HL incident on 2014-08-29 — TX

Operator
Rose Rock Midstream L.p.
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$200
Incident datetime
2014-08-29 12:35
Report number
Location
TX
Narrative
Vibration from the pd pumps on the discharge piping caused the threads on a 1/2 inch nipple to crack causing a spray leak.
Detailed record list
Report Received Date
2014-09-22 00:00:00
Iyear
2014
Report Number
20140334
Supplemental Number
19910
Report Type
Supplemental Final
Operator Id
Name
Rose Rock Midstream L.p.
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2014-08-29 12:35:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.83
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Incident Identified Datetime
2014-08-29 12:35:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
On Site Datetime
2014-08-29 15:40:00
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Cunningham Station
Onshore State Abbreviation
Ks
Onshore Postal Code
67035
Onshore City Name
Cunningham
Onshore County Name
Kingman
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Pipe Facility Type
Interstate
Item Involved
Other
Item Involved Details
1/2" Threaded Nipple
Release Type
Leak
Leak Type
Crack
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
100
Est Cost Prop Damage
200
Est Cost Emergency
100
Est Cost Environmental
0
Est Cost Other
0
Prpty
400
Pipeline Function
< 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Threaded Connection/coupling Failure
Eq Failure Type
Threaded Connection/coupling Failure
Preparer Name
R**** S******
Preparer Title
District Manager
Preparer Email
R*******@s***********.com
Preparer Telephone
620-474-6190
Preparer Fax
620-239-5388
Prepared Date
2014-11-17 00:00:00
Authorizer Name
T*** A*******
Authorizer Telephone
918-524-8109
Authorizer Title
Dot Compliance Specialist Sr
Authorizer Email
T********@s***********.com
Narrative
Vibration from the pd pumps on the discharge piping caused the threads on a 1/2 inch nipple to crack causing a spray leak.
Report Received Date 2014-09-22 00:00:00
Iyear 2014
Report Number 20140334
Supplemental Number 19910
Report Type Supplemental Final
Operator Id 31476 PHMSA Enforcement
Name Rose Rock Midstream L.p.
Operator Street Address 1300 Main Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2014-08-29 12:35:00
Location Latitude 37.67502 Google Maps OpenStreetMap
Location Longitude -98.44337 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 0.83
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Incident Identified Datetime 2014-08-29 12:35:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
On Site Datetime 2014-08-29 15:40:00
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Cunningham Station
Onshore State Abbreviation Ks
Onshore Postal Code 67035
Onshore City Name Cunningham
Onshore County Name Kingman
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Pipe Facility Type Interstate
Item Involved Other
Item Involved Details 1/2" Threaded Nipple
Release Type Leak
Leak Type Crack
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
Usa Drinking Ind Yes
Usa Drinking Yes No Yes
Usa Ecological Ind Yes
Usa Ecological Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 100
Est Cost Prop Damage 200
Est Cost Emergency 100
Est Cost Environmental 0
Est Cost Other 0
Prpty 400
Pipeline Function < 20% Smys Regulated Transmission
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Threaded Connection/coupling Failure
Eq Failure Type Threaded Connection/coupling Failure
Preparer Name R**** S******
Preparer Title District Manager
Preparer Email R*******@s***********.com
Preparer Telephone 620-474-6190
Preparer Fax 620-239-5388
Prepared Date 2014-11-17 00:00:00
Authorizer Name T*** A*******
Authorizer Telephone 918-524-8109
Authorizer Title Dot Compliance Specialist Sr
Authorizer Email T********@s***********.com
Narrative Vibration from the pd pumps on the discharge piping caused the threads on a 1/2 inch nipple to crack causing a spray leak.

All rights reserved. Copyright © by ClearPHMSA