GD incident on 2015-06-04 — IA

Operator
Midamerican Energy Company
Cause
Notification Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 1 injury
Property damage (nominal)
$813
Incident datetime
2015-06-04 10:36
Report number
Location
IA, POLK
Narrative
A third party contractor (c & m plumbing llc) installing a drain line from a garage to a pond damaged a 1/2 inch plastic natural gas service line (60 psig) with a mini-excavator. The blowing gas caught fire and one contractor employee was injured from fire with 2nd degree burns to the face and arms. Property damage was limited to the service line and contractor equipment. An ambulance responded to the site for the contractor and he was taken the hospital for medical treatment. The injured contractor, clint mahon, was admitted. The plastic service was squeezed off shortly after operator crews arrived and was restored that afternoon. Locates were not requested or performed prior to the initial excavation by c & m plumbing llc. The exact time the contractor hit the plastic service line is not known. The local time of the incident is shown on line 4 in part a as 10:35 which is when 911 was notified of the incident. At 10:36, midamerican energy company was notified of the damaged pipe. At 13:00, midamerican energy company determined the injured party was admitted to the hospital. Midamerican energy company then promptly notified the iowa utilities board and the national response center at 13:26.
Detailed record list
Occurred At
2015-06-04 10:36:00
Year
2015
Report Received Date
2015-07-01 00:00:00
Iyear
2015.0
Report Number
20150064.0
Supplemental Number
16210.0
Report Type
Supplemental Final
Operator Id
Name
Midamerican Energy Company
Operator Street Address
666 Grand Avenue, Suite 500
Operator City Name
Des Moines
Operator State Abbreviation
IA
Operator Postal Code
50309-2580
Local Datetime
2015-06-04 10:35:00
Location Street Address
7538 Northeast 114th Avenue
Location City Name
Not Within A Municipality
Location County Name
Polk
Location State Abbreviation
IA
Location Postal Code
50035
Location Latitude
Location Longitude
-93.45639186
Nrc Rpt Datetime
2015-06-04 13:26:00
Nrc Rpt Num
Commodity Released Type
Natural Gas
Unintentional Release
1.37
Fatality Ind
No
Fatal
0
Injury Ind
Yes
Num Emp Injuries
0
Num Contr Injuries
0
Num Er Injuries
0
Num Worker Injuries
1
Num Gp Injuries
0
Injure
1
Ignite Ind
Yes
Explode Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2015-06-04 10:36:00
On Site Datetime
2015-06-04 11:30:00
Federal
No
Location Type
Private Property
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
24.0
Crossing
No
Pipe Facility Type
Investor Owned
System Part Involved
Service
Installation Year
2015.0
Pipe Diameter
0.5
Pipe Specification
Astm D2513
Pipe Manufacturer
Driscoplex
Material Involved
Plastic
Plastic Type
Polyethylene (Pe)
Wt Plastic
0.09
Material Pe Pipe Code
2406
Release Type
Mechanical Puncture
Puncture Axial
28.0
Puncture Circum
0.5
Class Location Type
Class 2 Location
Est Cost Oper Paid
1000.0
Est Cost Prop Damage
813.0
Est Cost Emergency
652.0
Est Cost Other
975.0
Est Cost Other Details
Emergency Response Cost - Non Operator
Est Cost Unintentional Release
6.0
Prpty
3446.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
1.0
Accident Psig
60.0
Normal Psig
60.0
Mop Psig
60.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
No
Accident Identifier
Notification From Public
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Individual residential service failure would not have been detectable by the control room
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
No
Notify Cga Dirt
Yes
Private Row Ind
Yes
Private Subtype
Private Landowner
Excavator Type
Contractor
Excavator Equipment
Backhoe/trackhoe
Work Performed
Sewer (Sanitary/storm)
One Call Notified Ind
No
Service Interruption
Yes
Service Interruption Hours
4.0
Root Cause Category
Notification Issue
Root Cause Type
No Notification Made To The One-Call Center/811
Preparer Name
C********** R* P****
Preparer Title
Gas Standards Engineer
Preparer Email
C******@m**********.com
Preparer Telephone
712-277-7941
Preparer Fax
712-252-7369
Authorizer Name
A*** L* W*****
Authorizer Title
Vice President Gas Delivery
Authorizer Telephone
515-252-6945
Authorizer Email
A*******@m**********.com
Narrative
A third party contractor (c & m plumbing llc) installing a drain line from a garage to a pond damaged a 1/2 inch plastic natural gas service line (60 psig) with a mini-excavator. The blowing gas caught fire and one contractor employee was injured from fire with 2nd degree burns to the face and arms. Property damage was limited to the service line and contractor equipment. An ambulance responded to the site for the contractor and he was taken the hospital for medical treatment. The injured contractor, clint mahon, was admitted. The plastic service was squeezed off shortly after operator crews arrived and was restored that afternoon. Locates were not requested or performed prior to the initial excavation by c & m plumbing llc. The exact time the contractor hit the plastic service line is not known. The local time of the incident is shown on line 4 in part a as 10:35 which is when 911 was notified of the incident. At 10:36, midamerican energy company was notified of the damaged pipe. At 13:00, midamerican energy company determined the injured party was admitted to the hospital. Midamerican energy company then promptly notified the iowa utilities board and the national response center at 13:26.
Occurred At 2015-06-04 10:36:00
Year 2015
Report Received Date 2015-07-01 00:00:00
Iyear 2015.0
Report Number 20150064.0
Supplemental Number 16210.0
Report Type Supplemental Final
Operator Id 30750 PHMSA Enforcement
Name Midamerican Energy Company
Operator Street Address 666 Grand Avenue, Suite 500
Operator City Name Des Moines
Operator State Abbreviation IA
Operator Postal Code 50309-2580
Local Datetime 2015-06-04 10:35:00
Location Street Address 7538 Northeast 114th Avenue
Location City Name Not Within A Municipality
Location County Name Polk
Location State Abbreviation IA
Location Postal Code 50035
Location Latitude 41.76875301 Google Maps OpenStreetMap
Location Longitude -93.45639186 Google Maps OpenStreetMap
Nrc Rpt Datetime 2015-06-04 13:26:00
Nrc Rpt Num 1118659 NRC Report How to search
Commodity Released Type Natural Gas
Unintentional Release 1.37
Fatality Ind No
Fatal 0
Injury Ind Yes
Num Emp Injuries 0
Num Contr Injuries 0
Num Er Injuries 0
Num Worker Injuries 1
Num Gp Injuries 0
Injure 1
Ignite Ind Yes
Explode Ind No
Num Pub Evacuated 0.0
Incident Identified Datetime 2015-06-04 10:36:00
On Site Datetime 2015-06-04 11:30:00
Federal No
Location Type Private Property
Incident Area Type Underground
Incident Area Subtype Exposed Due To Excavation
Depth Of Cover 24.0
Crossing No
Pipe Facility Type Investor Owned
System Part Involved Service
Installation Year 2015.0
Pipe Diameter 0.5
Pipe Specification Astm D2513
Pipe Manufacturer Driscoplex
Material Involved Plastic
Plastic Type Polyethylene (Pe)
Wt Plastic 0.09
Material Pe Pipe Code 2406
Release Type Mechanical Puncture
Puncture Axial 28.0
Puncture Circum 0.5
Class Location Type Class 2 Location
Est Cost Oper Paid 1000.0
Est Cost Prop Damage 813.0
Est Cost Emergency 652.0
Est Cost Other 975.0
Est Cost Other Details Emergency Response Cost - Non Operator
Est Cost Unintentional Release 6.0
Prpty 3446.0
Commercial Affected 0.0
Industrial Affected 0.0
Residences Affected 1.0
Accident Psig 60.0
Normal Psig 60.0
Mop Psig 60.0
Accident Pressure Pressure Did Not Exceed Maop
Scada In Place Ind No
Accident Identifier Notification From Public
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Individual residential service failure would not have been detectable by the control room
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind No
Notify Cga Dirt Yes
Private Row Ind Yes
Private Subtype Private Landowner
Excavator Type Contractor
Excavator Equipment Backhoe/trackhoe
Work Performed Sewer (Sanitary/storm)
One Call Notified Ind No
Service Interruption Yes
Service Interruption Hours 4.0
Root Cause Category Notification Issue
Root Cause Type No Notification Made To The One-Call Center/811
Preparer Name C********** R* P****
Preparer Title Gas Standards Engineer
Preparer Email C******@m**********.com
Preparer Telephone 712-277-7941
Preparer Fax 712-252-7369
Authorizer Name A*** L* W*****
Authorizer Title Vice President Gas Delivery
Authorizer Telephone 515-252-6945
Authorizer Email A*******@m**********.com
Narrative A third party contractor (c & m plumbing llc) installing a drain line from a garage to a pond damaged a 1/2 inch plastic natural gas service line (60 psig) with a mini-excavator. The blowing gas caught fire and one contractor employee was injured from fire with 2nd degree burns to the face and arms. Property damage was limited to the service line and contractor equipment. An ambulance responded to the site for the contractor and he was taken the hospital for medical treatment. The injured contractor, clint mahon, was admitted. The plastic service was squeezed off shortly after operator crews arrived and was restored that afternoon. Locates were not requested or performed prior to the initial excavation by c & m plumbing llc. The exact time the contractor hit the plastic service line is not known. The local time of the incident is shown on line 4 in part a as 10:35 which is when 911 was notified of the incident. At 10:36, midamerican energy company was notified of the damaged pipe. At 13:00, midamerican energy company determined the injured party was admitted to the hospital. Midamerican energy company then promptly notified the iowa utilities board and the national response center at 13:26.