HL incident on 2015-05-11 — TX
Operator
Enterprise Products Operating Llc
Cause
Material Failure Of Pipe Or Weld
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$86,000
Incident datetime
2015-05-11 10:30
Report number
Location
TX
Narrative
On 5/11/2015, a leak was discovered on lid 333-2 at 10:30 hrs while pipeline rehab crew was working on anomalies by removing coating and sandblasting. It was determined that the repair would exceed $50,000 at 14:30 hrs. Therefore the nrc call was made at 15:09 hrs. Line was isolated, purged with nitrogen, repaired with a replacement of 40ft of new pipe. Pipe was sent for metallurgical analysis. Update 8/13/2015 - it was determined by the metallurgical analysis that the leak was caused by through-wall selective seam-weld corrosion. An engineering analysis will be performed to determine if there are any other anomalies of this kind.
Detailed record list
Report Received Date
2015-06-05 00:00:00
Iyear
2015
Report Number
20150210
Supplemental Number
20667
Report Type
Supplemental Final
Operator Id
31618
Name
Enterprise Products Operating Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2015-05-11 10:30:00
Location Latitude
27.80113016
Location Longitude
-97.45456557
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls
0.1
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2015-05-11 10:30:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Pipeline Was Not Flowing Product (Idle) At The Time Of The Discovery Of The Leak
On Site Datetime
2015-05-11 10:30:00
Nrc Rpt Datetime
2015-05-11 15:09:00
Nrc Rpt Num
1116185
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Clarkwood Lateral
Segment Name
Lid 333-2
Onshore State Abbreviation
Tx
Onshore Postal Code
78408
Onshore City Name
Corpus Christi
Onshore County Name
Nueces
Designated Location
Milepost/valve Station
Designated Name
6.65 Miles
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
60
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
6.625
Pipe Wall Thickness
0.188
Pipe Smys
46000
Pipe Specification
Api-5l
Pipe Seam Type
Seamless
Pipe Manufacturer
Unknown
Pipe Coating Type
Coal Tar
Installation Year
1966
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
Through Wall Sswc
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
86000
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Prpty
86000
Accident Psig
283
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
39938
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Pipeline was shutdown (idle) at the time of the discovery of the leak. Controllers was not involve on this idle section of pipe.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Metallurgical Ind
Yes
Failure Type
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Other Factor
Yes
Other Factor Details
Pressure Cycling
Pwf Additional Other Ind
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Axial Recent Year
2014
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
N*** B******
Preparer Title
Sr. Pipeline Compliance Specialist
Preparer Email
W********@e****.com
Preparer Telephone
713-381-3536
Prepared Date
2015-08-14 00:00:00
Authorizer Name
N*** B******
Authorizer Telephone
713-381-3536
Authorizer Title
Sr. Pipeline Compliance Specialist
Authorizer Email
W********@e****.com
Narrative
On 5/11/2015, a leak was discovered on lid 333-2 at 10:30 hrs while pipeline rehab crew was working on anomalies by removing coating and sandblasting. It was determined that the repair would exceed $50,000 at 14:30 hrs. Therefore the nrc call was made at 15:09 hrs. Line was isolated, purged with nitrogen, repaired with a replacement of 40ft of new pipe. Pipe was sent for metallurgical analysis. Update 8/13/2015 - it was determined by the metallurgical analysis that the leak was caused by through-wall selective seam-weld corrosion. An engineering analysis will be performed to determine if there are any other anomalies of this kind.
| Report Received Date | 2015-06-05 00:00:00 |
|---|---|
| Iyear | 2015 |
| Report Number | 20150210 |
| Supplemental Number | 20667 |
| Report Type | Supplemental Final |
| Operator Id | 31618 PHMSA Enforcement |
| Name | Enterprise Products Operating Llc |
| Operator Street Address | 1100 Louisiana Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2015-05-11 10:30:00 |
| Location Latitude | 27.80113016 Google Maps OpenStreetMap |
| Location Longitude | -97.45456557 Google Maps OpenStreetMap |
| Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
| Commodity Subtype | Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid) |
| Unintentional Release Bbls | 0.1 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Contractor Working For The Operator |
| Incident Identified Datetime | 2015-05-11 10:30:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Pipeline Was Not Flowing Product (Idle) At The Time Of The Discovery Of The Leak |
| On Site Datetime | 2015-05-11 10:30:00 |
| Nrc Rpt Datetime | 2015-05-11 15:09:00 |
| Nrc Rpt Num | 1116185 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Clarkwood Lateral |
| Segment Name | Lid 333-2 |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 78408 |
| Onshore City Name | Corpus Christi |
| Onshore County Name | Nueces |
| Designated Location | Milepost/valve Station |
| Designated Name | 6.65 Miles |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Exposed Due To Excavation |
| Depth Of Cover | 60 |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 6.625 |
| Pipe Wall Thickness | 0.188 |
| Pipe Smys | 46000 |
| Pipe Specification | Api-5l |
| Pipe Seam Type | Seamless |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | Coal Tar |
| Installation Year | 1966 |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Other |
| Leak Type Other | Through Wall Sswc |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 0 |
| Est Cost Prop Damage | 86000 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 86000 |
| Accident Psig | 283 |
| Mop Psig | 1440 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 39938 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Pipeline was shutdown (idle) at the time of the discovery of the leak. Controllers was not involve on this idle section of pipe. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Material Failure Of Pipe Or Weld |
| Cause Details | Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field) |
| Metallurgical Ind | Yes |
| Failure Type | Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field) |
| Other Factor | Yes |
| Other Factor Details | Pressure Cycling |
| Pwf Additional Other Ind | Yes |
| Collected Data Ind | Yes |
| Axial Magnetic Flx Lkg Ind | Yes |
| Axial Recent Year | 2014 |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | N*** B****** |
| Preparer Title | Sr. Pipeline Compliance Specialist |
| Preparer Email | W********@e****.com |
| Preparer Telephone | 713-381-3536 |
| Prepared Date | 2015-08-14 00:00:00 |
| Authorizer Name | N*** B****** |
| Authorizer Telephone | 713-381-3536 |
| Authorizer Title | Sr. Pipeline Compliance Specialist |
| Authorizer Email | W********@e****.com |
| Narrative | On 5/11/2015, a leak was discovered on lid 333-2 at 10:30 hrs while pipeline rehab crew was working on anomalies by removing coating and sandblasting. It was determined that the repair would exceed $50,000 at 14:30 hrs. Therefore the nrc call was made at 15:09 hrs. Line was isolated, purged with nitrogen, repaired with a replacement of 40ft of new pipe. Pipe was sent for metallurgical analysis. Update 8/13/2015 - it was determined by the metallurgical analysis that the leak was caused by through-wall selective seam-weld corrosion. An engineering analysis will be performed to determine if there are any other anomalies of this kind. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA