HL incident on 2015-04-08 — TX

Operator
Enterprise Products Operating Llc
Cause
Corrosion Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$80,000
Incident datetime
2015-04-08 13:00
Report number
Location
TX
Narrative
On 4/8/2015 at 13:00 an enterprise employee noticed an iceball on the ground at the location of a 2" riser at enterprise's mont belvieu facility. The pipeline corridor has several lines, some of which are plant piping. The line was shut down on 4/8/2015 at 16:58 to determine if it was the mont belvieu meter site to enterprise eol line. The line was blown down to 0 psi and then nitrogen was introduced. Nitrogen was found to be present at the 2" riser, giving confirmation that the mont belvieu meter site to enterprise eol line was the one leaking. The line was excavated and a pinhole leak was found on the 2" piping. The pipe with the leak was cut out and was replaced. The line was put back in service on 4/12/2015 at 02:30. At 14:28 on 4/11/2015 the nrc was called after the repair cost was determined to be greater than $50,000 dollars.
Detailed record list
Report Received Date
2015-05-07 00:00:00
Iyear
2015
Report Number
20150164
Supplemental Number
20418
Report Type
Original Final
Operator Id
Name
Enterprise Products Operating Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2015-04-11 13:51:00
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Y-Grade
Unintentional Release Bbls
5
Intentional Release Bbls
2000
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2015-04-08 13:00:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2015-04-08 16:58:00
Restart Datetime
2015-04-12 02:30:00
On Site Datetime
2015-04-08 13:00:00
Nrc Rpt Datetime
2015-04-11 14:28:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Mont Belvieu Meter Site To Enterprise Eol
Segment Name
26
Onshore State Abbreviation
Tx
Onshore Postal Code
77580
Onshore City Name
Mont Belvieu
Onshore County Name
Chambers County
Designated Location
Survey Station No.
Designated Name
19+54
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
10
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
2.416
Pipe Wall Thickness
0.208
Pipe Smys
Unknown
Pipe Specification
Api-5l
Pipe Seam Type
Other
Pipe Seam Details
Unknown
Pipe Manufacturer
Unknown
Pipe Coating Type
Other
Pipe Coating Details
Polyken Wrap
Installation Year
1981
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
200
Est Cost Prop Damage
80000
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Prpty
80200
Accident Psig
675
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
6336
Internal Inspection Ind
No
Diameter Change Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The line was not in scada.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
Localized Pitting
Galvanic Corrosion Ind
Yes
Field Exam Basis Ind
Yes
Underground Location
Yes
Under Cathodic Protection Ind
Yes
Cathodic Pro Start Year
1981
Shielding Evident
No
Cathodic Survey Type
Yes
Cp Annual Survey Ind
Yes
Cp Annual Survey Year
2015
Prior Damage
Yes
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2005
Hydrtst Most Rcnt Pressure
2111
Direct Asmnt Conducted
No
Non Destructive Exam Ind
Yes
Exm Radiography Rcnt Year
2015
Exm Radiography Rcnt Ind
Yes
Preparer Name
R** L**
Preparer Title
Pipeline Compliance Engineer
Preparer Email
R***@e****.com
Preparer Telephone
713-381-6741
Prepared Date
2015-05-07 00:00:00
Authorizer Name
R** L**
Authorizer Telephone
713-381-6741
Authorizer Title
Pipeline Compliance Engineer
Authorizer Email
R***@e****.com
Narrative
On 4/8/2015 at 13:00 an enterprise employee noticed an iceball on the ground at the location of a 2" riser at enterprise's mont belvieu facility. The pipeline corridor has several lines, some of which are plant piping. The line was shut down on 4/8/2015 at 16:58 to determine if it was the mont belvieu meter site to enterprise eol line. The line was blown down to 0 psi and then nitrogen was introduced. Nitrogen was found to be present at the 2" riser, giving confirmation that the mont belvieu meter site to enterprise eol line was the one leaking. The line was excavated and a pinhole leak was found on the 2" piping. The pipe with the leak was cut out and was replaced. The line was put back in service on 4/12/2015 at 02:30. At 14:28 on 4/11/2015 the nrc was called after the repair cost was determined to be greater than $50,000 dollars.
Report Received Date 2015-05-07 00:00:00
Iyear 2015
Report Number 20150164
Supplemental Number 20418
Report Type Original Final
Operator Id 31618 PHMSA Enforcement
Name Enterprise Products Operating Llc
Operator Street Address 1100 Louisiana Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2015-04-11 13:51:00
Location Latitude 29.862472 Google Maps OpenStreetMap
Location Longitude -94.905644 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Other Hvl
Commodity Details Y-Grade
Unintentional Release Bbls 5
Intentional Release Bbls 2000
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2015-04-08 13:00:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2015-04-08 16:58:00
Restart Datetime 2015-04-12 02:30:00
On Site Datetime 2015-04-08 13:00:00
Nrc Rpt Datetime 2015-04-11 14:28:00
Nrc Rpt Num 1113327 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Remotely Controlled
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name Mont Belvieu Meter Site To Enterprise Eol
Segment Name 26
Onshore State Abbreviation Tx
Onshore Postal Code 77580
Onshore City Name Mont Belvieu
Onshore County Name Chambers County
Designated Location Survey Station No.
Designated Name 19+54
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 10
Crossing No
Pipe Facility Type Intrastate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 2.416
Pipe Wall Thickness 0.208
Pipe Smys Unknown
Pipe Specification Api-5l
Pipe Seam Type Other
Pipe Seam Details Unknown
Pipe Manufacturer Unknown
Pipe Coating Type Other
Pipe Coating Details Polyken Wrap
Installation Year 1981
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
Other Pop Ind Yes
Other Pop Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 200
Est Cost Prop Damage 80000
Est Cost Emergency 0
Est Cost Environmental 0
Est Cost Other 0
Prpty 80200
Accident Psig 675
Mop Psig 1440
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 6336
Internal Inspection Ind No
Diameter Change Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The line was not in scada.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details External Corrosion
Internal External External Corrosion
Visual Exam Results Localized Pitting
Galvanic Corrosion Ind Yes
Field Exam Basis Ind Yes
Underground Location Yes
Under Cathodic Protection Ind Yes
Cathodic Pro Start Year 1981
Shielding Evident No
Cathodic Survey Type Yes
Cp Annual Survey Ind Yes
Cp Annual Survey Year 2015
Prior Damage Yes
Collected Data Ind No
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 2005
Hydrtst Most Rcnt Pressure 2111
Direct Asmnt Conducted No
Non Destructive Exam Ind Yes
Exm Radiography Rcnt Year 2015
Exm Radiography Rcnt Ind Yes
Preparer Name R** L**
Preparer Title Pipeline Compliance Engineer
Preparer Email R***@e****.com
Preparer Telephone 713-381-6741
Prepared Date 2015-05-07 00:00:00
Authorizer Name R** L**
Authorizer Telephone 713-381-6741
Authorizer Title Pipeline Compliance Engineer
Authorizer Email R***@e****.com
Narrative On 4/8/2015 at 13:00 an enterprise employee noticed an iceball on the ground at the location of a 2" riser at enterprise's mont belvieu facility. The pipeline corridor has several lines, some of which are plant piping. The line was shut down on 4/8/2015 at 16:58 to determine if it was the mont belvieu meter site to enterprise eol line. The line was blown down to 0 psi and then nitrogen was introduced. Nitrogen was found to be present at the 2" riser, giving confirmation that the mont belvieu meter site to enterprise eol line was the one leaking. The line was excavated and a pinhole leak was found on the 2" piping. The pipe with the leak was cut out and was replaced. The line was put back in service on 4/12/2015 at 02:30. At 14:28 on 4/11/2015 the nrc was called after the repair cost was determined to be greater than $50,000 dollars.