GD incident on 2015-02-16 — MA

Operator
Columbia Gas Of Massachusetts
Cause
Other Outside Force Damage
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$1,000
Incident datetime
2015-02-16 14:29
Report number
Location
MA, PLYMOUTH
Narrative
There was a build up of snow and ice on the meter set causing the riser after the insulated union to break resulting in a release of gas. The release of gas ignited resulting in a fire and property damage. Part c subpart 2a & 4 are associated with the service line. The company was unable to determine how the snow build up occurred (I.E. Whether it was associated with natural force or a 3rd party).There was a breakdown in the notification process which resulted in a delayed nrc call being made. The company has since implemented annual training to provide continuous education on the reporting requirements at both a state and federal level.
Detailed record list
Occurred At
2015-02-16 14:29:00
Year
2015
Report Received Date
2015-04-16 00:00:00
Iyear
2015.0
Report Number
20150043.0
Supplemental Number
30797.0
Report Type
Supplemental Final
Operator Id
Name
Columbia Gas Of Massachusetts
Operator Street Address
4 Technology Drive
Operator City Name
Westborough
Operator State Abbreviation
MA
Operator Postal Code
01581
Local Datetime
2015-02-16 14:29:00
Location Street Address
59 Lone St
Location City Name
Marshfield
Location County Name
Plymouth
Location State Abbreviation
MA
Location Postal Code
02050
Location Latitude
Location Longitude
Nrc Rpt Datetime
2015-04-02 15:45:00
Nrc Rpt Num
Commodity Released Type
Natural Gas
Unintentional Release
13.97
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
Yes
Explode Ind
No
Num Pub Evacuated
11.0
Incident Identified Datetime
2015-02-16 14:29:00
On Site Datetime
2015-02-16 14:47:00
Federal
No
Location Type
Private Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance (E.g. Value Or Regulator Station, Outdoor Meter Set)
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
Outside Meter/regulator Set
Installation Year
1996.0
Material Involved
Plastic
Plastic Type
Polyethylene (Pe)
Wt Plastic
0.121
Material Pe Pipe Code
3408
Release Type
Leak
Leak Type
Connection Failure
Class Location Type
Class 3 Location
Est Cost Oper Paid
50000.0
Est Cost Prop Damage
1000.0
Est Cost Emergency
1000.0
Est Cost Other
600.0
Est Cost Other Details
Pressure Testing
Est Cost Unintentional Release
82.0
Prpty
52682.0
Commercial Affected
1.0
Industrial Affected
0.0
Residences Affected
0.0
Accident Psig
67.0
Normal Psig
67.0
Mop Psig
99.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
No
Accident Identifier
Notification From Emergency Responder
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Outside Force Damage
Cause Details
Other Outside Force Damage
Outside Force Type
Other Outside Force Damage
Osf Other Details
Riser After The Insulated Union Broke Due To Snow/ice Load
Preparer Name
M***** B*********
Preparer Title
Compliance Operations Manager
Preparer Email
M**********@n*******.com
Authorizer Name
M****** B*********
Authorizer Title
Compliance Operations Manager
Authorizer Telephone
508.468.9956
Authorizer Email
M**********@n*******.com
Narrative
There was a build up of snow and ice on the meter set causing the riser after the insulated union to break resulting in a release of gas. The release of gas ignited resulting in a fire and property damage. Part c subpart 2a & 4 are associated with the service line. The company was unable to determine how the snow build up occurred (I.E. Whether it was associated with natural force or a 3rd party).There was a breakdown in the notification process which resulted in a delayed nrc call being made. The company has since implemented annual training to provide continuous education on the reporting requirements at both a state and federal level.
Occurred At 2015-02-16 14:29:00
Year 2015
Report Received Date 2015-04-16 00:00:00
Iyear 2015.0
Report Number 20150043.0
Supplemental Number 30797.0
Report Type Supplemental Final
Operator Id 1209 PHMSA Enforcement
Name Columbia Gas Of Massachusetts
Operator Street Address 4 Technology Drive
Operator City Name Westborough
Operator State Abbreviation MA
Operator Postal Code 01581
Local Datetime 2015-02-16 14:29:00
Location Street Address 59 Lone St
Location City Name Marshfield
Location County Name Plymouth
Location State Abbreviation MA
Location Postal Code 02050
Location Latitude 42.104731 Google Maps OpenStreetMap
Location Longitude -70.759835 Google Maps OpenStreetMap
Nrc Rpt Datetime 2015-04-02 15:45:00
Nrc Rpt Num 1112400 NRC Report How to search
Commodity Released Type Natural Gas
Unintentional Release 13.97
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind Yes
Explode Ind No
Num Pub Evacuated 11.0
Incident Identified Datetime 2015-02-16 14:29:00
On Site Datetime 2015-02-16 14:47:00
Federal No
Location Type Private Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance (E.g. Value Or Regulator Station, Outdoor Meter Set)
Crossing No
Pipe Facility Type Privately Owned
System Part Involved Outside Meter/regulator Set
Installation Year 1996.0
Material Involved Plastic
Plastic Type Polyethylene (Pe)
Wt Plastic 0.121
Material Pe Pipe Code 3408
Release Type Leak
Leak Type Connection Failure
Class Location Type Class 3 Location
Est Cost Oper Paid 50000.0
Est Cost Prop Damage 1000.0
Est Cost Emergency 1000.0
Est Cost Other 600.0
Est Cost Other Details Pressure Testing
Est Cost Unintentional Release 82.0
Prpty 52682.0
Commercial Affected 1.0
Industrial Affected 0.0
Residences Affected 0.0
Accident Psig 67.0
Normal Psig 67.0
Mop Psig 99.0
Accident Pressure Pressure Did Not Exceed Maop
Scada In Place Ind No
Accident Identifier Notification From Emergency Responder
Investigation Status No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Other Outside Force Damage
Cause Details Other Outside Force Damage
Outside Force Type Other Outside Force Damage
Osf Other Details Riser After The Insulated Union Broke Due To Snow/ice Load
Preparer Name M***** B*********
Preparer Title Compliance Operations Manager
Preparer Email M**********@n*******.com
Authorizer Name M****** B*********
Authorizer Title Compliance Operations Manager
Authorizer Telephone 508.468.9956
Authorizer Email M**********@n*******.com
Narrative There was a build up of snow and ice on the meter set causing the riser after the insulated union to break resulting in a release of gas. The release of gas ignited resulting in a fire and property damage. Part c subpart 2a & 4 are associated with the service line. The company was unable to determine how the snow build up occurred (I.E. Whether it was associated with natural force or a 3rd party).There was a breakdown in the notification process which resulted in a delayed nrc call being made. The company has since implemented annual training to provide continuous education on the reporting requirements at both a state and federal level.

All rights reserved. Copyright © by ClearPHMSA