
Onshore State Abbreviation Tx
Onshore Postal Code 77461
Onshore City Name Needville
Onshore County Name Fort Bend
Designated Location Milepost/valve Station
Designated Name Needville
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Intrastate
Item Involved Other
Item Involved Details Tee Fitting
Installation Year 2013
Material Involved Carbon Steel
Release Type Other
Release Type Details Hydrocarbon Vapors Came In Contact With The Hot Metal At The Welding Location And Ignited
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 0
Est Cost Prop Damage 0
Est Cost Emergency 0
Est Cost Environmental 0
Est Cost Other 0
Prpty 0
Accident Psig 0
Mop Psig 1440
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Controllers were not involved with the tie-in work.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Incorrect Operation
Cause Details Other Incorrect Operation
Operation Type Other Incorrect Operation
Operation Details Failure To Properly Isolate And/or Control All Sources Of Energy.
Related Other Ind Yes
Operation Related Details Failure To Properly Isolate And/or Control All Sources Of Energy.
Category Type Construction
Operator Qualification Ind Yes
Qualified Individuals Yes, They Were Qualified For The Task(S)
Preparer Name N*** T*****
Preparer Title Senior Compliance Engineer
Preparer Email N*******@e****.com
Preparer Telephone 7133812493
Prepared Date 2015-07-13 00:00:00
Authorizer Name N*** T*****
Authorizer Telephone 7133812493
Authorizer Title Senior Compliance Engineer
Authorizer Email N*******@e****.com
Narrative In reference to parts a(6), f,and I, this report is being made as part of a comprehensive review and analysis of prior incidents or near misses involving flash fire or ignition of flammable vapors, pursuant to a compliance order issued by PHMSA (cpf no. 4-2014-5017). A flash fire occurred at a recently completed weld when air movers were being relocated. A valve (hv-3) upstream of the weld location was not sealing resulting in leaking hydrocarbons. Air movers were utilized to pull the hydrocarbon vapors away from the welding location. Prior to the start of welding, lel levels were checked initially, documented on the permit and periodically throughout the welding job. These checks indicated a 0% lel reading while the air movers were in operations. When the air movers were shutdown to accommodate moving one of the air movers, hydrocarbon vapors came in contact with hot metal (post welding) at the weld location and ignited. Post incident, continuous gas monitoring performed in the work area indicated a 0% lel readings while the air movers were in operations.

All rights reserved. Copyright © by ClearPHMSA