HL incident on 2014-09-30 — TX

Operator
Enterprise Crude Pipeline Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$10,500
Incident datetime
2014-09-30 08:07
Report number
Location
TX
Narrative
Landowner contacted area tech to report a possible leak on the c-18 pipeline. Tech responded to the location and found a stain about 15' in diameter, tech called the control center and had the chico station and pipeline shut down. Soil remediation actions were put in place immediately and pipe was clamped and returned to service. Scheduled outage will be planned to cut out and send the affected pipe for metallurgical analysis. Pipeline segment affected has been replaced and metallurgical analysis came back.
Detailed record list
Report Received Date
2014-10-30 00:00:00
Iyear
2014
Report Number
20140382
Supplemental Number
20958
Report Type
Supplemental Final
Operator Id
Name
Enterprise Crude Pipeline Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2014-09-30 06:56:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
10
Recovered Bbls
10
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
Incident Identified Datetime
2014-09-30 08:07:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2014-09-30 06:56:00
Restart Datetime
2014-09-30 11:49:00
On Site Datetime
2014-09-30 08:07:00
Nrc Rpt Datetime
2014-09-30 11:45:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
C-18
Segment Name
Chico To C26 Junction
Onshore State Abbreviation
Tx
Onshore Postal Code
76431
Onshore City Name
Chico
Onshore County Name
Jack
Designated Location
Milepost/valve Station
Designated Name
See Gps
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
Unknown
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8.625
Pipe Wall Thickness
0.322
Pipe Smys
24000
Pipe Specification
Unknown
Pipe Seam Type
Other
Pipe Seam Details
Unknown
Pipe Manufacturer
Unknown
Pipe Coating Type
Coal Tar
Installation Year
Unknown
Manufactured Year
1940
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
50000
Est Cost Gas Released
0
Est Cost Prop Damage
10500
Est Cost Emergency
250000
Est Cost Environmental
50000
Est Cost Other
200000
Est Cost Other Details
This Is An Estimated Cost. We Will Update As We Incur More Costs.
Prpty
560500
Accident Psig
180
Mop Psig
308
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
80520
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Control room actions did not affect or contribute to accident.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
General Corrosion
Other Corrosion Ind
Yes
Corrosion Type Details
Pipeline Segment To Be Sent For Metallurgical Analysis To Make That Determination.
Metallurgical Basis Ind
Yes
Underground Location
Yes
Under Cathodic Protection Ind
Yes
Cathodic Pro Start Year
2001
Shielding Evident
No
Cathodic Survey Type
Yes
Cp Annual Survey Ind
Yes
Cp Annual Survey Year
2014
Prior Damage
No
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
A***** A*****
Preparer Title
Pipeline Compliance Engineer
Preparer Email
A******@e****.com
Preparer Telephone
713-381-4218
Prepared Date
2015-09-24 00:00:00
Authorizer Name
A***** A*****
Authorizer Telephone
713-381-4218
Authorizer Title
Pipeline Compliance Engineer
Authorizer Email
A******@e****.com
Narrative
Landowner contacted area tech to report a possible leak on the c-18 pipeline. Tech responded to the location and found a stain about 15' in diameter, tech called the control center and had the chico station and pipeline shut down. Soil remediation actions were put in place immediately and pipe was clamped and returned to service. Scheduled outage will be planned to cut out and send the affected pipe for metallurgical analysis. Pipeline segment affected has been replaced and metallurgical analysis came back.
Report Received Date 2014-10-30 00:00:00
Iyear 2014
Report Number 20140382
Supplemental Number 20958
Report Type Supplemental Final
Operator Id 30829 PHMSA Enforcement
Name Enterprise Crude Pipeline Llc
Operator Street Address 1100 Louisiana Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2014-09-30 06:56:00
Location Latitude 33.29701 Google Maps OpenStreetMap
Location Longitude -97.956493 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 10
Recovered Bbls 10
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Notification From Public
Incident Identified Datetime 2014-09-30 08:07:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2014-09-30 06:56:00
Restart Datetime 2014-09-30 11:49:00
On Site Datetime 2014-09-30 08:07:00
Nrc Rpt Datetime 2014-09-30 11:45:00
Nrc Rpt Num 1096917 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name C-18
Segment Name Chico To C26 Junction
Onshore State Abbreviation Tx
Onshore Postal Code 76431
Onshore City Name Chico
Onshore County Name Jack
Designated Location Milepost/valve Station
Designated Name See Gps
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover Unknown
Crossing No
Pipe Facility Type Intrastate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 8.625
Pipe Wall Thickness 0.322
Pipe Smys 24000
Pipe Specification Unknown
Pipe Seam Type Other
Pipe Seam Details Unknown
Pipe Manufacturer Unknown
Pipe Coating Type Coal Tar
Installation Year Unknown
Manufactured Year 1940
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 50000
Est Cost Gas Released 0
Est Cost Prop Damage 10500
Est Cost Emergency 250000
Est Cost Environmental 50000
Est Cost Other 200000
Est Cost Other Details This Is An Estimated Cost. We Will Update As We Incur More Costs.
Prpty 560500
Accident Psig 180
Mop Psig 308
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 80520
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind Yes
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Control room actions did not affect or contribute to accident.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details External Corrosion
Internal External External Corrosion
Visual Exam Results General Corrosion
Other Corrosion Ind Yes
Corrosion Type Details Pipeline Segment To Be Sent For Metallurgical Analysis To Make That Determination.
Metallurgical Basis Ind Yes
Underground Location Yes
Under Cathodic Protection Ind Yes
Cathodic Pro Start Year 2001
Shielding Evident No
Cathodic Survey Type Yes
Cp Annual Survey Ind Yes
Cp Annual Survey Year 2014
Prior Damage No
Collected Data Ind No
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name A***** A*****
Preparer Title Pipeline Compliance Engineer
Preparer Email A******@e****.com
Preparer Telephone 713-381-4218
Prepared Date 2015-09-24 00:00:00
Authorizer Name A***** A*****
Authorizer Telephone 713-381-4218
Authorizer Title Pipeline Compliance Engineer
Authorizer Email A******@e****.com
Narrative Landowner contacted area tech to report a possible leak on the c-18 pipeline. Tech responded to the location and found a stain about 15' in diameter, tech called the control center and had the chico station and pipeline shut down. Soil remediation actions were put in place immediately and pipe was clamped and returned to service. Scheduled outage will be planned to cut out and send the affected pipe for metallurgical analysis. Pipeline segment affected has been replaced and metallurgical analysis came back.