HL incident on 2015-04-27 — OH

Operator
Marathon Pipe Line Llc
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$45,000
Incident datetime
2015-04-27 13:55
Report number
Location
OH
Narrative
An mpl contractor was working on the new manifold when he smelled hydrocarbons and informed mpl personnel at 13:55 on 4/27/15. The line was immediately shutdown. The area was extensively evaluated including writing an excavation plan, making one-calls, and mobilizing contractors. Upon excavation of the area there was no active leak detected and a pressure test was performed. A small leak was discovered on the flange connection at 01:30 on 4/28/15.The gasket was replaced. Approximately 60 yards of contaminated soil was excavated from the area surrounding the flange. The initial 7000-1 reported the local date and time of the accident as 4/28/2015 at 01:30, since this is the time mpl verified this was an active release. Based on the fact that an active release was discovered following excavation and a pressure test, mpl has changed the local date and time of the accident to 4/27/15 at 13:55 (part a, question 4), the time when hydrocarbon odor was reported.
Detailed record list
Report Received Date
2015-05-14 00:00:00
Iyear
2015
Report Number
20150176
Supplemental Number
21050
Report Type
Supplemental Final
Operator Id
Name
Marathon Pipe Line Llc
Operator Street Address
539 South Main Street
Operator City Name
Findlay
Operator State Abbreviation
OH
Operator Postal Code
45840
Local Datetime
2015-04-27 13:55:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
4
Recovered Bbls
4
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2015-04-27 13:55:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2015-04-27 14:10:00
Restart Datetime
2015-04-28 16:03:00
On Site Datetime
2015-04-27 13:55:00
Nrc Rpt Datetime
2015-04-28 02:00:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Patoka Station
Segment Name
Patoka-Martinsville 20"
Onshore State Abbreviation
Il
Onshore Postal Code
62892
Onshore City Name
Vernon
Onshore County Name
Marion
Designated Location
Milepost/valve Station
Designated Name
0.17
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
60
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Flange Assembly
Installation Year
Unknown
Material Involved
Material Other Than Carbon Steel
Material Details
Corregated Gasket
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
230
Est Cost Prop Damage
45000
Est Cost Emergency
60000
Est Cost Environmental
0
Est Cost Other
0
Prpty
105230
Accident Psig
1139
Mop Psig
1142
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Scada and cpm would not have detected the leak due to the small volume released.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
Gasket
Ief Addl Misalignment Ind
Yes
Eq Additional Other Ind
Yes
Eq Additional Other Details
Misalignment Due To Recent Excavation Backfilling Activity
Preparer Name
D******* S***
Preparer Title
Hes Professional
Preparer Email
D*****@m****************.com
Preparer Telephone
419-421-2121
Prepared Date
2016-01-15 00:00:00
Authorizer Name
R****** W* B*****
Authorizer Telephone
419-421-2121
Authorizer Title
Regulatory Compliance Supervisor
Authorizer Email
R*******@m****************.com
Narrative
An mpl contractor was working on the new manifold when he smelled hydrocarbons and informed mpl personnel at 13:55 on 4/27/15. The line was immediately shutdown. The area was extensively evaluated including writing an excavation plan, making one-calls, and mobilizing contractors. Upon excavation of the area there was no active leak detected and a pressure test was performed. A small leak was discovered on the flange connection at 01:30 on 4/28/15.The gasket was replaced. Approximately 60 yards of contaminated soil was excavated from the area surrounding the flange. The initial 7000-1 reported the local date and time of the accident as 4/28/2015 at 01:30, since this is the time mpl verified this was an active release. Based on the fact that an active release was discovered following excavation and a pressure test, mpl has changed the local date and time of the accident to 4/27/15 at 13:55 (part a, question 4), the time when hydrocarbon odor was reported.
Report Received Date 2015-05-14 00:00:00
Iyear 2015
Report Number 20150176
Supplemental Number 21050
Report Type Supplemental Final
Operator Id 32147 PHMSA Enforcement
Name Marathon Pipe Line Llc
Operator Street Address 539 South Main Street
Operator City Name Findlay
Operator State Abbreviation OH
Operator Postal Code 45840
Local Datetime 2015-04-27 13:55:00
Location Latitude 38.793803 Google Maps OpenStreetMap
Location Longitude -89.082089 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 4
Recovered Bbls 4
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Contractor Working For The Operator
Incident Identified Datetime 2015-04-27 13:55:00
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2015-04-27 14:10:00
Restart Datetime 2015-04-28 16:03:00
On Site Datetime 2015-04-27 13:55:00
Nrc Rpt Datetime 2015-04-28 02:00:00
Nrc Rpt Num 1114871 NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Patoka Station
Segment Name Patoka-Martinsville 20"
Onshore State Abbreviation Il
Onshore Postal Code 62892
Onshore City Name Vernon
Onshore County Name Marion
Designated Location Milepost/valve Station
Designated Name 0.17
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 60
Crossing No
Pipe Facility Type Interstate
Item Involved Flange Assembly
Installation Year Unknown
Material Involved Material Other Than Carbon Steel
Material Details Corregated Gasket
Release Type Leak
Leak Type Connection Failure
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
Usa Drinking Ind Yes
Usa Drinking Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 230
Est Cost Prop Damage 45000
Est Cost Emergency 60000
Est Cost Environmental 0
Est Cost Other 0
Prpty 105230
Accident Psig 1139
Mop Psig 1142
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Scada and cpm would not have detected the leak due to the small volume released.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Non-Threaded Connection Failure
Eq Failure Type Non-Threaded Connection Failure
Other Non Threaded Ind Gasket
Ief Addl Misalignment Ind Yes
Eq Additional Other Ind Yes
Eq Additional Other Details Misalignment Due To Recent Excavation Backfilling Activity
Preparer Name D******* S***
Preparer Title Hes Professional
Preparer Email D*****@m****************.com
Preparer Telephone 419-421-2121
Prepared Date 2016-01-15 00:00:00
Authorizer Name R****** W* B*****
Authorizer Telephone 419-421-2121
Authorizer Title Regulatory Compliance Supervisor
Authorizer Email R*******@m****************.com
Narrative An mpl contractor was working on the new manifold when he smelled hydrocarbons and informed mpl personnel at 13:55 on 4/27/15. The line was immediately shutdown. The area was extensively evaluated including writing an excavation plan, making one-calls, and mobilizing contractors. Upon excavation of the area there was no active leak detected and a pressure test was performed. A small leak was discovered on the flange connection at 01:30 on 4/28/15.The gasket was replaced. Approximately 60 yards of contaminated soil was excavated from the area surrounding the flange. The initial 7000-1 reported the local date and time of the accident as 4/28/2015 at 01:30, since this is the time mpl verified this was an active release. Based on the fact that an active release was discovered following excavation and a pressure test, mpl has changed the local date and time of the accident to 4/27/15 at 13:55 (part a, question 4), the time when hydrocarbon odor was reported.