GD incident on 2015-04-29 — WI
Operator
Wisconsin Gas Llc Dba We Energies
Cause
Notification Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$3,000
Incident datetime
2015-04-29 09:32
Report number
Location
WI, TAYLOR
Narrative
On wednesday, april 29th, 2015, at 9:32 a.M., we energies was notified by a local fire department that a gas main had been struck by a contractor performing soil borings at 316 s. Main street in medford, wisconsin. We energies dispatched a first responder to the site at 9:34 a.M. And determined the valves required to stop the flow of gas. While the fire department was evacuating buildings within a 2 block radius of the damaged gas main, the gas ignited at approximately 9:45 a.M. It is believed that the soil boring machine, which was left on, was the source of ignition. The first employee from we energies arrived on site at 10:05 a.M. And the gas was shut off at 10:37 a.M. Once the gas was shut off and the site was deemed safe, we energies employees assessed whether or not this event met the criteria of a reportable incident. It was determined that there were no injuries or fatalities and that the amount of gas released was well below 3 mmcf; however, property damage of more than $50,000 occurred. A phone notification was made to the national response center at 11:38 a.M. Of a possible natural gas incident per 49 cfr part 191.3. The wisconsin public service commission pipeline safety manager was also informed of the incident. After the fire had been completely extinguished and the debris had been removed, we energies replaced the damage section of 4 inch steel main. The main repair was completed by about 4:00 p.M. And restoring service to the 13 customers affected proceeded through the evening. Investigation of the incident determined that the soil boring contractor provided an inadequate description of the area requiring utility locates to the one call system.
Detailed record list
Occurred At
2015-04-29 09:32:00
Year
2015
Report Received Date
2015-05-26 00:00:00
Iyear
2015.0
Report Number
20150051.0
Supplemental Number
16086.0
Report Type
Original Final
Operator Id
22763
Name
Wisconsin Gas Llc Dba We Energies
Operator Street Address
231 W. Michigan Street
Operator City Name
Milwaukee
Operator State Abbreviation
WI
Operator Postal Code
53203
Local Datetime
2015-04-29 10:05:00
Location Street Address
316 S. Main Street
Location City Name
Medford
Location County Name
Taylor
Location State Abbreviation
WI
Location Postal Code
54451
Location Latitude
45.136
Location Longitude
-90.3428
Nrc Rpt Datetime
2015-04-29 11:38:00
Nrc Rpt Num
115011
Commodity Released Type
Natural Gas
Unintentional Release
339.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
Yes
Explode Ind
No
Num Pub Evacuated
60.0
Incident Identified Datetime
2015-04-29 09:32:00
On Site Datetime
2015-04-29 10:05:00
Federal
No
Location Type
Public Property
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
38.0
Crossing
No
Pipe Facility Type
Investor Owned
System Part Involved
Main
Installation Year
1963.0
Pipe Diameter
4.0
Pipe Specification
Api 5l
Pipe Manufacturer
Acme - Newport Steel Company
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
Erw
Wt Steel
0.156
Release Type
Mechanical Puncture
Puncture Axial
9.0
Puncture Circum
3.0
Class Location Type
Class 3 Location
Est Cost Oper Paid
112500.0
Est Cost Prop Damage
3000.0
Est Cost Emergency
2500.0
Est Cost Other
0.0
Est Cost Unintentional Release
1836.0
Prpty
119836.0
Commercial Affected
4.0
Industrial Affected
0.0
Residences Affected
9.0
Accident Psig
55.0
Normal Psig
55.0
Mop Psig
60.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Notification From Emergency Responder
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Schedule Ind
Yes
Invest No Schedule Ind Details
The Incident Was Clearly The Result Of 3rd Party Excavation Damage.
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
Notify Cga Dirt
No
Public Row Ind
Yes
Public Subtype
City Street
Excavator Type
Contractor
Excavator Equipment
Auger
Work Performed
Unknown/other
One Call Notified Ind
Yes
One Call Ticket Num
20151715490
Locator Type
Contract Locator
Visible Marks
No
Service Interruption
Yes
Service Interruption Hours
6.0
Root Cause Category
Notification Issue
Root Cause Type
Excavator Provided Incorrect Notification Information
Preparer Name
C********** G****
Preparer Title
Engineer
Preparer Email
C****************@w**********.com
Preparer Telephone
(414) 221-5347
Authorizer Name
T** S*******
Authorizer Title
Manager Regulatory Compliance
Authorizer Telephone
414-221-5173
Authorizer Email
T***********@w**********.com
Narrative
On wednesday, april 29th, 2015, at 9:32 a.M., we energies was notified by a local fire department that a gas main had been struck by a contractor performing soil borings at 316 s. Main street in medford, wisconsin. We energies dispatched a first responder to the site at 9:34 a.M. And determined the valves required to stop the flow of gas. While the fire department was evacuating buildings within a 2 block radius of the damaged gas main, the gas ignited at approximately 9:45 a.M. It is believed that the soil boring machine, which was left on, was the source of ignition. The first employee from we energies arrived on site at 10:05 a.M. And the gas was shut off at 10:37 a.M. Once the gas was shut off and the site was deemed safe, we energies employees assessed whether or not this event met the criteria of a reportable incident. It was determined that there were no injuries or fatalities and that the amount of gas released was well below 3 mmcf; however, property damage of more than $50,000 occurred. A phone notification was made to the national response center at 11:38 a.M. Of a possible natural gas incident per 49 cfr part 191.3. The wisconsin public service commission pipeline safety manager was also informed of the incident. After the fire had been completely extinguished and the debris had been removed, we energies replaced the damage section of 4 inch steel main. The main repair was completed by about 4:00 p.M. And restoring service to the 13 customers affected proceeded through the evening. Investigation of the incident determined that the soil boring contractor provided an inadequate description of the area requiring utility locates to the one call system.
