Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2014-11-01 — TX
Operator
Sunoco Pipeline L.p.
Cause
Material Failure Of Pipe Or Weld
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$19,000
Incident datetime
2014-11-01 15:45
Report number
Location
TX
Narrative
On 10/31/2014 the dover to hennessey pipeline was shut down by the control center due to an over/short line imbalance. Air patrol was dispatched, flew the line and reported no visible signs of a release. The line remained shut down overnight. On 11/1/2014 a pressure integrity check of the pipeline was initiated and aborted when the line did not hold pressure. Foot patrol along the line on 11/1/2014 identified and confirmed the point of release. The release site was excavated, the line was purged and the failed section of pipe was cut out and replaced. The line was subsequently successfully hydrostatically pressure tested. The line was placed back into service on 11/7/2014. On january 23, 2015 it was determined that remediation costs would cause total costs to exceed $50,000. Therefore an nrc notification was made per the requirement defined under 195.52(a)(3). Metallurgical analysis revealed that the failure was the result of a pre-existing weld flaw produced in the pipe mill during manufacture.
Detailed record list
Report Received Date
2014-12-01 00:00:00
Iyear
2014
Report Number
20140408
Supplemental Number
20330
Report Type
Supplemental Final
Operator Id
18718
Name
Sunoco Pipeline L.p.
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2014-11-01 15:45:00
Location Latitude
36.04031
Location Longitude
-97.91048
Commodity Released Type
Crude Oil
Unintentional Release Bbls
15
Recovered Bbls
15
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Ground Patrol By Operator Or Its Contractor
Operator Type
Operator Employee
Incident Identified Datetime
2014-11-01 15:45:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2014-11-01 15:45:00
Restart Datetime
2014-11-07 15:00:00
On Site Datetime
2014-11-01 15:45:00
Nrc Rpt Datetime
2015-01-23 10:40:00
Nrc Rpt Num
1106401
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Dover To Hennessey 4"
Segment Name
541003-4" Dover To Hennessey
Onshore State Abbreviation
Ok
Onshore Postal Code
73750
Onshore City Name
Kingfisher
Onshore County Name
Kingfisher
Designated Location
Milepost/valve Station
Designated Name
1
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
48
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Seam
Pipe Diameter
4.5
Pipe Wall Thickness
0.156
Pipe Smys
30000
Pipe Specification
Grade A
Pipe Seam Type
Erw � Unknown Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Coal Tar
Installation Year
Unknown
Manufactured Year
1950
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
21500
Est Cost Gas Released
1000
Est Cost Prop Damage
19000
Est Cost Emergency
2500
Est Cost Environmental
380000
Est Cost Other
0
Prpty
424000
Accident Psig
624
Mop Psig
714
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
28381
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Metallurgical Ind
Yes
Failure Type
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Other Factor
Yes
Other Factor Details
Pre-Existing Weld Flaw In The Pipe Mill During Manufacture.
Additional Crack Ind
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Axial Recent Year
2011
Other Recent Year
2011
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2001
Hydrtst Most Rcnt Pressure
893
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
T*** G* N*******
Preparer Title
Dot Compliance Manager
Preparer Email
T*********@s**************.com
Preparer Telephone
281-637-6576
Preparer Fax
877-917-0448
Prepared Date
2015-04-13 00:00:00
Authorizer Name
T*** G* N*******
Authorizer Telephone
281-637-6576
Authorizer Title
Dot Compliance Manager
Authorizer Email
T*********@s**************.com
Narrative
On 10/31/2014 the dover to hennessey pipeline was shut down by the control center due to an over/short line imbalance. Air patrol was dispatched, flew the line and reported no visible signs of a release. The line remained shut down overnight. On 11/1/2014 a pressure integrity check of the pipeline was initiated and aborted when the line did not hold pressure. Foot patrol along the line on 11/1/2014 identified and confirmed the point of release. The release site was excavated, the line was purged and the failed section of pipe was cut out and replaced. The line was subsequently successfully hydrostatically pressure tested. The line was placed back into service on 11/7/2014. On january 23, 2015 it was determined that remediation costs would cause total costs to exceed $50,000. Therefore an nrc notification was made per the requirement defined under 195.52(a)(3). Metallurgical analysis revealed that the failure was the result of a pre-existing weld flaw produced in the pipe mill during manufacture.
| Report Received Date | 2014-12-01 00:00:00 |
|---|---|
| Iyear | 2014 |
| Report Number | 20140408 |
| Supplemental Number | 20330 |
| Report Type | Supplemental Final |
| Operator Id | 18718 PHMSA Enforcement |
| Name | Sunoco Pipeline L.p. |
| Operator Street Address | 1300 Main Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2014-11-01 15:45:00 |
| Location Latitude | 36.04031 Google Maps OpenStreetMap |
| Location Longitude | -97.91048 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 15 |
| Recovered Bbls | 15 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Ground Patrol By Operator Or Its Contractor |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2014-11-01 15:45:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2014-11-01 15:45:00 |
| Restart Datetime | 2014-11-07 15:00:00 |
| On Site Datetime | 2014-11-01 15:45:00 |
| Nrc Rpt Datetime | 2015-01-23 10:40:00 |
| Nrc Rpt Num | 1106401 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Dover To Hennessey 4" |
| Segment Name | 541003-4" Dover To Hennessey |
| Onshore State Abbreviation | Ok |
| Onshore Postal Code | 73750 |
| Onshore City Name | Kingfisher |
| Onshore County Name | Kingfisher |
| Designated Location | Milepost/valve Station |
| Designated Name | 1 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 48 |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Pipe |
| Pipe Type | Pipe Seam |
| Pipe Diameter | 4.5 |
| Pipe Wall Thickness | 0.156 |
| Pipe Smys | 30000 |
| Pipe Specification | Grade A |
| Pipe Seam Type | Erw � Unknown Frequency |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | Coal Tar |
| Installation Year | Unknown |
| Manufactured Year | 1950 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Crack |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 21500 |
| Est Cost Gas Released | 1000 |
| Est Cost Prop Damage | 19000 |
| Est Cost Emergency | 2500 |
| Est Cost Environmental | 380000 |
| Est Cost Other | 0 |
| Prpty | 424000 |
| Accident Psig | 624 |
| Mop Psig | 714 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 28381 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | A review of the accident determined that there were no control room actions that contributed to the event. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Material Failure Of Pipe Or Weld |
| Cause Details | Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field) |
| Metallurgical Ind | Yes |
| Failure Type | Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field) |
| Other Factor | Yes |
| Other Factor Details | Pre-Existing Weld Flaw In The Pipe Mill During Manufacture. |
| Additional Crack Ind | Yes |
| Collected Data Ind | Yes |
| Axial Magnetic Flx Lkg Ind | Yes |
| Axial Recent Year | 2011 |
| Other Recent Year | 2011 |
| Has Hydrtst Conduc Before Ind | Yes |
| Hydrtst Most Rcnt Year | 2001 |
| Hydrtst Most Rcnt Pressure | 893 |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | T*** G* N******* |
| Preparer Title | Dot Compliance Manager |
| Preparer Email | T*********@s**************.com |
| Preparer Telephone | 281-637-6576 |
| Preparer Fax | 877-917-0448 |
| Prepared Date | 2015-04-13 00:00:00 |
| Authorizer Name | T*** G* N******* |
| Authorizer Telephone | 281-637-6576 |
| Authorizer Title | Dot Compliance Manager |
| Authorizer Email | T*********@s**************.com |
| Narrative | On 10/31/2014 the dover to hennessey pipeline was shut down by the control center due to an over/short line imbalance. Air patrol was dispatched, flew the line and reported no visible signs of a release. The line remained shut down overnight. On 11/1/2014 a pressure integrity check of the pipeline was initiated and aborted when the line did not hold pressure. Foot patrol along the line on 11/1/2014 identified and confirmed the point of release. The release site was excavated, the line was purged and the failed section of pipe was cut out and replaced. The line was subsequently successfully hydrostatically pressure tested. The line was placed back into service on 11/7/2014. On january 23, 2015 it was determined that remediation costs would cause total costs to exceed $50,000. Therefore an nrc notification was made per the requirement defined under 195.52(a)(3). Metallurgical analysis revealed that the failure was the result of a pre-existing weld flaw produced in the pipe mill during manufacture. |