GTG incident on 2015-08-12 — TX
Operator
Kinetica Energy Express Llc
Cause
Corrosion Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2015-08-12 14:42
Report number
Location
TX
Narrative
Platform operator for energy xxi contacted kinetica energy express pipeline operations supervisor on 8/12/2015 stating that bubbles had been spotted on the water's surface about 1/2 mile from their platform. Kinetica personnel were dispatched via helicopter to the platform in order to isolate pipeline. At 14:00, platform valves were closed to isolate production from the pipeline. Pressure was monitored to determine if leak was in fact on kinetica's pipeline. At 14:42, it was determined that leak was on kinetica's line. Arrangements were made with producer to relieve pressure from the pipeline to 70 psig so divers could work on pipeline at leak location. Dive vessel was procured and dispatched to the area. Upon arrival in the area, first closed sub-sea tie-in valve in preparation of pipeline repair. Diver excavated leak area and removed concrete coating from pipe. Diver identified a small pinhole leak. The general area had ut inspection performed, and no indications of generalized corrosion were identified. A repair clamp was installed. The platform valves were re-opened. Platform operator was asked to begin production into the line to increase pressure while dive vessel monitored for leaks. After the initial pressurization, the pipeline was returned to service in incremental steps while dive vessel continually monitored location for signs of leak. After determining that the repair was successful, the dive vessel departed location.
Detailed record list
Report Received Date
2015-09-14 00:00:00
Iyear
2015
Report Number
20150112
Supplemental Number
16935
Report Type
Supplemental Final
Operator Id
38987
Name
Kinetica Energy Express Llc
Operator Street Address
1001 Mckinney Street, Suite 900
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2015-08-12 14:42:00
Location Latitude
28.58
Location Longitude
-91.87066667
Nrc Rpt Num
1125462
Nrc Rpt Datetime
2015-08-12 15:50:00
Commodity Released Type
Natural Gas
Unintentional Release
30
Intentional Release
623
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2015-08-12 14:00:00
Restart Datetime
2015-08-20 16:30:00
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Incident Identified Datetime
2015-08-12 14:42:00
On Site Datetime
2015-08-12 14:00:00
On Off Shore
Offshore
Off Water Depth
145
Off Accident Origin
On The Outer Continental Shelf (Ocs)
Off Ocs Area
South Marsh Island
Off Ocs Block
78
Off Area Accident Type
Below Water, Pipe Buried Or Jetted Below Seabed
Pipe Facility Type
Interstate
System Part Involved
Offshore Pipeline, Including Riser And Riser Bend
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
16
Pipe Wall Thickness
0.375
Pipe Smys
52000
Pipe Specification
5l
Pipe Seam Type
Seamless
Pipe Manufacturer
Nippon
Pipe Coating Type
Epoxy
Installation Year
1991
Manufactured Year
1988
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
660
Heat Damage Ind
No
Non Heat Damage Ind
No
Hca Fatalities Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
83
Est Cost Intentional Release
1713
Est Cost Prop Damage
0
Est Cost Emergency
1600
Est Cost Other
265000
Est Cost Other Details
Cost Of Repair Clamp, Dive Vessel, Divers And Company Personnel
Prpty
268396
Accident Psig
880
Mop Psig
1250
Mop Cfr Section
Other
Mop Cfr Section Details
Not On Omb-Approved Form When Submitted
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Length Segment Isolated
8622
Internal Inspection Ind
No
Other Inspection Ind
Yes
Internal Inspection Details
Subsea Tie-In Configuration Will Not Allow For The Passage Of Inspection Tools
Operation Complications Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Other
Accident Details
Platform Operator Identified Bubbles On Sea Surface
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Remote location offshore with pressures well below established maop
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Other
Int Visual Exam Details
Pinhole Identified
Int Microbiological Ind
Yes
Int Field Exam Basis Ind
Yes
Int Other Loc Ind
Yes
Corrosion Location Details
6:00 Position
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Yes
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
K*** J* C*******
Preparer Title
Senior Director
Preparer Email
K************@k**********.com
Preparer Telephone
9852092283
Preparer Fax
9852236197
Authorizer Name
K*** J* C*******
Authorizer Title
Senior Director
Authorizer Telephone
9852092283
Authorizer Email
K************@k**********.com
Narrative
Platform operator for energy xxi contacted kinetica energy express pipeline operations supervisor on 8/12/2015 stating that bubbles had been spotted on the water's surface about 1/2 mile from their platform. Kinetica personnel were dispatched via helicopter to the platform in order to isolate pipeline. At 14:00, platform valves were closed to isolate production from the pipeline. Pressure was monitored to determine if leak was in fact on kinetica's pipeline. At 14:42, it was determined that leak was on kinetica's line. Arrangements were made with producer to relieve pressure from the pipeline to 70 psig so divers could work on pipeline at leak location. Dive vessel was procured and dispatched to the area. Upon arrival in the area, first closed sub-sea tie-in valve in preparation of pipeline repair. Diver excavated leak area and removed concrete coating from pipe. Diver identified a small pinhole leak. The general area had ut inspection performed, and no indications of generalized corrosion were identified. A repair clamp was installed. The platform valves were re-opened. Platform operator was asked to begin production into the line to increase pressure while dive vessel monitored for leaks. After the initial pressurization, the pipeline was returned to service in incremental steps while dive vessel continually monitored location for signs of leak. After determining that the repair was successful, the dive vessel departed location.
| Report Received Date | 2015-09-14 00:00:00 |
|---|---|
| Iyear | 2015 |
| Report Number | 20150112 |
| Supplemental Number | 16935 |
| Report Type | Supplemental Final |
| Operator Id | 38987 PHMSA Enforcement |
| Name | Kinetica Energy Express Llc |
| Operator Street Address | 1001 Mckinney Street, Suite 900 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2015-08-12 14:42:00 |
| Location Latitude | 28.58 Google Maps OpenStreetMap |
| Location Longitude | -91.87066667 Google Maps OpenStreetMap |
| Nrc Rpt Num | 1125462 NRC Report How to search |
| Nrc Rpt Datetime | 2015-08-12 15:50:00 |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 30 |
| Intentional Release | 623 |
| Accompanying Liquid | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2015-08-12 14:00:00 |
| Restart Datetime | 2015-08-20 16:30:00 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Incident Identified Datetime | 2015-08-12 14:42:00 |
| On Site Datetime | 2015-08-12 14:00:00 |
| On Off Shore | Offshore |
| Off Water Depth | 145 |
| Off Accident Origin | On The Outer Continental Shelf (Ocs) |
| Off Ocs Area | South Marsh Island |
| Off Ocs Block | 78 |
| Off Area Accident Type | Below Water, Pipe Buried Or Jetted Below Seabed |
| Pipe Facility Type | Interstate |
| System Part Involved | Offshore Pipeline, Including Riser And Riser Bend |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 16 |
| Pipe Wall Thickness | 0.375 |
| Pipe Smys | 52000 |
| Pipe Specification | 5l |
| Pipe Seam Type | Seamless |
| Pipe Manufacturer | Nippon |
| Pipe Coating Type | Epoxy |
| Installation Year | 1991 |
| Manufactured Year | 1988 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Class Location Type | Class 1 Location |
| Could Be Hca | No |
| Pir Radius | 660 |
| Heat Damage Ind | No |
| Non Heat Damage Ind | No |
| Hca Fatalities Ind | No |
| Est Cost Oper Paid | 0 |
| Est Cost Unintentional Release | 83 |
| Est Cost Intentional Release | 1713 |
| Est Cost Prop Damage | 0 |
| Est Cost Emergency | 1600 |
| Est Cost Other | 265000 |
| Est Cost Other Details | Cost Of Repair Clamp, Dive Vessel, Divers And Company Personnel |
| Prpty | 268396 |
| Accident Psig | 880 |
| Mop Psig | 1250 |
| Mop Cfr Section | Other View CFR 49 §192 |
| Mop Cfr Section Details | Not On Omb-Approved Form When Submitted |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Pressure Restriction Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Length Segment Isolated | 8622 |
| Internal Inspection Ind | No |
| Other Inspection Ind | Yes |
| Internal Inspection Details | Subsea Tie-In Configuration Will Not Allow For The Passage Of Inspection Tools |
| Operation Complications Ind | No |
| Pipeline Function | Transmission System |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Accident Identifier | Other |
| Accident Details | Platform Operator Identified Bubbles On Sea Surface |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Remote location offshore with pressures well below established maop |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | Internal Corrosion |
| Internal External | Internal Corrosion |
| Int Visual Exam Results | Other |
| Int Visual Exam Details | Pinhole Identified |
| Int Microbiological Ind | Yes |
| Int Field Exam Basis Ind | Yes |
| Int Other Loc Ind | Yes |
| Corrosion Location Details | 6:00 Position |
| Corrosion Inhibitors | Yes |
| Corrosion Lining | No |
| Cleaning Dewatering | Not Applicable - Not Mainline Pipe |
| Corrosion Coupons | Yes |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | K*** J* C******* |
| Preparer Title | Senior Director |
| Preparer Email | K************@k**********.com |
| Preparer Telephone | 9852092283 |
| Preparer Fax | 9852236197 |
| Authorizer Name | K*** J* C******* |
| Authorizer Title | Senior Director |
| Authorizer Telephone | 9852092283 |
| Authorizer Email | K************@k**********.com |
| Narrative | Platform operator for energy xxi contacted kinetica energy express pipeline operations supervisor on 8/12/2015 stating that bubbles had been spotted on the water's surface about 1/2 mile from their platform. Kinetica personnel were dispatched via helicopter to the platform in order to isolate pipeline. At 14:00, platform valves were closed to isolate production from the pipeline. Pressure was monitored to determine if leak was in fact on kinetica's pipeline. At 14:42, it was determined that leak was on kinetica's line. Arrangements were made with producer to relieve pressure from the pipeline to 70 psig so divers could work on pipeline at leak location. Dive vessel was procured and dispatched to the area. Upon arrival in the area, first closed sub-sea tie-in valve in preparation of pipeline repair. Diver excavated leak area and removed concrete coating from pipe. Diver identified a small pinhole leak. The general area had ut inspection performed, and no indications of generalized corrosion were identified. A repair clamp was installed. The platform valves were re-opened. Platform operator was asked to begin production into the line to increase pressure while dive vessel monitored for leaks. After the initial pressurization, the pipeline was returned to service in incremental steps while dive vessel continually monitored location for signs of leak. After determining that the repair was successful, the dive vessel departed location. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA