HL incident on 2014-11-10 — TX

Operator
Enterprise Products Operating Llc
Cause
Notification Issue
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$97,169
Incident datetime
2014-11-10 11:29
Report number
Location
TX
Narrative
On 11/20/2014 at 11:29 am, the control center was notified there was a possible release near 310th street and eureka avenue in cedar county, iowa. The excavator contacted pipeline control immediately to report the line strike. An enterprise employee arrived on site at 11:43 to confirm that there was a leak at am 7 of the clinton lines via a vapor cloud being present. There are two lines present in this area, an 8" and a 10". Both lines were double isolated. A pressure gauge was used to monitor pressures on both lines to determine that the 8" clinton lateral was hit. An excavator was installing drain tile from north to south and the 8" line was the most northern and was struck. An enterprise incident command post was established west of eureka avenue on 310th street. Roads were blocked by the fire department and law enforcement to restrict access to the leak site. 12 households were temporarily evacuated. To evacuate the line, a flare was set up upstream of the accident site. Continuous flaring occurred until the pipeline could be swept with nitrogen. The plow was removed from the pipe, the damage segment was cut out, and the repairs were made. The pipeline was returned to service on 11/13/2014 at 20:57. An incident investigation was initiated to determine why the excavator was excavating in the vicinity of our pipelines. The excavator had made a one call but the he ventured outside of the one call boundaries; the location of the line strike was not covered by the one call.
Detailed record list
Report Received Date
2014-12-09 00:00:00
Iyear
2014
Report Number
20140414
Supplemental Number
19949
Report Type
Supplemental Final
Operator Id
Name
Enterprise Products Operating Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2014-11-10 11:29:00
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Propane
Unintentional Release Bbls
3216
Intentional Release Bbls
220
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Third Party That Caused The Accident
Incident Identified Datetime
2014-11-10 11:29:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2014-11-10 11:40:00
Restart Datetime
2014-11-13 20:57:00
On Site Datetime
2014-11-10 11:43:00
Nrc Rpt Datetime
2014-11-10 13:20:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
12
Pipe Fac Name
Clinton Lateral
Segment Name
620
Onshore State Abbreviation
Ia
Onshore Postal Code
52358
Onshore City Name
West Branch
Onshore County Name
Cedar County
Designated Location
Milepost/valve Station
Designated Name
Mp 7
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
36
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8
Pipe Wall Thickness
0.188
Pipe Smys
52000
Pipe Specification
Api 5l-X-52
Pipe Seam Type
Erw � Unknown Frequency
Pipe Manufacturer
Bethlehem Steel
Pipe Coating Type
Other
Pipe Coating Details
Polyken Tape Coat
Installation Year
1968
Manufactured Year
1968
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
9
Puncture Circum
3
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
131865
Est Cost Prop Damage
97169
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
508
Est Cost Other Details
Accommodations And Food For Displaced Land Owners
Prpty
229542
Accident Psig
182
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
49205
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
A third party struck the line and called it in immediately.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
Notify Cga Dirt
No
Private Row Ind
Yes
Private Subtype
Private Landowner
Excavator Type
Farmer
Excavator Equipment
Farm Equipment
Work Performed
Drainage
One Call Notified Ind
Yes
One Call Ticket Num
142990183
Locator Type
Utility Owner
Visible Marks
No
Service Interruption
Yes
Service Interruption Hours
81
Root Cause Category
Notification Issue
Root Cause Type
No Notification Made To The One-Call Center/811
Preparer Name
R** L**
Preparer Title
Pipeline Compliance Engineer
Preparer Email
R***@e****.com
Preparer Telephone
713-381-6741
Prepared Date
2014-12-09 00:00:00
Authorizer Name
R** L**
Authorizer Telephone
713-381-6741
Authorizer Title
Pipeline Compliance Engineer
Authorizer Email
R***@e****.com
Narrative
On 11/20/2014 at 11:29 am, the control center was notified there was a possible release near 310th street and eureka avenue in cedar county, iowa. The excavator contacted pipeline control immediately to report the line strike. An enterprise employee arrived on site at 11:43 to confirm that there was a leak at am 7 of the clinton lines via a vapor cloud being present. There are two lines present in this area, an 8" and a 10". Both lines were double isolated. A pressure gauge was used to monitor pressures on both lines to determine that the 8" clinton lateral was hit. An excavator was installing drain tile from north to south and the 8" line was the most northern and was struck. An enterprise incident command post was established west of eureka avenue on 310th street. Roads were blocked by the fire department and law enforcement to restrict access to the leak site. 12 households were temporarily evacuated. To evacuate the line, a flare was set up upstream of the accident site. Continuous flaring occurred until the pipeline could be swept with nitrogen. The plow was removed from the pipe, the damage segment was cut out, and the repairs were made. The pipeline was returned to service on 11/13/2014 at 20:57. An incident investigation was initiated to determine why the excavator was excavating in the vicinity of our pipelines. The excavator had made a one call but the he ventured outside of the one call boundaries; the location of the line strike was not covered by the one call.
Report Received Date 2014-12-09 00:00:00
Iyear 2014
Report Number 20140414
Supplemental Number 19949
Report Type Supplemental Final
Operator Id 31618 PHMSA Enforcement
Name Enterprise Products Operating Llc
Operator Street Address 1100 Louisiana Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2014-11-10 11:29:00
Location Latitude 41.642669 Google Maps OpenStreetMap
Location Longitude -91.284455 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Other Hvl
Commodity Details Propane
Unintentional Release Bbls 3216
Intentional Release Bbls 220
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Notification From Third Party That Caused The Accident
Incident Identified Datetime 2014-11-10 11:29:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2014-11-10 11:40:00
Restart Datetime 2014-11-13 20:57:00
On Site Datetime 2014-11-10 11:43:00
Nrc Rpt Datetime 2014-11-10 13:20:00
Nrc Rpt Num 1100681 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Num Pub Evacuated 12
Pipe Fac Name Clinton Lateral
Segment Name 620
Onshore State Abbreviation Ia
Onshore Postal Code 52358
Onshore City Name West Branch
Onshore County Name Cedar County
Designated Location Milepost/valve Station
Designated Name Mp 7
Federal No
Location Type Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type Underground
Incident Area Subtype Exposed Due To Excavation
Depth Of Cover 36
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 8
Pipe Wall Thickness 0.188
Pipe Smys 52000
Pipe Specification Api 5l-X-52
Pipe Seam Type Erw � Unknown Frequency
Pipe Manufacturer Bethlehem Steel
Pipe Coating Type Other
Pipe Coating Details Polyken Tape Coat
Installation Year 1968
Manufactured Year 1968
Material Involved Carbon Steel
Release Type Mechanical Puncture
Puncture Axial 9
Puncture Circum 3
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 131865
Est Cost Prop Damage 97169
Est Cost Emergency 0
Est Cost Environmental 0
Est Cost Other 508
Est Cost Other Details Accommodations And Food For Displaced Land Owners
Prpty 229542
Accident Psig 182
Mop Psig 1440
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 49205
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind Yes
Cpm Conf Ind Yes
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details A third party struck the line and called it in immediately.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind Yes
One Call System Ind Yes
Notify Cga Dirt No
Private Row Ind Yes
Private Subtype Private Landowner
Excavator Type Farmer
Excavator Equipment Farm Equipment
Work Performed Drainage
One Call Notified Ind Yes
One Call Ticket Num 142990183
Locator Type Utility Owner
Visible Marks No
Service Interruption Yes
Service Interruption Hours 81
Root Cause Category Notification Issue
Root Cause Type No Notification Made To The One-Call Center/811
Preparer Name R** L**
Preparer Title Pipeline Compliance Engineer
Preparer Email R***@e****.com
Preparer Telephone 713-381-6741
Prepared Date 2014-12-09 00:00:00
Authorizer Name R** L**
Authorizer Telephone 713-381-6741
Authorizer Title Pipeline Compliance Engineer
Authorizer Email R***@e****.com
Narrative On 11/20/2014 at 11:29 am, the control center was notified there was a possible release near 310th street and eureka avenue in cedar county, iowa. The excavator contacted pipeline control immediately to report the line strike. An enterprise employee arrived on site at 11:43 to confirm that there was a leak at am 7 of the clinton lines via a vapor cloud being present. There are two lines present in this area, an 8" and a 10". Both lines were double isolated. A pressure gauge was used to monitor pressures on both lines to determine that the 8" clinton lateral was hit. An excavator was installing drain tile from north to south and the 8" line was the most northern and was struck. An enterprise incident command post was established west of eureka avenue on 310th street. Roads were blocked by the fire department and law enforcement to restrict access to the leak site. 12 households were temporarily evacuated. To evacuate the line, a flare was set up upstream of the accident site. Continuous flaring occurred until the pipeline could be swept with nitrogen. The plow was removed from the pipe, the damage segment was cut out, and the repairs were made. The pipeline was returned to service on 11/13/2014 at 20:57. An incident investigation was initiated to determine why the excavator was excavating in the vicinity of our pipelines. The excavator had made a one call but the he ventured outside of the one call boundaries; the location of the line strike was not covered by the one call.