HL incident on 2014-08-22 — TX
Operator
Phillips 66 Pipeline Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$2,000
Incident datetime
2014-08-22 13:00
Report number
Location
TX
Narrative
Operator was making an operator round and found oil in the bottom of a recently hydro excavated ditch in manifold area. Source was determined to be a 2" sump line. A 4' section of the 2" line was replaced and added to the facility routine flushing plan to prevent reocurrence. 2015-5-11 updated mutiple sections in order to provide phsma requested information in part g concerning cause.
Detailed record list
Report Received Date
2014-09-17 00:00:00
Iyear
2014
Report Number
20140325
Supplemental Number
20462
Report Type
Supplemental Final
Operator Id
31684
Name
Phillips 66 Pipeline Llc
Operator Street Address
2331 Citywest Blvd
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77042
Local Datetime
2014-08-22 13:00:00
Location Latitude
35.943703
Location Longitude
-96.754623
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.17
Recovered Bbls
0.17
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2014-08-22 13:00:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Release Occurred On Auxiliary Piping
On Site Datetime
2014-08-22 13:00:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Cushing Terminal Aux. Piping
Segment Name
2" Sump Line
Onshore State Abbreviation
Ok
Onshore Postal Code
74023
Onshore City Name
Cushing
Onshore County Name
Payne
Designated Location
Milepost/valve Station
Designated Name
Cushing Termi
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
24
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Auxiliary Piping (E.g. Drain Lines)
Installation Year
1976
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
20
Est Cost Prop Damage
2000
Est Cost Emergency
0
Est Cost Environmental
500
Est Cost Other
0
Prpty
2520
Accident Psig
20
Mop Psig
275
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Volume and leak rate undetectable by scada on this sump line.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Microbiological Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
No
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Preparer Name
J*** B*********
Preparer Title
Dot Coordinator
Preparer Email
J**************@p**.com
Preparer Telephone
918-977-4206
Prepared Date
2015-05-19 00:00:00
Authorizer Name
T*** T*****
Authorizer Telephone
832-765-1636
Authorizer Title
Regulatory Compliance Manager
Authorizer Email
T************@p**.com
Narrative
Operator was making an operator round and found oil in the bottom of a recently hydro excavated ditch in manifold area. Source was determined to be a 2" sump line. A 4' section of the 2" line was replaced and added to the facility routine flushing plan to prevent reocurrence. 2015-5-11 updated mutiple sections in order to provide phsma requested information in part g concerning cause.
| Report Received Date | 2014-09-17 00:00:00 |
|---|---|
| Iyear | 2014 |
| Report Number | 20140325 |
| Supplemental Number | 20462 |
| Report Type | Supplemental Final |
| Operator Id | 31684 PHMSA Enforcement |
| Name | Phillips 66 Pipeline Llc |
| Operator Street Address | 2331 Citywest Blvd |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77042 |
| Local Datetime | 2014-08-22 13:00:00 |
| Location Latitude | 35.943703 Google Maps OpenStreetMap |
| Location Longitude | -96.754623 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 0.17 |
| Recovered Bbls | 0.17 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2014-08-22 13:00:00 |
| System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Release Occurred On Auxiliary Piping |
| On Site Datetime | 2014-08-22 13:00:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Cushing Terminal Aux. Piping |
| Segment Name | 2" Sump Line |
| Onshore State Abbreviation | Ok |
| Onshore Postal Code | 74023 |
| Onshore City Name | Cushing |
| Onshore County Name | Payne |
| Designated Location | Milepost/valve Station |
| Designated Name | Cushing Termi |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 24 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Auxiliary Piping (E.g. Drain Lines) |
| Installation Year | 1976 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 20 |
| Est Cost Prop Damage | 2000 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 500 |
| Est Cost Other | 0 |
| Prpty | 2520 |
| Accident Psig | 20 |
| Mop Psig | 275 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Volume and leak rate undetectable by scada on this sump line. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | Internal Corrosion |
| Internal External | Internal Corrosion |
| Int Visual Exam Results | Localized Pitting |
| Int Microbiological Ind | Yes |
| Int Field Exam Basis Ind | Yes |
| Int Low Point Pipe Loc Ind | Yes |
| Corrosion Inhibitors | No |
| Corrosion Lining | No |
| Cleaning Dewatering | Not Applicable - Not Mainline Pipe |
| Corrosion Coupons | Not Applicable - Not Mainline Pipe |
| Preparer Name | J*** B********* |
| Preparer Title | Dot Coordinator |
| Preparer Email | J**************@p**.com |
| Preparer Telephone | 918-977-4206 |
| Prepared Date | 2015-05-19 00:00:00 |
| Authorizer Name | T*** T***** |
| Authorizer Telephone | 832-765-1636 |
| Authorizer Title | Regulatory Compliance Manager |
| Authorizer Email | T************@p**.com |
| Narrative | Operator was making an operator round and found oil in the bottom of a recently hydro excavated ditch in manifold area. Source was determined to be a 2" sump line. A 4' section of the 2" line was replaced and added to the facility routine flushing plan to prevent reocurrence. 2015-5-11 updated mutiple sections in order to provide phsma requested information in part g concerning cause. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA