Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2014-05-28 — OH
Operator
Marathon Pipe Line Llc
Cause
Natural Force Damage
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$41,000
Incident datetime
2014-05-28 19:00
Report number
Location
OH
Narrative
The roof drain was closed per procedure when the rain started at approximately 1-1:30am. At 4:30am, the roof drain was opened but there was already a large amount of water on the roof due to record rainfall. Ultimately the roof drain could not catch up with the collected water and the water continued to build up on the roof weighing it down. The weight of the roof allowed product to be displaced onto the roof through the leg sleeves causing oil to be released thru the roof drain, no repairs were necessary. The tank was returned to service.
Detailed record list
Report Received Date
2014-06-20 00:00:00
Iyear
2014
Report Number
20140242
Supplemental Number
19869
Report Type
Supplemental Final
Operator Id
32147
Name
Marathon Pipe Line Llc
Operator Street Address
539 South Main Street
Operator City Name
Findlay
Operator State Abbreviation
OH
Operator Postal Code
45840
Local Datetime
2014-05-28 19:00:00
Location Latitude
30.01177
Location Longitude
-90.857704
Commodity Released Type
Crude Oil
Unintentional Release Bbls
84
Recovered Bbls
84
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2014-05-28 19:00:00
System Part Involved
Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
The Line Was Shutdown Due To Widespread Power Failure In The Area.
On Site Datetime
2014-05-28 19:00:00
Nrc Rpt Datetime
2014-05-30 10:13:00
Nrc Rpt Num
1084368
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
St. James Capline
Segment Name
Capline System
Onshore State Abbreviation
La
Onshore Postal Code
70086
Onshore City Name
St. James
Onshore County Name
St. James
Designated Location
Milepost/valve Station
Designated Name
0+00
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Tank, Including Attached Appurtenances
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Tank/vessel
Tank Vessel Subtype
Roof Drain System
Tank Type
Atmospheric
Installation Year
1974
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
Roof Drain Overcome By Rain
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
400
Est Cost Prop Damage
41000
Est Cost Emergency
166000
Est Cost Environmental
0
Est Cost Other
0
Prpty
207400
Accident Psig
0
Mop Psig
0
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Natural Force Damage
Cause Details
Heavy Rains/floods
Natural Force Type
Heavy Rains/floods
Heavy Rains Subtype
Other
Nf Other Details
Heavy Rains Overcame The Roof Drain Causing Water To Build Up On Tank Roof. The Weight Of The Water On The Tank Roof Forced Crude Oil Out Through The Tank Roof Appurtenances Such As Leg Sleeves. The Crude Oil Then Flowed Out Of The Roof Drain Into Dike Containment.
Nf Extreme Weather Ind
No
Preparer Name
R**** H********
Preparer Title
Hes Professional
Preparer Email
R**********@m****************.com
Preparer Telephone
419-421-2121
Prepared Date
2014-11-03 00:00:00
Authorizer Name
R****** W* B*****
Authorizer Telephone
419-421-2121
Authorizer Title
Regulatory Compliance Manager
Authorizer Email
R*******@m****************.com
Narrative
The roof drain was closed per procedure when the rain started at approximately 1-1:30am. At 4:30am, the roof drain was opened but there was already a large amount of water on the roof due to record rainfall. Ultimately the roof drain could not catch up with the collected water and the water continued to build up on the roof weighing it down. The weight of the roof allowed product to be displaced onto the roof through the leg sleeves causing oil to be released thru the roof drain, no repairs were necessary. The tank was returned to service.
| Report Received Date | 2014-06-20 00:00:00 |
|---|---|
| Iyear | 2014 |
| Report Number | 20140242 |
| Supplemental Number | 19869 |
| Report Type | Supplemental Final |
| Operator Id | 32147 PHMSA Enforcement |
| Name | Marathon Pipe Line Llc |
| Operator Street Address | 539 South Main Street |
| Operator City Name | Findlay |
| Operator State Abbreviation | OH |
| Operator Postal Code | 45840 |
| Local Datetime | 2014-05-28 19:00:00 |
| Location Latitude | 30.01177 Google Maps OpenStreetMap |
| Location Longitude | -90.857704 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 84 |
| Recovered Bbls | 84 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2014-05-28 19:00:00 |
| System Part Involved | Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | The Line Was Shutdown Due To Widespread Power Failure In The Area. |
| On Site Datetime | 2014-05-28 19:00:00 |
| Nrc Rpt Datetime | 2014-05-30 10:13:00 |
| Nrc Rpt Num | 1084368 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | St. James Capline |
| Segment Name | Capline System |
| Onshore State Abbreviation | La |
| Onshore Postal Code | 70086 |
| Onshore City Name | St. James |
| Onshore County Name | St. James |
| Designated Location | Milepost/valve Station |
| Designated Name | 0+00 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Tank, Including Attached Appurtenances |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Tank/vessel |
| Tank Vessel Subtype | Roof Drain System |
| Tank Type | Atmospheric |
| Installation Year | 1974 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Other |
| Leak Type Other | Roof Drain Overcome By Rain |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Other Pop Ind | Yes |
| Other Pop Yes No | Yes |
| Usa Drinking Ind | Yes |
| Usa Drinking Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 400 |
| Est Cost Prop Damage | 41000 |
| Est Cost Emergency | 166000 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 207400 |
| Accident Psig | 0 |
| Mop Psig | 0 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Natural Force Damage |
| Cause Details | Heavy Rains/floods |
| Natural Force Type | Heavy Rains/floods |
| Heavy Rains Subtype | Other |
| Nf Other Details | Heavy Rains Overcame The Roof Drain Causing Water To Build Up On Tank Roof. The Weight Of The Water On The Tank Roof Forced Crude Oil Out Through The Tank Roof Appurtenances Such As Leg Sleeves. The Crude Oil Then Flowed Out Of The Roof Drain Into Dike Containment. |
| Nf Extreme Weather Ind | No |
| Preparer Name | R**** H******** |
| Preparer Title | Hes Professional |
| Preparer Email | R**********@m****************.com |
| Preparer Telephone | 419-421-2121 |
| Prepared Date | 2014-11-03 00:00:00 |
| Authorizer Name | R****** W* B***** |
| Authorizer Telephone | 419-421-2121 |
| Authorizer Title | Regulatory Compliance Manager |
| Authorizer Email | R*******@m****************.com |
| Narrative | The roof drain was closed per procedure when the rain started at approximately 1-1:30am. At 4:30am, the roof drain was opened but there was already a large amount of water on the roof due to record rainfall. Ultimately the roof drain could not catch up with the collected water and the water continued to build up on the roof weighing it down. The weight of the roof allowed product to be displaced onto the roof through the leg sleeves causing oil to be released thru the roof drain, no repairs were necessary. The tank was returned to service. |