GTG incident on 2014-02-27 — TX

Operator
Acadian Gas Pipeline System
Cause
Incorrect Operation
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2014-02-27 09:25
Report number
Location
TX
Narrative
The 6 inch chico b pipeline relief valve opened to atmosphere due to the controller failing to respond to high pressure alarm. Pipeline control followed established procedures to evaluate the controller response; the controller was re-trained and re-qualified to prevent reoccurrence. The relief valve functioned properly of which resulted in the intentional release to the atmosphere. Pursuant to operator judgment that it was a significant event due to the sensitivity of the circumstance where incident occurred, the nrc was notified based on the information available at the time.
Detailed record list
Report Received Date
2014-03-28 00:00:00
Iyear
2014
Report Number
20140033
Supplemental Number
16415
Report Type
Supplemental Final
Operator Id
Name
Acadian Gas Pipeline System
Operator Street Address
1100 Louisiana St.
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2014-02-27 09:25:00
Location Latitude
Location Longitude
Nrc Rpt Num
Nrc Rpt Datetime
2014-02-27 11:12:00
Commodity Released Type
Natural Gas
Unintentional Release
0
Intentional Release
5335
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Shutdown Due Accident Ind
No
Shutdown Explain
Relief Valve Relieved To Atmosphere
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Incident Identified Datetime
2014-02-27 09:25:00
On Site Datetime
2014-02-27 09:25:00
On Off Shore
Onshore
Onshore State Abbreviation
La
Onshore Postal Code
70341
Onshore City Name
Grand Bayou
Onshore County Name
Assumption Parish
Designated Location
Milepost
Designated Name
2436+21
Pipe Fac Name
Chico B
Segment Name
307-0100
Federal
No
Location Type
Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
System Part Involved
Onshore Regulator/metering Station Equipment And Piping
Item Involved
Other
Item Involved Details
Relief Valve
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Relief Valve Opened To Atmosphere.
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
430
Heat Damage Ind
No
Non Heat Damage Ind
No
Hca Fatalities Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
0
Est Cost Intentional Release
29769
Est Cost Prop Damage
0
Est Cost Emergency
0
Est Cost Other
0
Prpty
29769
Accident Psig
902
Mop Psig
909
Mop Cfr Section
Not On Omb-Approved Form When Submitted
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Incorrect Action Ind
Yes
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
1
Num Employees Failed
0
Cause
Incorrect Operation
Cause Details
Other Incorrect Operation
Operation Type
Other Incorrect Operation
Operation Details
Controller Failing To Respond To High Pressure Alarm.
Related Failure Follow Ind
Yes
Category Type
Normal Operating Conditions
Operator Qualification Ind
Yes
Qualified Individuals
Yes, They Were Qualified For The Task(S)
Preparer Name
N***** L* G*** J**
Preparer Title
Senior Pipeline Compliance Specialist
Preparer Email
N****@e****.com
Preparer Telephone
9854934629
Authorizer Name
N***** L* G*** J**
Authorizer Title
Senior Pipeline Compliance Specialist
Authorizer Telephone
9854934629
Authorizer Email
N****@e****.com
Narrative
The 6 inch chico b pipeline relief valve opened to atmosphere due to the controller failing to respond to high pressure alarm. Pipeline control followed established procedures to evaluate the controller response; the controller was re-trained and re-qualified to prevent reoccurrence. The relief valve functioned properly of which resulted in the intentional release to the atmosphere. Pursuant to operator judgment that it was a significant event due to the sensitivity of the circumstance where incident occurred, the nrc was notified based on the information available at the time.
Report Received Date 2014-03-28 00:00:00
Iyear 2014
Report Number 20140033
Supplemental Number 16415
Report Type Supplemental Final
Operator Id 3 PHMSA Enforcement
Name Acadian Gas Pipeline System
Operator Street Address 1100 Louisiana St.
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2014-02-27 09:25:00
Location Latitude 30.019769 Google Maps OpenStreetMap
Location Longitude -91.137862 Google Maps OpenStreetMap
Nrc Rpt Num 1075268 NRC Report How to search
Nrc Rpt Datetime 2014-02-27 11:12:00
Commodity Released Type Natural Gas
Unintentional Release 0
Intentional Release 5335
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Shutdown Due Accident Ind No
Shutdown Explain Relief Valve Relieved To Atmosphere
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Incident Identified Datetime 2014-02-27 09:25:00
On Site Datetime 2014-02-27 09:25:00
On Off Shore Onshore
Onshore State Abbreviation La
Onshore Postal Code 70341
Onshore City Name Grand Bayou
Onshore County Name Assumption Parish
Designated Location Milepost
Designated Name 2436+21
Pipe Fac Name Chico B
Segment Name 307-0100
Federal No
Location Type Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Intrastate
System Part Involved Onshore Regulator/metering Station Equipment And Piping
Item Involved Other
Item Involved Details Relief Valve
Material Involved Carbon Steel
Release Type Other
Release Type Details Relief Valve Opened To Atmosphere.
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 430
Heat Damage Ind No
Non Heat Damage Ind No
Hca Fatalities Ind No
Est Cost Oper Paid 0
Est Cost Unintentional Release 0
Est Cost Intentional Release 29769
Est Cost Prop Damage 0
Est Cost Emergency 0
Est Cost Other 0
Prpty 29769
Accident Psig 902
Mop Psig 909
Mop Cfr Section Not On Omb-Approved Form When Submitted View CFR 49 §192
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Pipeline Function Transmission System
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest Incorrect Action Ind Yes
Employee Drug Test Ind Yes
Contractor Drug Test Ind No
Num Employees Tested 1
Num Employees Failed 0
Cause Incorrect Operation
Cause Details Other Incorrect Operation
Operation Type Other Incorrect Operation
Operation Details Controller Failing To Respond To High Pressure Alarm.
Related Failure Follow Ind Yes
Category Type Normal Operating Conditions
Operator Qualification Ind Yes
Qualified Individuals Yes, They Were Qualified For The Task(S)
Preparer Name N***** L* G*** J**
Preparer Title Senior Pipeline Compliance Specialist
Preparer Email N****@e****.com
Preparer Telephone 9854934629
Authorizer Name N***** L* G*** J**
Authorizer Title Senior Pipeline Compliance Specialist
Authorizer Telephone 9854934629
Authorizer Email N****@e****.com
Narrative The 6 inch chico b pipeline relief valve opened to atmosphere due to the controller failing to respond to high pressure alarm. Pipeline control followed established procedures to evaluate the controller response; the controller was re-trained and re-qualified to prevent reoccurrence. The relief valve functioned properly of which resulted in the intentional release to the atmosphere. Pursuant to operator judgment that it was a significant event due to the sensitivity of the circumstance where incident occurred, the nrc was notified based on the information available at the time.

All rights reserved. Copyright © by ClearPHMSA