HL incident on 2014-07-01 — OK
Operator
Chaparral Energy, Llc
Cause
Corrosion Failure
Commodity
Co2 (Carbon Dioxide)
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$10,000
Incident datetime
2014-07-01 09:49
Report number
Location
OK
Narrative
On tuesday, july 1, 2014 a landowner notified chaparral energy of a possible problem with its pipeline on his property. A chaparral energy employee arrived on site and determined that we may have a release. Chaparral energy's emergency response plan was activated. Thw pipeline was shutdown and purged between mlv1 and mlv2. After excavating down to the pipeline a small pin hole was discovered. Approximately 8 feet of pipe was replaced with pre-tested pipe. The pipeline was restarted. The removed section was taken to a third party testing lab. Chaparral energy has not received a report from the testing lab as of this date. The final report from the testing lab has been received and the lab verified that the cause of this accident was external corrosion.
Detailed record list
Report Received Date
2014-07-30 00:00:00
Iyear
2014
Report Number
20140274
Supplemental Number
19836
Report Type
Supplemental Final
Operator Id
31672
Name
Chaparral Energy, Llc
Operator Street Address
701 Cedar Lake Blvd
Operator City Name
Oklahoma City
Operator State Abbreviation
OK
Operator Postal Code
73114
Local Datetime
2014-07-01 09:49:00
Location Latitude
35.983
Location Longitude
-101.409
Commodity Released Type
Co2 (Carbon Dioxide)
Unintentional Release Bbls
1
Intentional Release Bbls
3693
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Incident Identified Datetime
2014-07-01 09:49:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2014-07-01 10:00:00
Restart Datetime
2014-07-03 14:00:00
On Site Datetime
2014-07-01 09:49:00
Nrc Rpt Datetime
2014-07-01 10:38:00
Nrc Rpt Num
1087668
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Chaparral Co2
Segment Name
Borger Co2 Pipeline
Onshore State Abbreviation
Tx
Onshore Postal Code
79083
Onshore City Name
Stinnett
Onshore County Name
Hutchinson
Designated Location
Milepost/valve Station
Designated Name
25
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Release Type
Leak
Leak Type
Pinhole
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
1000
Est Cost Prop Damage
10000
Est Cost Emergency
5000
Est Cost Environmental
0
Est Cost Other
0
Prpty
16000
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Preparer Name
D** H*****
Preparer Title
Pipeline Compliance Manager
Preparer Email
D*********@c**************.com
Preparer Telephone
405-255-6581
Preparer Fax
405-425-8476
Prepared Date
2014-10-28 00:00:00
Authorizer Name
K**** W****
Authorizer Telephone
405-426-6619
Authorizer Title
Esh Sr Director
Authorizer Email
K**********@c**************.com
Narrative
On tuesday, july 1, 2014 a landowner notified chaparral energy of a possible problem with its pipeline on his property. A chaparral energy employee arrived on site and determined that we may have a release. Chaparral energy's emergency response plan was activated. Thw pipeline was shutdown and purged between mlv1 and mlv2. After excavating down to the pipeline a small pin hole was discovered. Approximately 8 feet of pipe was replaced with pre-tested pipe. The pipeline was restarted. The removed section was taken to a third party testing lab. Chaparral energy has not received a report from the testing lab as of this date. The final report from the testing lab has been received and the lab verified that the cause of this accident was external corrosion.
| Report Received Date | 2014-07-30 00:00:00 |
|---|---|
| Iyear | 2014 |
| Report Number | 20140274 |
| Supplemental Number | 19836 |
| Report Type | Supplemental Final |
| Operator Id | 31672 PHMSA Enforcement |
| Name | Chaparral Energy, Llc |
| Operator Street Address | 701 Cedar Lake Blvd |
| Operator City Name | Oklahoma City |
| Operator State Abbreviation | OK |
| Operator Postal Code | 73114 |
| Local Datetime | 2014-07-01 09:49:00 |
| Location Latitude | 35.983 Google Maps OpenStreetMap |
| Location Longitude | -101.409 Google Maps OpenStreetMap |
| Commodity Released Type | Co2 (Carbon Dioxide) |
| Unintentional Release Bbls | 1 |
| Intentional Release Bbls | 3693 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Incident Identified Datetime | 2014-07-01 09:49:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2014-07-01 10:00:00 |
| Restart Datetime | 2014-07-03 14:00:00 |
| On Site Datetime | 2014-07-01 09:49:00 |
| Nrc Rpt Datetime | 2014-07-01 10:38:00 |
| Nrc Rpt Num | 1087668 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Chaparral Co2 |
| Segment Name | Borger Co2 Pipeline |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 79083 |
| Onshore City Name | Stinnett |
| Onshore County Name | Hutchinson |
| Designated Location | Milepost/valve Station |
| Designated Name | 25 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Release Type | Leak |
| Leak Type | Pinhole |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 1000 |
| Est Cost Prop Damage | 10000 |
| Est Cost Emergency | 5000 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 16000 |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | External Corrosion |
| Internal External | External Corrosion |
| Preparer Name | D** H***** |
| Preparer Title | Pipeline Compliance Manager |
| Preparer Email | D*********@c**************.com |
| Preparer Telephone | 405-255-6581 |
| Preparer Fax | 405-425-8476 |
| Prepared Date | 2014-10-28 00:00:00 |
| Authorizer Name | K**** W**** |
| Authorizer Telephone | 405-426-6619 |
| Authorizer Title | Esh Sr Director |
| Authorizer Email | K**********@c**************.com |
| Narrative | On tuesday, july 1, 2014 a landowner notified chaparral energy of a possible problem with its pipeline on his property. A chaparral energy employee arrived on site and determined that we may have a release. Chaparral energy's emergency response plan was activated. Thw pipeline was shutdown and purged between mlv1 and mlv2. After excavating down to the pipeline a small pin hole was discovered. Approximately 8 feet of pipe was replaced with pre-tested pipe. The pipeline was restarted. The removed section was taken to a third party testing lab. Chaparral energy has not received a report from the testing lab as of this date. The final report from the testing lab has been received and the lab verified that the cause of this accident was external corrosion. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA