HL incident on 2014-04-25 — TX
Operator
Delek Logistics Operating, Llc.
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$35,000
Incident datetime
2014-04-25 10:45
Report number
Location
TX
Narrative
At approximately 10:45 am on the morning of april 25, 2014, ariel patrol called glenn green to report a possible leak on the colquitt gathering right-of-way. Glenn green immediately dispatched local field personnel and maitnenance crews to the scene to verify the possible leak and location. Once field personnel and maintenance crews arrived on scene all pumps where shutdown on the system and mainline valves closed. Delek's third party osro was contacted and dispatched to the scene with emergency response equipment, personnel and resources. Supplement: anderson & associates lab analysis was completed and a copy received on june 11, 2014 indicating microbiologically influenced corrosion was the most likely cause. The report has been emailed to southwest region. Pipeline is still out of service pending ili run as of june 30, 2014. Supplement 5 january 2015: received final ili report from tdw on december 16, 2014. Pipeline still out of service. Evaluating financial feasibilty of repairing & restarting line.
Detailed record list
Report Received Date
2014-05-23 00:00:00
Iyear
2014
Report Number
20140202
Supplemental Number
20024
Report Type
Supplemental
Operator Id
11551
Name
Delek Logistics Operating, Llc.
Operator Street Address
5850 Granite Parkway #450
Operator City Name
Plano
Operator State Abbreviation
TX
Operator Postal Code
75024
Local Datetime
2014-04-25 10:45:00
Location Latitude
32.97035
Location Longitude
-92.93675
Commodity Released Type
Crude Oil
Unintentional Release Bbls
400
Recovered Bbls
223
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Air Patrol
Operator Type
Operator Employee
Incident Identified Datetime
2014-04-25 10:45:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2014-04-25 10:45:00
Still Shutdown Ind
Yes
On Site Datetime
2014-04-25 11:00:00
Nrc Rpt Datetime
2014-04-25 11:41:00
Nrc Rpt Num
1080818
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Pipe Fac Name
Colquitt Gathering
Segment Name
2202
Onshore State Abbreviation
La
Onshore Postal Code
71038
Onshore City Name
Haynesville
Onshore County Name
Claiborne
Designated Location
Survey Station No.
Designated Name
60+50
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
18
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8.625
Pipe Wall Thickness
0.322
Pipe Smys
35000
Pipe Specification
Api 5l B
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Asphalt
Installation Year
1990
Manufactured Year
1990
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
Yes
Birds Impact Ind
Yes
Terrestrial Impact Ind
Yes
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Vegetation Remed Ind
Yes
Wildlife Remed Ind
Yes
Water Contam Ind
Yes
Surface Contam Ind
Yes
Amount Released
300
Rel Water Name
No Name Dry Drainage Ditch That Discharges Into No Name Creek That Evetually Feeds Doe Branch. No Sign Of Oil Reaching Doe Branch. Doe Branch Is A Tributary Of Cornie Bayou.
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
50000
Est Cost Gas Released
6545
Est Cost Prop Damage
35000
Est Cost Emergency
2500000
Est Cost Environmental
500000
Est Cost Other
250000
Est Cost Other Details
Improve Row Access & Parish Road Repairs
Prpty
3341545
Accident Psig
50
Mop Psig
720
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
24548
Internal Inspection Ind
Yes
Operation Complications Ind
Yes
Low Flow Ind
Yes
Pipeline Function
=< 20% Smys Regulated Gathering
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Microbiological Ind
Yes
Int Field Exam Basis Ind
Yes
Int Metallurgical Basis Ind
Yes
Int Other Loc Ind
Yes
Corrosion Location Details
Pit Located At Approximately 4:00 Clock Position In An Underbend For The Drainage Ditch
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Yes
Corrosion Coupons
Yes
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2003
Hydrtst Most Rcnt Pressure
900
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
G**** R* G****
Preparer Title
Maintenance Engineering Superintendent
Preparer Email
G**********@l******.com
Preparer Telephone
870-864-1372
Preparer Fax
870-864-1341
Prepared Date
2015-01-05 00:00:00
Authorizer Name
G**** R* G****
Authorizer Telephone
870-864-1372
Authorizer Title
Maintenance Engineering Superintendent
Authorizer Email
G**********@l******.com
Narrative
At approximately 10:45 am on the morning of april 25, 2014, ariel patrol called glenn green to report a possible leak on the colquitt gathering right-of-way. Glenn green immediately dispatched local field personnel and maitnenance crews to the scene to verify the possible leak and location. Once field personnel and maintenance crews arrived on scene all pumps where shutdown on the system and mainline valves closed. Delek's third party osro was contacted and dispatched to the scene with emergency response equipment, personnel and resources. Supplement: anderson & associates lab analysis was completed and a copy received on june 11, 2014 indicating microbiologically influenced corrosion was the most likely cause. The report has been emailed to southwest region. Pipeline is still out of service pending ili run as of june 30, 2014. Supplement 5 january 2015: received final ili report from tdw on december 16, 2014. Pipeline still out of service. Evaluating financial feasibilty of repairing & restarting line.
| Report Received Date | 2014-05-23 00:00:00 |
|---|---|
| Iyear | 2014 |
| Report Number | 20140202 |
| Supplemental Number | 20024 |
| Report Type | Supplemental |
| Operator Id | 11551 PHMSA Enforcement |
| Name | Delek Logistics Operating, Llc. |
| Operator Street Address | 5850 Granite Parkway #450 |
| Operator City Name | Plano |
| Operator State Abbreviation | TX |
| Operator Postal Code | 75024 |
| Local Datetime | 2014-04-25 10:45:00 |
| Location Latitude | 32.97035 Google Maps OpenStreetMap |
| Location Longitude | -92.93675 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 400 |
| Recovered Bbls | 223 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Air Patrol |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2014-04-25 10:45:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2014-04-25 10:45:00 |
| Still Shutdown Ind | Yes |
| On Site Datetime | 2014-04-25 11:00:00 |
| Nrc Rpt Datetime | 2014-04-25 11:41:00 |
| Nrc Rpt Num | 1080818 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Pipe Fac Name | Colquitt Gathering |
| Segment Name | 2202 |
| Onshore State Abbreviation | La |
| Onshore Postal Code | 71038 |
| Onshore City Name | Haynesville |
| Onshore County Name | Claiborne |
| Designated Location | Survey Station No. |
| Designated Name | 60+50 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 18 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 8.625 |
| Pipe Wall Thickness | 0.322 |
| Pipe Smys | 35000 |
| Pipe Specification | Api 5l B |
| Pipe Seam Type | Erw - High Frequency |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | Asphalt |
| Installation Year | 1990 |
| Manufactured Year | 1990 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | Yes |
| Birds Impact Ind | Yes |
| Terrestrial Impact Ind | Yes |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Vegetation Remed Ind | Yes |
| Wildlife Remed Ind | Yes |
| Water Contam Ind | Yes |
| Surface Contam Ind | Yes |
| Amount Released | 300 |
| Rel Water Name | No Name Dry Drainage Ditch That Discharges Into No Name Creek That Evetually Feeds Doe Branch. No Sign Of Oil Reaching Doe Branch. Doe Branch Is A Tributary Of Cornie Bayou. |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 50000 |
| Est Cost Gas Released | 6545 |
| Est Cost Prop Damage | 35000 |
| Est Cost Emergency | 2500000 |
| Est Cost Environmental | 500000 |
| Est Cost Other | 250000 |
| Est Cost Other Details | Improve Row Access & Parish Road Repairs |
| Prpty | 3341545 |
| Accident Psig | 50 |
| Mop Psig | 720 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 24548 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | Yes |
| Low Flow Ind | Yes |
| Pipeline Function | =< 20% Smys Regulated Gathering |
| Scada In Place Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the facility was not monitored by a controller(s) at the time of the accident |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | Internal Corrosion |
| Internal External | Internal Corrosion |
| Int Visual Exam Results | Localized Pitting |
| Int Microbiological Ind | Yes |
| Int Field Exam Basis Ind | Yes |
| Int Metallurgical Basis Ind | Yes |
| Int Other Loc Ind | Yes |
| Corrosion Location Details | Pit Located At Approximately 4:00 Clock Position In An Underbend For The Drainage Ditch |
| Corrosion Inhibitors | Yes |
| Corrosion Lining | No |
| Cleaning Dewatering | Yes |
| Corrosion Coupons | Yes |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | Yes |
| Hydrtst Most Rcnt Year | 2003 |
| Hydrtst Most Rcnt Pressure | 900 |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | G**** R* G**** |
| Preparer Title | Maintenance Engineering Superintendent |
| Preparer Email | G**********@l******.com |
| Preparer Telephone | 870-864-1372 |
| Preparer Fax | 870-864-1341 |
| Prepared Date | 2015-01-05 00:00:00 |
| Authorizer Name | G**** R* G**** |
| Authorizer Telephone | 870-864-1372 |
| Authorizer Title | Maintenance Engineering Superintendent |
| Authorizer Email | G**********@l******.com |
| Narrative | At approximately 10:45 am on the morning of april 25, 2014, ariel patrol called glenn green to report a possible leak on the colquitt gathering right-of-way. Glenn green immediately dispatched local field personnel and maitnenance crews to the scene to verify the possible leak and location. Once field personnel and maintenance crews arrived on scene all pumps where shutdown on the system and mainline valves closed. Delek's third party osro was contacted and dispatched to the scene with emergency response equipment, personnel and resources. Supplement: anderson & associates lab analysis was completed and a copy received on june 11, 2014 indicating microbiologically influenced corrosion was the most likely cause. The report has been emailed to southwest region. Pipeline is still out of service pending ili run as of june 30, 2014. Supplement 5 january 2015: received final ili report from tdw on december 16, 2014. Pipeline still out of service. Evaluating financial feasibilty of repairing & restarting line. |