| Occurred At | 2015-04-29 09:32:00 |
|---|---|
| Year | 2015 |
| Report Received Date | 2015-05-26 00:00:00 |
| Iyear | 2015.0 |
| Report Number | 20150051.0 |
| Supplemental Number | 16086.0 |
| Report Type | Original Final |
| Operator Id | 22763 PHMSA Enforcement |
| Name | Wisconsin Gas Llc Dba We Energies |
| Operator Street Address | 231 W. Michigan Street |
| Operator City Name | Milwaukee |
| Operator State Abbreviation | WI |
| Operator Postal Code | 53203 |
| Local Datetime | 2015-04-29 10:05:00 |
| Location Street Address | 316 S. Main Street |
| Location City Name | Medford |
| Location County Name | Taylor |
| Location State Abbreviation | WI |
| Location Postal Code | 54451 |
| Location Latitude | 45.136 Google Maps OpenStreetMap |
| Location Longitude | -90.3428 Google Maps OpenStreetMap |
| Nrc Rpt Datetime | 2015-04-29 11:38:00 |
| Nrc Rpt Num | 115011 NRC Report How to search |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 339.0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Ignite Ind | Yes |
| Explode Ind | No |
| Num Pub Evacuated | 60.0 |
| Incident Identified Datetime | 2015-04-29 09:32:00 |
| On Site Datetime | 2015-04-29 10:05:00 |
| Federal | No |
| Location Type | Public Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Exposed Due To Excavation |
| Depth Of Cover | 38.0 |
| Crossing | No |
| Pipe Facility Type | Investor Owned |
| System Part Involved | Main |
| Installation Year | 1963.0 |
| Pipe Diameter | 4.0 |
| Pipe Specification | Api 5l |
| Pipe Manufacturer | Acme - Newport Steel Company |
| Material Involved | Steel |
| Steel Seam Type | Other |
| Steel Seam Type Details | Erw |
| Wt Steel | 0.156 |
| Release Type | Mechanical Puncture |
| Puncture Axial | 9.0 |
| Puncture Circum | 3.0 |
| Class Location Type | Class 3 Location |
| Est Cost Oper Paid | 112500.0 |
| Est Cost Prop Damage | 3000.0 |
| Est Cost Emergency | 2500.0 |
| Est Cost Other | 0.0 |
| Est Cost Unintentional Release | 1836.0 |
| Prpty | 119836.0 |
| Commercial Affected | 4.0 |
| Industrial Affected | 0.0 |
| Residences Affected | 9.0 |
| Accident Psig | 55.0 |
| Normal Psig | 55.0 |
| Mop Psig | 60.0 |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Accident Identifier | Notification From Emergency Responder |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest No Schedule Ind | Yes |
| Invest No Schedule Ind Details | The Incident Was Clearly The Result Of 3rd Party Excavation Damage. |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Excavation Damage |
| Cause Details | Excavation Damage By Third Party |
| Ex Party Type | Excavation Damage By Third Party |
| Prior Notification Ind | Yes |
| One Call System Ind | Yes |
| Notify Cga Dirt | No |
| Public Row Ind | Yes |
| Public Subtype | City Street |
| Excavator Type | Contractor |
| Excavator Equipment | Auger |
| Work Performed | Unknown/other |
| One Call Notified Ind | Yes |
| One Call Ticket Num | 20151715490 |
| Locator Type | Contract Locator |
| Visible Marks | No |
| Service Interruption | Yes |
| Service Interruption Hours | 6.0 |
| Root Cause Category | Notification Issue |
| Root Cause Type | Excavator Provided Incorrect Notification Information |
| Preparer Name | C********** G**** |
| Preparer Title | Engineer |
| Preparer Email | C****************@w**********.com |
| Preparer Telephone | (414) 221-5347 |
| Authorizer Name | T** S******* |
| Authorizer Title | Manager Regulatory Compliance |
| Authorizer Telephone | 414-221-5173 |
| Authorizer Email | T***********@w**********.com |
| Narrative | On wednesday, april 29th, 2015, at 9:32 a.M., we energies was notified by a local fire department that a gas main had been struck by a contractor performing soil borings at 316 s. Main street in medford, wisconsin. We energies dispatched a first responder to the site at 9:34 a.M. And determined the valves required to stop the flow of gas. While the fire department was evacuating buildings within a 2 block radius of the damaged gas main, the gas ignited at approximately 9:45 a.M. It is believed that the soil boring machine, which was left on, was the source of ignition. The first employee from we energies arrived on site at 10:05 a.M. And the gas was shut off at 10:37 a.M. Once the gas was shut off and the site was deemed safe, we energies employees assessed whether or not this event met the criteria of a reportable incident. It was determined that there were no injuries or fatalities and that the amount of gas released was well below 3 mmcf; however, property damage of more than $50,000 occurred. A phone notification was made to the national response center at 11:38 a.M. Of a possible natural gas incident per 49 cfr part 191.3. The wisconsin public service commission pipeline safety manager was also informed of the incident. After the fire had been completely extinguished and the debris had been removed, we energies replaced the damage section of 4 inch steel main. The main repair was completed by about 4:00 p.M. And restoring service to the 13 customers affected proceeded through the evening. Investigation of the incident determined that the soil boring contractor provided an inadequate description of the area requiring utility locates to the one call system. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA