Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2015-03-30 — OK
Operator
Magellan Pipeline Company, Lp
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$130,000
Incident datetime
2015-03-30 18:10
Report number
Location
OK
Narrative
While conducting an atmospheric corrosion inspection of a mainline block valve, a magellan corrosion technician discovered product on top of water contained inside the valve can. The product was confined to the can and did not impact the surrounding soil. The valve was removed and replaced with a new valve (as the packing on the leaking valve could not be replaced). Other valve sites on the line were inspected for similar problems and no other leaks were discovered. Note: the national response center was notified after it was determined that total cost including repair exceeded the $50,000 amount listed in 49 cfr part 195.52(a)(3), not because of a threat to public safety or the environment.
Detailed record list
Report Received Date
2015-04-28 00:00:00
Iyear
2015
Report Number
20150155
Supplemental Number
20391
Report Type
Original Final
Operator Id
22610
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2015-03-30 17:52:00
Location Latitude
39.37571
Location Longitude
-95.26018
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
5
Recovered Bbls
5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2015-03-30 18:10:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Line Was Idle When Release Was Discovered
On Site Datetime
2015-03-30 19:20:00
Nrc Rpt Datetime
2015-03-31 14:30:00
Nrc Rpt Num
1112216
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
El Dorado To Wathena Jct. #7-16" Line
Segment Name
6380
Onshore State Abbreviation
Ks
Onshore Postal Code
66097
Onshore City Name
Not Within A Municipality
Onshore County Name
Jefferson
Designated Location
Milepost/valve Station
Designated Name
146.46
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Other
Incident Area Details
In Underground Valve Can
Depth Of Cover
108
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Mainline
Valve Mainline Type
Gate
Valve Manufacturer
M & J
Installation Year
1968
Manufactured Year
1968
Material Involved
Material Other Than Carbon Steel
Material Details
Valve Stem Packing Material
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
130000
Est Cost Emergency
7000
Est Cost Environmental
5000
Est Cost Other
0
Prpty
142000
Accident Psig
368
Mop Psig
1170
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
137280
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
No official incident investigation was performed, as release volume was significantly below alarm tolerances (beyond the limits of the controller, cpm or scada system monitoring capabilities).
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
Seal (Not Pump Seal) Or Packing
Eq Additional Other Ind
Yes
Eq Additional Other Details
Valve Stem Packing Failed And Caused Product Weepage Through The Stem Packing
Preparer Name
K****** L* L*******
Preparer Title
Sr. Compliance Coordinator
Preparer Email
K***********@m*********.com
Preparer Telephone
918-574-7315
Preparer Fax
918-574-7377
Prepared Date
2015-04-28 00:00:00
Authorizer Name
K****** L* L*******
Authorizer Telephone
918-574-7315
Authorizer Title
Sr. Compliance Coordinator
Authorizer Email
K***********@m*********.com
Narrative
While conducting an atmospheric corrosion inspection of a mainline block valve, a magellan corrosion technician discovered product on top of water contained inside the valve can. The product was confined to the can and did not impact the surrounding soil. The valve was removed and replaced with a new valve (as the packing on the leaking valve could not be replaced). Other valve sites on the line were inspected for similar problems and no other leaks were discovered. Note: the national response center was notified after it was determined that total cost including repair exceeded the $50,000 amount listed in 49 cfr part 195.52(a)(3), not because of a threat to public safety or the environment.
| Report Received Date | 2015-04-28 00:00:00 |
|---|---|
| Iyear | 2015 |
| Report Number | 20150155 |
| Supplemental Number | 20391 |
| Report Type | Original Final |
| Operator Id | 22610 PHMSA Enforcement |
| Name | Magellan Pipeline Company, Lp |
| Operator Street Address | 100 West 5th Street |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74103 |
| Local Datetime | 2015-03-30 17:52:00 |
| Location Latitude | 39.37571 Google Maps OpenStreetMap |
| Location Longitude | -95.26018 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Diesel, Fuel Oil, Kerosene, Jet Fuel |
| Unintentional Release Bbls | 5 |
| Recovered Bbls | 5 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2015-03-30 18:10:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Line Was Idle When Release Was Discovered |
| On Site Datetime | 2015-03-30 19:20:00 |
| Nrc Rpt Datetime | 2015-03-31 14:30:00 |
| Nrc Rpt Num | 1112216 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Remotely Controlled |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | El Dorado To Wathena Jct. #7-16" Line |
| Segment Name | 6380 |
| Onshore State Abbreviation | Ks |
| Onshore Postal Code | 66097 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Jefferson |
| Designated Location | Milepost/valve Station |
| Designated Name | 146.46 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Other |
| Incident Area Details | In Underground Valve Can |
| Depth Of Cover | 108 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Valve |
| Valve Type | Mainline |
| Valve Mainline Type | Gate |
| Valve Manufacturer | M & J |
| Installation Year | 1968 |
| Manufactured Year | 1968 |
| Material Involved | Material Other Than Carbon Steel |
| Material Details | Valve Stem Packing Material |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 0 |
| Est Cost Prop Damage | 130000 |
| Est Cost Emergency | 7000 |
| Est Cost Environmental | 5000 |
| Est Cost Other | 0 |
| Prpty | 142000 |
| Accident Psig | 368 |
| Mop Psig | 1170 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 137280 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | No official incident investigation was performed, as release volume was significantly below alarm tolerances (beyond the limits of the controller, cpm or scada system monitoring capabilities). |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Non-Threaded Connection Failure |
| Eq Failure Type | Non-Threaded Connection Failure |
| Other Non Threaded Ind | Seal (Not Pump Seal) Or Packing |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | Valve Stem Packing Failed And Caused Product Weepage Through The Stem Packing |
| Preparer Name | K****** L* L******* |
| Preparer Title | Sr. Compliance Coordinator |
| Preparer Email | K***********@m*********.com |
| Preparer Telephone | 918-574-7315 |
| Preparer Fax | 918-574-7377 |
| Prepared Date | 2015-04-28 00:00:00 |
| Authorizer Name | K****** L* L******* |
| Authorizer Telephone | 918-574-7315 |
| Authorizer Title | Sr. Compliance Coordinator |
| Authorizer Email | K***********@m*********.com |
| Narrative | While conducting an atmospheric corrosion inspection of a mainline block valve, a magellan corrosion technician discovered product on top of water contained inside the valve can. The product was confined to the can and did not impact the surrounding soil. The valve was removed and replaced with a new valve (as the packing on the leaking valve could not be replaced). Other valve sites on the line were inspected for similar problems and no other leaks were discovered. Note: the national response center was notified after it was determined that total cost including repair exceeded the $50,000 amount listed in 49 cfr part 195.52(a)(3), not because of a threat to public safety or the environment. |