HL incident on 2015-06-05 — TX

Operator
Kinder Morgan Wink Pipeline Lp
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$10,000
Incident datetime
2015-06-05 23:15
Report number
Location
TX
Narrative
On june 5, 2015, the inboard seal failed on pump p-200 at guadalupe pump station. As a result, 1.5 barrels of crude oil were released. The crude oil was contained within the pump building. The bearings and seals on the pump were replaced.
Detailed record list
Report Received Date
2015-07-03 00:00:00
Iyear
2015
Report Number
20150243
Supplemental Number
20567
Report Type
Original
Operator Id
Name
Kinder Morgan Wink Pipeline Lp
Operator Street Address
1001 Louisiana St, Suite 1000
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2015-06-05 23:37:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
1.5
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2015-06-05 23:15:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2015-06-05 23:15:00
Restart Datetime
2015-06-08 20:18:00
On Site Datetime
2015-06-05 22:40:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Guadalupe Pump Station
Segment Name
20" Wink To Guadalupe
Onshore State Abbreviation
Tx
Onshore Postal Code
79847
Onshore City Name
Pine Springs
Onshore County Name
Culberson
Designated Location
Milepost/valve Station
Designated Name
Mp 113
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Inside A Building
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pump
Installation Year
1955
Material Involved
Material Other Than Carbon Steel
Material Details
Inboard Seal
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
83
Est Cost Prop Damage
10000
Est Cost Emergency
1000
Est Cost Environmental
0
Est Cost Other
0
Prpty
11083
Accident Psig
509
Mop Psig
650
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The controller responded to the alarm appropriately.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Pump Or Pump-Related Equipment
Eq Failure Type
Pump Or Pump-Related Equipment
Other Pump Ind
Seal/packing Failure
Eq Additional Other Ind
Yes
Eq Additional Other Details
Bearing Failure Caused By Lack Of Lubrication
Preparer Name
A**** Z*****
Preparer Title
Manager-Regulatory Compliance
Preparer Email
A***********@k***********.com
Preparer Telephone
713-369-9512
Preparer Fax
303-984-3417
Prepared Date
2015-07-02 00:00:00
Authorizer Name
S**** M*****
Authorizer Telephone
713-369-8065
Authorizer Title
Director-Operations And Engineering
Authorizer Email
S***********@k***********.com
Narrative
On june 5, 2015, the inboard seal failed on pump p-200 at guadalupe pump station. As a result, 1.5 barrels of crude oil were released. The crude oil was contained within the pump building. The bearings and seals on the pump were replaced.
Report Received Date 2015-07-03 00:00:00
Iyear 2015
Report Number 20150243
Supplemental Number 20567
Report Type Original
Operator Id 31957 PHMSA Enforcement
Name Kinder Morgan Wink Pipeline Lp
Operator Street Address 1001 Louisiana St, Suite 1000
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2015-06-05 23:37:00
Location Latitude 31.8526 Google Maps OpenStreetMap
Location Longitude -104.5573 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 1.5
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2015-06-05 23:15:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2015-06-05 23:15:00
Restart Datetime 2015-06-08 20:18:00
On Site Datetime 2015-06-05 22:40:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Guadalupe Pump Station
Segment Name 20" Wink To Guadalupe
Onshore State Abbreviation Tx
Onshore Postal Code 79847
Onshore City Name Pine Springs
Onshore County Name Culberson
Designated Location Milepost/valve Station
Designated Name Mp 113
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Inside A Building
Crossing No
Pipe Facility Type Interstate
Item Involved Pump
Installation Year 1955
Material Involved Material Other Than Carbon Steel
Material Details Inboard Seal
Release Type Leak
Leak Type Seal Or Packing
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 83
Est Cost Prop Damage 10000
Est Cost Emergency 1000
Est Cost Environmental 0
Est Cost Other 0
Prpty 11083
Accident Psig 509
Mop Psig 650
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The controller responded to the alarm appropriately.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Pump Or Pump-Related Equipment
Eq Failure Type Pump Or Pump-Related Equipment
Other Pump Ind Seal/packing Failure
Eq Additional Other Ind Yes
Eq Additional Other Details Bearing Failure Caused By Lack Of Lubrication
Preparer Name A**** Z*****
Preparer Title Manager-Regulatory Compliance
Preparer Email A***********@k***********.com
Preparer Telephone 713-369-9512
Preparer Fax 303-984-3417
Prepared Date 2015-07-02 00:00:00
Authorizer Name S**** M*****
Authorizer Telephone 713-369-8065
Authorizer Title Director-Operations And Engineering
Authorizer Email S***********@k***********.com
Narrative On june 5, 2015, the inboard seal failed on pump p-200 at guadalupe pump station. As a result, 1.5 barrels of crude oil were released. The crude oil was contained within the pump building. The bearings and seals on the pump were replaced.

All rights reserved. Copyright © by ClearPHMSA