GD incident on 2014-10-20 — MI
Operator
Consumers Energy Co
Cause
Locating Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$35,051
Incident datetime
2014-10-20 15:24
Report number
Location
MI, KALAMAZOO
Narrative
On october 20th, 2014, underground utility contractor dig it, inc. Was installing telecommunications facilities with directional bore under n. Pitcher street, kalamazoo. During this work, the contractor bored into, and punctured, a 6-inch diameter steel high pressure distribution gas main operating at approximately 190 psig. This particular segment of main is one of the two high-pressure feeds serving graphics packaging, as well as several other commercial and industrial customers in the area. There were two separate dig it directional bore crews working on n. Pitcher street. One crew was installing facilities in parallel to the existing high pressure main (north-south), and a second crew was working on laterals crossing n. Pitcher street (west-east). The damage occurred during a west-to-east bore. There were found to be multiple miss dig staking requests for the area. Miss dig tickets b42820566 and b4280561 were identified for staking of the east side of n. Pitcher street, starting at the intersection with mosel avenue and heading south for 2,500 feet. This area includes the damage location and approximately 2,000 feet to the north of damage. Two additional miss dig tickets (b42820548 and b42820550) were identified for staking both sides of the road from 1819 n. Pitcher street to the north, for approximately 600 feet. This area is immediately to the south of the damage location. While staking was evident both north and south of the damage location, the markings in the immediate vicinity of the damage (within 5 feet) were apparently not sufficient to alert the crew of the gas main's presence. The damage location is in a relatively uncongested commercial area. This area was found to be a location where traffic could be diverted, and the damage location secured, such that gas could be vented safely while a plan for isolation of the segment was developed. Gas vented for approximately 29 hours while crews worked multiple options for isolating the damaged segment, minimizing interruption of service to customers in the area.
Detailed record list
Occurred At
2014-10-20 15:24:00
Year
2014
Report Received Date
2014-11-19 00:00:00
Iyear
2014.0
Report Number
20140102.0
Supplemental Number
15966.0
Report Type
Original Final
Operator Id
2748
Name
Consumers Energy Co
Operator Street Address
One Energy Plaza
Operator City Name
Jackson
Operator State Abbreviation
MI
Operator Postal Code
49201
Local Datetime
2014-10-20 15:24:00
Location Street Address
2101 N. Pitcher Street
Location City Name
Kalamazoo
Location County Name
Kalamazoo
Location State Abbreviation
MI
Location Postal Code
49007-1889
Location Latitude
42.312144
Location Longitude
-85.579072
Nrc Rpt Datetime
2014-10-21 09:30:00
Nrc Rpt Num
1098863
Commodity Released Type
Natural Gas
Unintentional Release
6422.25
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2014-10-20 15:24:00
On Site Datetime
2014-10-20 15:40:00
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
48.0
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
Main
Installation Year
1950.0
Pipe Diameter
6.0
Pipe Specification
Api 5l Grade B
Pipe Manufacturer
Unknown
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
Electric Weld
Wt Steel
0.219
Release Type
Mechanical Puncture
Puncture Axial
1.2
Puncture Circum
1.0
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
35051.0
Est Cost Emergency
27173.0
Est Cost Other
1680.0
Est Cost Other Details
Incident Response Meal Costs
Est Cost Unintentional Release
31000.0
Prpty
94904.0
Commercial Affected
3.0
Industrial Affected
0.0
Residences Affected
0.0
Accident Psig
190.0
Normal Psig
190.0
Mop Psig
200.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Incident was immediately reported to operator when it occurred.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
Notify Cga Dirt
Yes
Pipeline Easement Row Ind
Yes
Excavator Type
Contractor
Excavator Equipment
Boring
Work Performed
Telecommunications
One Call Notified Ind
Yes
One Call Ticket Num
42820561
Locator Type
Contract Locator
Visible Marks
No
Service Interruption
Yes
Service Interruption Hours
35.0
Root Cause Category
Locating Issue
Root Cause Type
Facility Not Marked Due To Incomplete Marks At Damage Location
Preparer Name
A*** M* C*********
Preparer Title
Gas Regulatory Services Engineer
Preparer Email
A**************@c********.com
Preparer Telephone
989-791-5841
Authorizer Name
T**** A* G****
Authorizer Title
Regulatory And Compliance Manager
Authorizer Telephone
517-768-3187
Authorizer Email
T**********@c********.com
Narrative
On october 20th, 2014, underground utility contractor dig it, inc. Was installing telecommunications facilities with directional bore under n. Pitcher street, kalamazoo. During this work, the contractor bored into, and punctured, a 6-inch diameter steel high pressure distribution gas main operating at approximately 190 psig. This particular segment of main is one of the two high-pressure feeds serving graphics packaging, as well as several other commercial and industrial customers in the area. There were two separate dig it directional bore crews working on n. Pitcher street. One crew was installing facilities in parallel to the existing high pressure main (north-south), and a second crew was working on laterals crossing n. Pitcher street (west-east). The damage occurred during a west-to-east bore. There were found to be multiple miss dig staking requests for the area. Miss dig tickets b42820566 and b4280561 were identified for staking of the east side of n. Pitcher street, starting at the intersection with mosel avenue and heading south for 2,500 feet. This area includes the damage location and approximately 2,000 feet to the north of damage. Two additional miss dig tickets (b42820548 and b42820550) were identified for staking both sides of the road from 1819 n. Pitcher street to the north, for approximately 600 feet. This area is immediately to the south of the damage location. While staking was evident both north and south of the damage location, the markings in the immediate vicinity of the damage (within 5 feet) were apparently not sufficient to alert the crew of the gas main's presence. The damage location is in a relatively uncongested commercial area. This area was found to be a location where traffic could be diverted, and the damage location secured, such that gas could be vented safely while a plan for isolation of the segment was developed. Gas vented for approximately 29 hours while crews worked multiple options for isolating the damaged segment, minimizing interruption of service to customers in the area.
| Occurred At | 2014-10-20 15:24:00 |
|---|---|
| Year | 2014 |
| Report Received Date | 2014-11-19 00:00:00 |
| Iyear | 2014.0 |
| Report Number | 20140102.0 |
| Supplemental Number | 15966.0 |
| Report Type | Original Final |
| Operator Id | 2748 PHMSA Enforcement |
| Name | Consumers Energy Co |
| Operator Street Address | One Energy Plaza |
| Operator City Name | Jackson |
| Operator State Abbreviation | MI |
| Operator Postal Code | 49201 |
| Local Datetime | 2014-10-20 15:24:00 |
| Location Street Address | 2101 N. Pitcher Street |
| Location City Name | Kalamazoo |
| Location County Name | Kalamazoo |
| Location State Abbreviation | MI |
| Location Postal Code | 49007-1889 |
| Location Latitude | 42.312144 Google Maps OpenStreetMap |
| Location Longitude | -85.579072 Google Maps OpenStreetMap |
| Nrc Rpt Datetime | 2014-10-21 09:30:00 |
| Nrc Rpt Num | 1098863 NRC Report How to search |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 6422.25 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0.0 |
| Incident Identified Datetime | 2014-10-20 15:24:00 |
| On Site Datetime | 2014-10-20 15:40:00 |
| Federal | No |
| Location Type | Utility Right-Of-Way / Easement |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 48.0 |
| Crossing | No |
| Pipe Facility Type | Privately Owned |
| System Part Involved | Main |
| Installation Year | 1950.0 |
| Pipe Diameter | 6.0 |
| Pipe Specification | Api 5l Grade B |
| Pipe Manufacturer | Unknown |
| Material Involved | Steel |
| Steel Seam Type | Other |
| Steel Seam Type Details | Electric Weld |
| Wt Steel | 0.219 |
| Release Type | Mechanical Puncture |
| Puncture Axial | 1.2 |
| Puncture Circum | 1.0 |
| Class Location Type | Class 3 Location |
| Est Cost Oper Paid | 0.0 |
| Est Cost Prop Damage | 35051.0 |
| Est Cost Emergency | 27173.0 |
| Est Cost Other | 1680.0 |
| Est Cost Other Details | Incident Response Meal Costs |
| Est Cost Unintentional Release | 31000.0 |
| Prpty | 94904.0 |
| Commercial Affected | 3.0 |
| Industrial Affected | 0.0 |
| Residences Affected | 0.0 |
| Accident Psig | 190.0 |
| Normal Psig | 190.0 |
| Mop Psig | 200.0 |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Accident Identifier | Notification From Third Party That Caused The Incident |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Incident was immediately reported to operator when it occurred. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Excavation Damage |
| Cause Details | Excavation Damage By Third Party |
| Ex Party Type | Excavation Damage By Third Party |
| Prior Notification Ind | Yes |
| One Call System Ind | Yes |
| Notify Cga Dirt | Yes |
| Pipeline Easement Row Ind | Yes |
| Excavator Type | Contractor |
| Excavator Equipment | Boring |
| Work Performed | Telecommunications |
| One Call Notified Ind | Yes |
| One Call Ticket Num | 42820561 |
| Locator Type | Contract Locator |
| Visible Marks | No |
| Service Interruption | Yes |
| Service Interruption Hours | 35.0 |
| Root Cause Category | Locating Issue |
| Root Cause Type | Facility Not Marked Due To Incomplete Marks At Damage Location |
| Preparer Name | A*** M* C********* |
| Preparer Title | Gas Regulatory Services Engineer |
| Preparer Email | A**************@c********.com |
| Preparer Telephone | 989-791-5841 |
| Authorizer Name | T**** A* G**** |
| Authorizer Title | Regulatory And Compliance Manager |
| Authorizer Telephone | 517-768-3187 |
| Authorizer Email | T**********@c********.com |
| Narrative | On october 20th, 2014, underground utility contractor dig it, inc. Was installing telecommunications facilities with directional bore under n. Pitcher street, kalamazoo. During this work, the contractor bored into, and punctured, a 6-inch diameter steel high pressure distribution gas main operating at approximately 190 psig. This particular segment of main is one of the two high-pressure feeds serving graphics packaging, as well as several other commercial and industrial customers in the area. There were two separate dig it directional bore crews working on n. Pitcher street. One crew was installing facilities in parallel to the existing high pressure main (north-south), and a second crew was working on laterals crossing n. Pitcher street (west-east). The damage occurred during a west-to-east bore. There were found to be multiple miss dig staking requests for the area. Miss dig tickets b42820566 and b4280561 were identified for staking of the east side of n. Pitcher street, starting at the intersection with mosel avenue and heading south for 2,500 feet. This area includes the damage location and approximately 2,000 feet to the north of damage. Two additional miss dig tickets (b42820548 and b42820550) were identified for staking both sides of the road from 1819 n. Pitcher street to the north, for approximately 600 feet. This area is immediately to the south of the damage location. While staking was evident both north and south of the damage location, the markings in the immediate vicinity of the damage (within 5 feet) were apparently not sufficient to alert the crew of the gas main's presence. The damage location is in a relatively uncongested commercial area. This area was found to be a location where traffic could be diverted, and the damage location secured, such that gas could be vented safely while a plan for isolation of the segment was developed. Gas vented for approximately 29 hours while crews worked multiple options for isolating the damaged segment, minimizing interruption of service to customers in the area. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA