HL incident on 2015-04-06 — OK

Operator
Magellan Pipeline Company, Lp
Cause
Incorrect Operation
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2015-04-06 11:00
Report number
Location
OK
Narrative
During local check out of equipment, a facility technician opened the tank valve on tank 1221. A contractor was working on the line downstream of the tank valve and had a flange unbolted. When the valve was opened on tank 1221, product entered the piping and flowed to the flange being worked on, causing the release. The technician was notified by contractors in the area of the release and the tank valve was closed. The spilled crude was picked using an onsite vacuum truck and absorbent pads. After cleanup, microblaze was sprayed on all affected areas.
Detailed record list
Report Received Date
2015-05-05 00:00:00
Iyear
2015
Report Number
20150162
Supplemental Number
20415
Report Type
Supplemental Final
Operator Id
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2015-04-06 08:40:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
2.38
Recovered Bbls
2.38
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2015-04-06 11:00:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Line Was Inactive At The Time Of The Release
On Site Datetime
2015-04-06 11:00:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
East Houston Terminal
Segment Name
Terminal #357
Onshore State Abbreviation
Tx
Onshore Postal Code
77029
Onshore City Name
Houston
Onshore County Name
Harris
Designated Location
Milepost/valve Station
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Flange Assembly
Installation Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
100
Est Cost Prop Damage
0
Est Cost Emergency
1600
Est Cost Environmental
5000
Est Cost Other
0
Prpty
6700
Accident Psig
23
Mop Psig
275
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
No official incident investigation was performed, as operations control supervisor determined that the release was below detectable limits of the tank idle deviation parameters. The controller did not cause or contribute to the release.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Incorrect Operation
Cause Details
Other Incorrect Operation
Operation Type
Other Incorrect Operation
Operation Details
Failure To Follow Procedure
Related Failure Follow Ind
Yes
Category Type
Commissioning
Operator Qualification Ind
No
Preparer Name
K****** L* L*******
Preparer Title
Sr. Compliance Coordinator
Preparer Email
K***********@m*********.com
Preparer Telephone
918-574-7315
Preparer Fax
918-574-7377
Prepared Date
2015-05-06 00:00:00
Authorizer Name
K****** L* L*******
Authorizer Telephone
918-574-7315
Authorizer Title
Sr. Compliance Coordinator
Authorizer Email
K***********@m*********.com
Narrative
During local check out of equipment, a facility technician opened the tank valve on tank 1221. A contractor was working on the line downstream of the tank valve and had a flange unbolted. When the valve was opened on tank 1221, product entered the piping and flowed to the flange being worked on, causing the release. The technician was notified by contractors in the area of the release and the tank valve was closed. The spilled crude was picked using an onsite vacuum truck and absorbent pads. After cleanup, microblaze was sprayed on all affected areas.
Report Received Date 2015-05-05 00:00:00
Iyear 2015
Report Number 20150162
Supplemental Number 20415
Report Type Supplemental Final
Operator Id 22610 PHMSA Enforcement
Name Magellan Pipeline Company, Lp
Operator Street Address 100 West 5th Street
Operator City Name Tulsa
Operator State Abbreviation OK
Operator Postal Code 74103
Local Datetime 2015-04-06 08:40:00
Location Latitude 29.79064 Google Maps OpenStreetMap
Location Longitude -95.2821 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 2.38
Recovered Bbls 2.38
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2015-04-06 11:00:00
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain Line Was Inactive At The Time Of The Release
On Site Datetime 2015-04-06 11:00:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name East Houston Terminal
Segment Name Terminal #357
Onshore State Abbreviation Tx
Onshore Postal Code 77029
Onshore City Name Houston
Onshore County Name Harris
Designated Location Milepost/valve Station
Designated Name 0
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Flange Assembly
Installation Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Connection Failure
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 100
Est Cost Prop Damage 0
Est Cost Emergency 1600
Est Cost Environmental 5000
Est Cost Other 0
Prpty 6700
Accident Psig 23
Mop Psig 275
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details No official incident investigation was performed, as operations control supervisor determined that the release was below detectable limits of the tank idle deviation parameters. The controller did not cause or contribute to the release.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Incorrect Operation
Cause Details Other Incorrect Operation
Operation Type Other Incorrect Operation
Operation Details Failure To Follow Procedure
Related Failure Follow Ind Yes
Category Type Commissioning
Operator Qualification Ind No
Preparer Name K****** L* L*******
Preparer Title Sr. Compliance Coordinator
Preparer Email K***********@m*********.com
Preparer Telephone 918-574-7315
Preparer Fax 918-574-7377
Prepared Date 2015-05-06 00:00:00
Authorizer Name K****** L* L*******
Authorizer Telephone 918-574-7315
Authorizer Title Sr. Compliance Coordinator
Authorizer Email K***********@m*********.com
Narrative During local check out of equipment, a facility technician opened the tank valve on tank 1221. A contractor was working on the line downstream of the tank valve and had a flange unbolted. When the valve was opened on tank 1221, product entered the piping and flowed to the flange being worked on, causing the release. The technician was notified by contractors in the area of the release and the tank valve was closed. The spilled crude was picked using an onsite vacuum truck and absorbent pads. After cleanup, microblaze was sprayed on all affected areas.