GTG incident on 2014-10-06 — TX
Operator
Energy Transfer Company
Cause
Corrosion Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$35,000
Incident datetime
2014-10-06 16:58
Report number
Location
TX
Narrative
On october 6, 2014, at approximately 4:58 pm energy transfer company (etc) confirmed a release on the wise jack county extension, 8" in wise county, near chico, texas. The pipeline is an intrastate natural gas transmission pipeline located in a rural area (class 1), under the jurisdiction of the texas railroad commission (system id# 630262). The incident was reported to the trrc and also to the nrc under id: 1097551. There were no fatalities, injuries, evacuations, road closures, explosions, fire, media interest, spills or any response by an emergency official. The nearest structure intended for human occupancy is 0.25 miles from the incident site. At 3:31 pm, etc gas control received notification from a targa- chico plant employee that there was a possible line rupture south of their facility. Pressure indicated a leak and upstream targa automatic valve was closed at 3:40 pm. At 4:22 pm, etc bvs15 was closed downstream. This isolated the site of the possible rupture to allow further evaluation. At 4:58 pm, etc employees arrived on scene of the rupture and confirmed that the leak was on the chico 8" pipeline and was depressurized. The scene was secured until repairs could be made. The pipeline was repaired by replacing the section of pipe that was affected and placed back in service on 10/9/14 at 10:50 am. Update: 02/02/2015: all damages were limited to loss of gas and pipe replacement. Estimated cost noted during initial report remain accurate.
Detailed record list
Report Received Date
2014-11-03 00:00:00
Iyear
2014
Report Number
20140110
Supplemental Number
16634
Report Type
Supplemental Final
Operator Id
32099
Name
Energy Transfer Company
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2014-10-06 16:58:00
Location Latitude
33.30815
Location Longitude
-97.88025
Nrc Rpt Num
1097551
Nrc Rpt Datetime
2014-10-06 18:00:00
Commodity Released Type
Natural Gas
Unintentional Release
35648
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2014-10-06 17:00:00
Restart Datetime
2014-10-09 10:50:00
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Incident Identified Datetime
2014-10-06 16:58:00
On Site Datetime
2014-10-06 16:58:00
On Off Shore
Onshore
Onshore State Abbreviation
Tx
Onshore Postal Code
76431
Onshore City Name
Near Chico
Onshore County Name
Wise
Designated Location
Survey Station No.
Designated Name
19+99
Pipe Fac Name
Wise Jack County Extension
Segment Name
Chico 8"
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
24
Crossing
No
Pipe Facility Type
Intrastate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8.625
Pipe Wall Thickness
0.188
Pipe Smys
42000
Pipe Specification
Api 5l
Pipe Seam Type
Longitudinal Erw - Unknown Frequency
Pipe Manufacturer
Stupp Crporation
Pipe Coating Type
Coal Tar
Installation Year
1974
Manufactured Year
1974
Material Involved
Carbon Steel
Release Type
Rupture
Rupture Orient
Longitudinal
Rupture Length
8
Rupture Width
8
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
194
Heat Damage Ind
No
Non Heat Damage Ind
No
Hca Fatalities Ind
No
Est Cost Oper Paid
500
Est Cost Unintentional Release
143385
Est Cost Intentional Release
0
Est Cost Prop Damage
35000
Est Cost Emergency
500
Est Cost Other
0
Prpty
179385
Accident Psig
870
Mop Psig
945
Mop Cfr Section
192.619(A)(1)
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Upstream Valve Type Ind
Automatic
Downstream Valve Type Ind
Manual
Length Segment Isolated
46092
Internal Inspection Ind
No
Other Inspection Ind
Yes
Internal Inspection Details
No Connectins For Luanchers / Receiverse
Operation Complications Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Accident Identifier
Other
Accident Details
Operations Personnel At Targa Plant Contact Etc Gas Control
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
Localized Pitting
Other Corrosion Ind
Yes
Corrosion Type Details
Localized Corrosion
Field Exam Basis Ind
Yes
Underground Location
Yes
Under Cathodic Protection Ind
Yes
Cathodic Pro Start Year
1974
Shielding Evident
No
Cathodic Survey Type
Yes
Cp Annual Survey Ind
Yes
Cp Annual Survey Year
2014
Prior Damage
Yes
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
D**** N******
Preparer Title
Director Regulatory Compliance
Preparer Email
D************@e*************.com
Preparer Telephone
713-989-7232
Preparer Fax
713-989-1188
Authorizer Name
D**** N******
Authorizer Title
Director Regulatory Compliance
Authorizer Telephone
713-989-7232
Authorizer Email
D************@e*************.com
Narrative
On october 6, 2014, at approximately 4:58 pm energy transfer company (etc) confirmed a release on the wise jack county extension, 8" in wise county, near chico, texas. The pipeline is an intrastate natural gas transmission pipeline located in a rural area (class 1), under the jurisdiction of the texas railroad commission (system id# 630262). The incident was reported to the trrc and also to the nrc under id: 1097551. There were no fatalities, injuries, evacuations, road closures, explosions, fire, media interest, spills or any response by an emergency official. The nearest structure intended for human occupancy is 0.25 miles from the incident site. At 3:31 pm, etc gas control received notification from a targa- chico plant employee that there was a possible line rupture south of their facility. Pressure indicated a leak and upstream targa automatic valve was closed at 3:40 pm. At 4:22 pm, etc bvs15 was closed downstream. This isolated the site of the possible rupture to allow further evaluation. At 4:58 pm, etc employees arrived on scene of the rupture and confirmed that the leak was on the chico 8" pipeline and was depressurized. The scene was secured until repairs could be made. The pipeline was repaired by replacing the section of pipe that was affected and placed back in service on 10/9/14 at 10:50 am. Update: 02/02/2015: all damages were limited to loss of gas and pipe replacement. Estimated cost noted during initial report remain accurate.
| Report Received Date | 2014-11-03 00:00:00 |
|---|---|
| Iyear | 2014 |
| Report Number | 20140110 |
| Supplemental Number | 16634 |
| Report Type | Supplemental Final |
| Operator Id | 32099 PHMSA Enforcement |
| Name | Energy Transfer Company |
| Operator Street Address | 1300 Main Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2014-10-06 16:58:00 |
| Location Latitude | 33.30815 Google Maps OpenStreetMap |
| Location Longitude | -97.88025 Google Maps OpenStreetMap |
| Nrc Rpt Num | 1097551 NRC Report How to search |
| Nrc Rpt Datetime | 2014-10-06 18:00:00 |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 35648 |
| Intentional Release | 0 |
| Accompanying Liquid | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2014-10-06 17:00:00 |
| Restart Datetime | 2014-10-09 10:50:00 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Incident Identified Datetime | 2014-10-06 16:58:00 |
| On Site Datetime | 2014-10-06 16:58:00 |
| On Off Shore | Onshore |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 76431 |
| Onshore City Name | Near Chico |
| Onshore County Name | Wise |
| Designated Location | Survey Station No. |
| Designated Name | 19+99 |
| Pipe Fac Name | Wise Jack County Extension |
| Segment Name | Chico 8" |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 24 |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 8.625 |
| Pipe Wall Thickness | 0.188 |
| Pipe Smys | 42000 |
| Pipe Specification | Api 5l |
| Pipe Seam Type | Longitudinal Erw - Unknown Frequency |
| Pipe Manufacturer | Stupp Crporation |
| Pipe Coating Type | Coal Tar |
| Installation Year | 1974 |
| Manufactured Year | 1974 |
| Material Involved | Carbon Steel |
| Release Type | Rupture |
| Rupture Orient | Longitudinal |
| Rupture Length | 8 |
| Rupture Width | 8 |
| Class Location Type | Class 1 Location |
| Could Be Hca | No |
| Pir Radius | 194 |
| Heat Damage Ind | No |
| Non Heat Damage Ind | No |
| Hca Fatalities Ind | No |
| Est Cost Oper Paid | 500 |
| Est Cost Unintentional Release | 143385 |
| Est Cost Intentional Release | 0 |
| Est Cost Prop Damage | 35000 |
| Est Cost Emergency | 500 |
| Est Cost Other | 0 |
| Prpty | 179385 |
| Accident Psig | 870 |
| Mop Psig | 945 |
| Mop Cfr Section | 192.619(A)(1) View CFR 49 §192 |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Pressure Restriction Ind | No |
| Upstream Valve Type Ind | Automatic |
| Downstream Valve Type Ind | Manual |
| Length Segment Isolated | 46092 |
| Internal Inspection Ind | No |
| Other Inspection Ind | Yes |
| Internal Inspection Details | No Connectins For Luanchers / Receiverse |
| Operation Complications Ind | No |
| Pipeline Function | Transmission System |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Accident Identifier | Other |
| Accident Details | Operations Personnel At Targa Plant Contact Etc Gas Control |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | External Corrosion |
| Internal External | External Corrosion |
| Visual Exam Results | Localized Pitting |
| Other Corrosion Ind | Yes |
| Corrosion Type Details | Localized Corrosion |
| Field Exam Basis Ind | Yes |
| Underground Location | Yes |
| Under Cathodic Protection Ind | Yes |
| Cathodic Pro Start Year | 1974 |
| Shielding Evident | No |
| Cathodic Survey Type | Yes |
| Cp Annual Survey Ind | Yes |
| Cp Annual Survey Year | 2014 |
| Prior Damage | Yes |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | D**** N****** |
| Preparer Title | Director Regulatory Compliance |
| Preparer Email | D************@e*************.com |
| Preparer Telephone | 713-989-7232 |
| Preparer Fax | 713-989-1188 |
| Authorizer Name | D**** N****** |
| Authorizer Title | Director Regulatory Compliance |
| Authorizer Telephone | 713-989-7232 |
| Authorizer Email | D************@e*************.com |
| Narrative | On october 6, 2014, at approximately 4:58 pm energy transfer company (etc) confirmed a release on the wise jack county extension, 8" in wise county, near chico, texas. The pipeline is an intrastate natural gas transmission pipeline located in a rural area (class 1), under the jurisdiction of the texas railroad commission (system id# 630262). The incident was reported to the trrc and also to the nrc under id: 1097551. There were no fatalities, injuries, evacuations, road closures, explosions, fire, media interest, spills or any response by an emergency official. The nearest structure intended for human occupancy is 0.25 miles from the incident site. At 3:31 pm, etc gas control received notification from a targa- chico plant employee that there was a possible line rupture south of their facility. Pressure indicated a leak and upstream targa automatic valve was closed at 3:40 pm. At 4:22 pm, etc bvs15 was closed downstream. This isolated the site of the possible rupture to allow further evaluation. At 4:58 pm, etc employees arrived on scene of the rupture and confirmed that the leak was on the chico 8" pipeline and was depressurized. The scene was secured until repairs could be made. The pipeline was repaired by replacing the section of pipe that was affected and placed back in service on 10/9/14 at 10:50 am. Update: 02/02/2015: all damages were limited to loss of gas and pipe replacement. Estimated cost noted during initial report remain accurate. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA