Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2015-05-23 — TX
Operator
Sfpp, Lp
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$500
Incident datetime
2015-05-23 05:41
Report number
Location
TX
Narrative
On saturday, 5/23, a diesel release occurred at the rocklin station from a cooling line at mainline unit 8 pump on the rocklin to reno system. The release consisted of a spray of approximately 15' by 30' by 1" deep to gravel. Nrc and internal notifications were made. 35 gallons of diesel were released and promptly cleaned up and disposed. Subsequent investigation found the tubing was improperly installed in january 2014.
Detailed record list
Report Received Date
2015-05-29 00:00:00
Iyear
2015
Report Number
20150197
Supplemental Number
20477
Report Type
Original Final
Operator Id
18092
Name
Sfpp, Lp
Operator Street Address
1001 Louisiana St., Suite 1000
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2015-05-23 05:41:00
Location Latitude
38.780153
Location Longitude
-121.246941
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
0.83
Recovered Bbls
0.83
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2015-05-23 05:41:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2015-05-23 05:42:00
Restart Datetime
2015-05-23 11:53:00
On Site Datetime
2015-05-23 05:41:00
Nrc Rpt Datetime
2015-05-23 06:07:00
Nrc Rpt Num
1117334
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Rocklin Station
Segment Name
Rocklin To Reno System
Onshore State Abbreviation
Ca
Onshore Postal Code
95677
Onshore City Name
Rocklin
Onshore County Name
Placer
Designated Location
Milepost/valve Station
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Other
Incident Area Details
Pumping Unit Cooling Line
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Tubing
Installation Year
2014
Material Involved
Material Other Than Carbon Steel
Material Details
Stainless Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
78
Est Cost Prop Damage
500
Est Cost Emergency
5000
Est Cost Environmental
0
Est Cost Other
0
Prpty
5578
Accident Psig
1330
Mop Psig
2900
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Defective Or Loose Tubing Or Fitting
Eq Failure Type
Defective Or Loose Tubing Or Fitting
Additional Installation Ind
Yes
Preparer Name
S**** M*******
Preparer Title
Mgr Ccs
Preparer Email
S*************@k***********.com
Preparer Telephone
909-873-5146
Preparer Fax
303-984-3620
Prepared Date
2015-05-29 00:00:00
Authorizer Name
E***** A* F***
Authorizer Telephone
713-369-9454
Authorizer Title
Dir Ccs
Authorizer Email
B********@k***********.com
Narrative
On saturday, 5/23, a diesel release occurred at the rocklin station from a cooling line at mainline unit 8 pump on the rocklin to reno system. The release consisted of a spray of approximately 15' by 30' by 1" deep to gravel. Nrc and internal notifications were made. 35 gallons of diesel were released and promptly cleaned up and disposed. Subsequent investigation found the tubing was improperly installed in january 2014.
| Report Received Date | 2015-05-29 00:00:00 |
|---|---|
| Iyear | 2015 |
| Report Number | 20150197 |
| Supplemental Number | 20477 |
| Report Type | Original Final |
| Operator Id | 18092 PHMSA Enforcement |
| Name | Sfpp, Lp |
| Operator Street Address | 1001 Louisiana St., Suite 1000 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2015-05-23 05:41:00 |
| Location Latitude | 38.780153 Google Maps OpenStreetMap |
| Location Longitude | -121.246941 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Diesel, Fuel Oil, Kerosene, Jet Fuel |
| Unintentional Release Bbls | 0.83 |
| Recovered Bbls | 0.83 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2015-05-23 05:41:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2015-05-23 05:42:00 |
| Restart Datetime | 2015-05-23 11:53:00 |
| On Site Datetime | 2015-05-23 05:41:00 |
| Nrc Rpt Datetime | 2015-05-23 06:07:00 |
| Nrc Rpt Num | 1117334 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Rocklin Station |
| Segment Name | Rocklin To Reno System |
| Onshore State Abbreviation | Ca |
| Onshore Postal Code | 95677 |
| Onshore City Name | Rocklin |
| Onshore County Name | Placer |
| Designated Location | Milepost/valve Station |
| Designated Name | 0 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Other |
| Incident Area Details | Pumping Unit Cooling Line |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Tubing |
| Installation Year | 2014 |
| Material Involved | Material Other Than Carbon Steel |
| Material Details | Stainless Steel |
| Release Type | Leak |
| Leak Type | Connection Failure |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 78 |
| Est Cost Prop Damage | 500 |
| Est Cost Emergency | 5000 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 5578 |
| Accident Psig | 1330 |
| Mop Psig | 2900 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Defective Or Loose Tubing Or Fitting |
| Eq Failure Type | Defective Or Loose Tubing Or Fitting |
| Additional Installation Ind | Yes |
| Preparer Name | S**** M******* |
| Preparer Title | Mgr Ccs |
| Preparer Email | S*************@k***********.com |
| Preparer Telephone | 909-873-5146 |
| Preparer Fax | 303-984-3620 |
| Prepared Date | 2015-05-29 00:00:00 |
| Authorizer Name | E***** A* F*** |
| Authorizer Telephone | 713-369-9454 |
| Authorizer Title | Dir Ccs |
| Authorizer Email | B********@k***********.com |
| Narrative | On saturday, 5/23, a diesel release occurred at the rocklin station from a cooling line at mainline unit 8 pump on the rocklin to reno system. The release consisted of a spray of approximately 15' by 30' by 1" deep to gravel. Nrc and internal notifications were made. 35 gallons of diesel were released and promptly cleaned up and disposed. Subsequent investigation found the tubing was improperly installed in january 2014. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA