Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2014-04-03 — TX
Operator
Phillips 66 Pipeline Llc
Cause
Equipment Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$5,000
Incident datetime
2014-04-03 07:30
Report number
Location
TX
Narrative
Operator personel discoverd a small release occurring through the valve stem weep hole on bl-02 during routine operator rounds. Valve postition was immediately adjusted slightly into a position in which stopped the release. Valve manufacturer was consulted and the valve stem was repacked per manufacturer specifications.
Detailed record list
Report Received Date
2014-04-21 00:00:00
Iyear
2014
Report Number
20140157
Supplemental Number
19286
Report Type
Original Final
Operator Id
31684
Name
Phillips 66 Pipeline Llc
Operator Street Address
2331 Citywest Blvd
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77042
Local Datetime
2014-04-03 07:30:00
Location Latitude
38.581933
Location Longitude
-90.188644
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Butane
Unintentional Release Bbls
0.19
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Incident Identified Datetime
2014-04-03 07:30:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Line Was Already Shutdown For Normal Operations.
On Site Datetime
2014-04-03 07:30:00
Ignite Ind
No
Explode Ind
No
Pipe Fac Name
Bl-02
Segment Name
Villa Ridge To E. St. Louis
Onshore State Abbreviation
Il
Onshore Postal Code
62206
Onshore City Name
Cahokia
Onshore County Name
St. Clair
Designated Location
Milepost/valve Station
Designated Name
E. St. Louis
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Mainline
Release Type
Leak
Leak Type
Seal Or Packing
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
33
Est Cost Prop Damage
5000
Est Cost Emergency
500
Est Cost Environmental
0
Est Cost Other
0
Prpty
5533
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Preparer Name
J*** B*********
Preparer Title
Dot Coordinator
Preparer Email
J**************@p**.com
Preparer Telephone
918-977-4206
Prepared Date
2014-04-17 00:00:00
Authorizer Name
T*** T*****
Authorizer Telephone
832-765-1636
Authorizer Title
Regulatory Compliance Manager
Authorizer Email
T************@p**.com
Narrative
Operator personel discoverd a small release occurring through the valve stem weep hole on bl-02 during routine operator rounds. Valve postition was immediately adjusted slightly into a position in which stopped the release. Valve manufacturer was consulted and the valve stem was repacked per manufacturer specifications.
| Report Received Date | 2014-04-21 00:00:00 |
|---|---|
| Iyear | 2014 |
| Report Number | 20140157 |
| Supplemental Number | 19286 |
| Report Type | Original Final |
| Operator Id | 31684 PHMSA Enforcement |
| Name | Phillips 66 Pipeline Llc |
| Operator Street Address | 2331 Citywest Blvd |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77042 |
| Local Datetime | 2014-04-03 07:30:00 |
| Location Latitude | 38.581933 Google Maps OpenStreetMap |
| Location Longitude | -90.188644 Google Maps OpenStreetMap |
| Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
| Commodity Subtype | Other Hvl |
| Commodity Details | Butane |
| Unintentional Release Bbls | 0.19 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Incident Identified Datetime | 2014-04-03 07:30:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Line Was Already Shutdown For Normal Operations. |
| On Site Datetime | 2014-04-03 07:30:00 |
| Ignite Ind | No |
| Explode Ind | No |
| Pipe Fac Name | Bl-02 |
| Segment Name | Villa Ridge To E. St. Louis |
| Onshore State Abbreviation | Il |
| Onshore Postal Code | 62206 |
| Onshore City Name | Cahokia |
| Onshore County Name | St. Clair |
| Designated Location | Milepost/valve Station |
| Designated Name | E. St. Louis |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Pipe Facility Type | Interstate |
| Item Involved | Valve |
| Valve Type | Mainline |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 33 |
| Est Cost Prop Damage | 5000 |
| Est Cost Emergency | 500 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 5533 |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Malfunction Of Control/relief Equipment |
| Eq Failure Type | Malfunction Of Control/relief Equipment |
| Preparer Name | J*** B********* |
| Preparer Title | Dot Coordinator |
| Preparer Email | J**************@p**.com |
| Preparer Telephone | 918-977-4206 |
| Prepared Date | 2014-04-17 00:00:00 |
| Authorizer Name | T*** T***** |
| Authorizer Telephone | 832-765-1636 |
| Authorizer Title | Regulatory Compliance Manager |
| Authorizer Email | T************@p**.com |
| Narrative | Operator personel discoverd a small release occurring through the valve stem weep hole on bl-02 during routine operator rounds. Valve postition was immediately adjusted slightly into a position in which stopped the release. Valve manufacturer was consulted and the valve stem was repacked per manufacturer specifications. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA