HL incident on 2015-06-16 — OK

Operator
Oneok Ngl Pipeline, Llc
Cause
Excavation Issue
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$110,000
Incident datetime
2015-06-16 17:00
Report number
Location
OK
Narrative
On tuesday, june 16, 2015, at 5:00 pm oneok employee was notified the oneok north snyder to snyder station - scurry 6" pipeline had been struck by a third party contractor causing a release. The morning of june 16th, a oneok representative had been on site and located the pipeline, (texas811 one-call number 1565965251), and the pipe had been exposed via hydro excavation. At that time the oneok employee advised the third-party contractor that no additional excavation was to occur on the oneok easement unless oneok personnel were on site. Later in the day, without notifying oneok, the contractor began to excavate the oneok pipeline and struck the line upon striking the pipeline and causing the release the contractor notified the oneok field representative, who immediately notified the oneok pipeline control center. The pipeline control center activated emergency shutdown devices (esd) on the inlet meters supplying the 6" pipeline isolating the line. The immediate response in isolating the pipeline, pre-empted leak detection alarm confirmation. Scurry county sherriff and fire department personnel were notified and arrived on site prior to oneok personnel, at which time they closed local roads (cr 1611) and evacuated two nearby homes, controlling access to the release site until oneok personnel arrived on site. The line was repaired and returned to service june 20, 2015 at 2:00 am.
Detailed record list
Report Received Date
2015-07-08 00:00:00
Iyear
2015
Report Number
20150246
Supplemental Number
20577
Report Type
Supplemental Final
Operator Id
Name
Oneok Ngl Pipeline, Llc
Operator Street Address
100 West Fifth Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2015-06-16 17:00:00
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls
1609
Intentional Release Bbls
85
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Third Party That Caused The Accident
Incident Identified Datetime
2015-06-16 17:00:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2015-06-16 17:05:00
Restart Datetime
2015-06-20 02:00:00
On Site Datetime
2015-06-16 17:45:00
Nrc Rpt Datetime
2015-06-16 18:20:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Check Valve
Num Pub Evacuated
7
Pipe Fac Name
North Snyder To Snyder Station Scurry 6"
Segment Name
20474
Onshore State Abbreviation
Tx
Onshore Postal Code
79549
Onshore City Name
Not Within A Municipality
Onshore County Name
Scurry
Designated Location
Milepost/valve Station
Designated Name
4.71
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
42
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
6.625
Pipe Wall Thickness
0.109
Pipe Smys
52000
Pipe Specification
Api 5l
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Lonestar
Pipe Coating Type
Cold Applied Tape
Installation Year
1971
Manufactured Year
1971
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
1.5
Puncture Circum
0.5
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
1500
Est Cost Gas Released
33677
Est Cost Prop Damage
110000
Est Cost Emergency
2500
Est Cost Environmental
0
Est Cost Other
2000
Est Cost Other Details
Meals And Lodging For Displaced Residents
Prpty
149677
Accident Psig
479
Mop Psig
1220
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
39706
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Third party excavation damage. No controller actions were involved.
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
1
Num Employees Failed
0
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
Excavator Ind
Yes
Contractor Ind
Yes
Notify Cga Dirt
Yes
Pipeline Easement Row Ind
Yes
Excavator Type
Contractor
Excavator Equipment
Backhoe/trackhoe
Work Performed
Liquid Pipeline
One Call Notified Ind
Yes
One Call Ticket Num
1565965251
One Call Center Name
Texas811
Locator Type
Utility Owner
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
81
Root Cause Category
Excavation Issue
Root Cause Type
Excavator Failed To Maintain Clearance After Verifying Marks
Collected Data Ind
Yes
Geometry Deformation Ind
Yes
Geometry Recent Year
2013
Insp Compl Before Damage Ind
Yes
Has Hydrtst Conduc Before Ind
No
Preparer Name
N*** J****
Preparer Title
Regulatory Compliance Coordinator
Preparer Email
N*********@o****.com
Preparer Telephone
580-395-6304
Preparer Fax
580-395-2933
Prepared Date
2015-07-10 00:00:00
Authorizer Name
N*** J****
Authorizer Telephone
580-395-6304
Authorizer Title
Regulatory Compliance Coordinator
Authorizer Email
N*********@o****.com
Narrative
On tuesday, june 16, 2015, at 5:00 pm oneok employee was notified the oneok north snyder to snyder station - scurry 6" pipeline had been struck by a third party contractor causing a release. The morning of june 16th, a oneok representative had been on site and located the pipeline, (texas811 one-call number 1565965251), and the pipe had been exposed via hydro excavation. At that time the oneok employee advised the third-party contractor that no additional excavation was to occur on the oneok easement unless oneok personnel were on site. Later in the day, without notifying oneok, the contractor began to excavate the oneok pipeline and struck the line upon striking the pipeline and causing the release the contractor notified the oneok field representative, who immediately notified the oneok pipeline control center. The pipeline control center activated emergency shutdown devices (esd) on the inlet meters supplying the 6" pipeline isolating the line. The immediate response in isolating the pipeline, pre-empted leak detection alarm confirmation. Scurry county sherriff and fire department personnel were notified and arrived on site prior to oneok personnel, at which time they closed local roads (cr 1611) and evacuated two nearby homes, controlling access to the release site until oneok personnel arrived on site. The line was repaired and returned to service june 20, 2015 at 2:00 am.
Report Received Date 2015-07-08 00:00:00
Iyear 2015
Report Number 20150246
Supplemental Number 20577
Report Type Supplemental Final
Operator Id 32109 PHMSA Enforcement
Name Oneok Ngl Pipeline, Llc
Operator Street Address 100 West Fifth Street
Operator City Name Tulsa
Operator State Abbreviation OK
Operator Postal Code 74103
Local Datetime 2015-06-16 17:00:00
Location Latitude 32.81384 Google Maps OpenStreetMap
Location Longitude -100.93662 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls 1609
Intentional Release Bbls 85
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Notification From Third Party That Caused The Accident
Incident Identified Datetime 2015-06-16 17:00:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2015-06-16 17:05:00
Restart Datetime 2015-06-20 02:00:00
On Site Datetime 2015-06-16 17:45:00
Nrc Rpt Datetime 2015-06-16 18:20:00
Nrc Rpt Num 1120006 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Remotely Controlled
Downstream Valve Type Ind Check Valve
Num Pub Evacuated 7
Pipe Fac Name North Snyder To Snyder Station Scurry 6"
Segment Name 20474
Onshore State Abbreviation Tx
Onshore Postal Code 79549
Onshore City Name Not Within A Municipality
Onshore County Name Scurry
Designated Location Milepost/valve Station
Designated Name 4.71
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 42
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 6.625
Pipe Wall Thickness 0.109
Pipe Smys 52000
Pipe Specification Api 5l
Pipe Seam Type Erw - High Frequency
Pipe Manufacturer Lonestar
Pipe Coating Type Cold Applied Tape
Installation Year 1971
Manufactured Year 1971
Material Involved Carbon Steel
Release Type Mechanical Puncture
Puncture Axial 1.5
Puncture Circum 0.5
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 1500
Est Cost Gas Released 33677
Est Cost Prop Damage 110000
Est Cost Emergency 2500
Est Cost Environmental 0
Est Cost Other 2000
Est Cost Other Details Meals And Lodging For Displaced Residents
Prpty 149677
Accident Psig 479
Mop Psig 1220
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 39706
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind Yes
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Third party excavation damage. No controller actions were involved.
Employee Drug Test Ind Yes
Contractor Drug Test Ind No
Num Employees Tested 1
Num Employees Failed 0
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind Yes
One Call System Ind Yes
Excavator Ind Yes
Contractor Ind Yes
Notify Cga Dirt Yes
Pipeline Easement Row Ind Yes
Excavator Type Contractor
Excavator Equipment Backhoe/trackhoe
Work Performed Liquid Pipeline
One Call Notified Ind Yes
One Call Ticket Num 1565965251
One Call Center Name Texas811
Locator Type Utility Owner
Visible Marks Yes
Service Interruption Yes
Service Interruption Hours 81
Root Cause Category Excavation Issue
Root Cause Type Excavator Failed To Maintain Clearance After Verifying Marks
Collected Data Ind Yes
Geometry Deformation Ind Yes
Geometry Recent Year 2013
Insp Compl Before Damage Ind Yes
Has Hydrtst Conduc Before Ind No
Preparer Name N*** J****
Preparer Title Regulatory Compliance Coordinator
Preparer Email N*********@o****.com
Preparer Telephone 580-395-6304
Preparer Fax 580-395-2933
Prepared Date 2015-07-10 00:00:00
Authorizer Name N*** J****
Authorizer Telephone 580-395-6304
Authorizer Title Regulatory Compliance Coordinator
Authorizer Email N*********@o****.com
Narrative On tuesday, june 16, 2015, at 5:00 pm oneok employee was notified the oneok north snyder to snyder station - scurry 6" pipeline had been struck by a third party contractor causing a release. The morning of june 16th, a oneok representative had been on site and located the pipeline, (texas811 one-call number 1565965251), and the pipe had been exposed via hydro excavation. At that time the oneok employee advised the third-party contractor that no additional excavation was to occur on the oneok easement unless oneok personnel were on site. Later in the day, without notifying oneok, the contractor began to excavate the oneok pipeline and struck the line upon striking the pipeline and causing the release the contractor notified the oneok field representative, who immediately notified the oneok pipeline control center. The pipeline control center activated emergency shutdown devices (esd) on the inlet meters supplying the 6" pipeline isolating the line. The immediate response in isolating the pipeline, pre-empted leak detection alarm confirmation. Scurry county sherriff and fire department personnel were notified and arrived on site prior to oneok personnel, at which time they closed local roads (cr 1611) and evacuated two nearby homes, controlling access to the release site until oneok personnel arrived on site. The line was repaired and returned to service june 20, 2015 at 2:00 am.

All rights reserved. Copyright © by ClearPHMSA