Narrative
On september 29, 2013, tesoro high plains pipeline (thpp) personnel were notified of a possible crude oil release from a pipeline approximately 9 miles north of tioga, nd. Local thpp personnel immediately notified the control center which shutdown the pipeline. Thpp response personnel were dispatched to the site and federal and state authorities were notified (I.E. Nrc and nd state radio). The pipeline was excavated and the release source (a small hole) was clamped. A subsurface assessment of the affected soil has estimated the total spill volume at 20,600 bbls. The affected pipe was removed and sent to a laboratory for metallurgical analysis. The report from the metallurgical laboratory determined that the hole resulted from an electrical discharge. The laboratory also determined that there was no evidence of corrosion or mechanical damage. The root cause analysis investigation determined the electrical discharge was most likely the result of a lightning strike. Although the exact date of the lightning strike is unknown, the investigation concluded that it most likely occurred between july 29 and august 9, 2013. Per PHMSA guidance, this report is being submitted as a "final" report because the accident response consists of only long term remediation which is being conducted under the auspices of the north dakota department of health.
Detailed record list
Report Received Date
2013-10-29 00:00:00
Iyear
2013
Report Number
20130353
Supplemental Number
19930
Report Type
Supplemental Final
Operator Id
Name
Tesoro High Plains Pipeline Company Llc
Operator Street Address
19100 Ridgewood Parkway
Operator City Name
San Antonio
Operator State Abbreviation
TX
Operator Postal Code
78259
Local Datetime
2013-07-29 00:00:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
20600
Recovered Bbls
5856
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
Incident Identified Datetime
2013-09-29 21:36:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2013-09-29 21:47:00
Restart Datetime
2013-11-01 10:40:00
On Site Datetime
2013-09-29 22:15:00
Nrc Rpt Datetime
2013-09-30 00:16:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Tesoro High Plains Pipeline
Segment Name
Tioga To Black Slough
Onshore State Abbreviation
Nd
Onshore Postal Code
58852
Onshore County Name
Mountrail
Designated Location
Milepost/valve Station
Designated Name
29.6
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
48
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
6.625
Pipe Wall Thickness
0.219
Pipe Smys
42000
Pipe Specification
X-42
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Ipsco
Pipe Coating Type
Extruded Polyehylene
Installation Year
1993
Manufactured Year
1993
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
10/32" Hole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
Yes
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
168000
Est Cost Gas Released
1417839
Est Cost Prop Damage
269051
Est Cost Emergency
4100000
Est Cost Environmental
11031800
Est Cost Other
0
Prpty
16986690
Accident Psig
350
Mop Psig
1390
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
93614
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Natural Force Damage
Cause Details
Lightning
Natural Force Type
Lightning
Lightning Subtype
Direct Hit
Nf Extreme Weather Ind
No
Preparer Name
A**** W* M*******
Preparer Title
Manager Dot Compliance
Preparer Email
A***************@t******.com
Preparer Telephone
2106266343
Prepared Date
2014-12-02 00:00:00
Authorizer Name
A**** W* M*******
Authorizer Telephone
210-626-6343
Authorizer Title
Dot Compliance Manager
Authorizer Email
A***************@t******.com
Narrative
On september 29, 2013, tesoro high plains pipeline (thpp) personnel were notified of a possible crude oil release from a pipeline approximately 9 miles north of tioga, nd. Local thpp personnel immediately notified the control center which shutdown the pipeline. Thpp response personnel were dispatched to the site and federal and state authorities were notified (I.E. Nrc and nd state radio). The pipeline was excavated and the release source (a small hole) was clamped. A subsurface assessment of the affected soil has estimated the total spill volume at 20,600 bbls. The affected pipe was removed and sent to a laboratory for metallurgical analysis. The report from the metallurgical laboratory determined that the hole resulted from an electrical discharge. The laboratory also determined that there was no evidence of corrosion or mechanical damage. The root cause analysis investigation determined the electrical discharge was most likely the result of a lightning strike. Although the exact date of the lightning strike is unknown, the investigation concluded that it most likely occurred between july 29 and august 9, 2013. Per PHMSA guidance, this report is being submitted as a "final" report because the accident response consists of only long term remediation which is being conducted under the auspices of the north dakota department of health.
Report Received Date 2013-10-29 00:00:00
Iyear 2013
Report Number 20130353
Supplemental Number 19930
Report Type Supplemental Final
Operator Id 31570 PHMSA Enforcement
Name Tesoro High Plains Pipeline Company Llc
Operator Street Address 19100 Ridgewood Parkway
Operator City Name San Antonio
Operator State Abbreviation TX
Operator Postal Code 78259
Local Datetime 2013-07-29 00:00:00
Location Latitude 48.524251 Google Maps OpenStreetMap
Location Longitude -102.856912 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 20600
Recovered Bbls 5856
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Notification From Public
Incident Identified Datetime 2013-09-29 21:36:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2013-09-29 21:47:00
Restart Datetime 2013-11-01 10:40:00
On Site Datetime 2013-09-29 22:15:00
Nrc Rpt Datetime 2013-09-30 00:16:00
Nrc Rpt Num 1061615 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name Tesoro High Plains Pipeline
Segment Name Tioga To Black Slough
Onshore State Abbreviation Nd
Onshore Postal Code 58852
Onshore County Name Mountrail
Designated Location Milepost/valve Station
Designated Name 29.6
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 48
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 6.625
Pipe Wall Thickness 0.219
Pipe Smys 42000
Pipe Specification X-42
Pipe Seam Type Erw - High Frequency
Pipe Manufacturer Ipsco
Pipe Coating Type Extruded Polyehylene
Installation Year 1993
Manufactured Year 1993
Material Involved Carbon Steel
Release Type Leak
Leak Type Other
Leak Type Other 10/32" Hole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment Yes
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 168000
Est Cost Gas Released 1417839
Est Cost Prop Damage 269051
Est Cost Emergency 4100000
Est Cost Environmental 11031800
Est Cost Other 0
Prpty 16986690
Accident Psig 350
Mop Psig 1390
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 93614
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind Yes
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Natural Force Damage
Cause Details Lightning
Natural Force Type Lightning
Lightning Subtype Direct Hit
Nf Extreme Weather Ind No
Preparer Name A**** W* M*******
Preparer Title Manager Dot Compliance
Preparer Email A***************@t******.com
Preparer Telephone 2106266343
Prepared Date 2014-12-02 00:00:00
Authorizer Name A**** W* M*******
Authorizer Telephone 210-626-6343
Authorizer Title Dot Compliance Manager
Authorizer Email A***************@t******.com
Narrative On september 29, 2013, tesoro high plains pipeline (thpp) personnel were notified of a possible crude oil release from a pipeline approximately 9 miles north of tioga, nd. Local thpp personnel immediately notified the control center which shutdown the pipeline. Thpp response personnel were dispatched to the site and federal and state authorities were notified (I.E. Nrc and nd state radio). The pipeline was excavated and the release source (a small hole) was clamped. A subsurface assessment of the affected soil has estimated the total spill volume at 20,600 bbls. The affected pipe was removed and sent to a laboratory for metallurgical analysis. The report from the metallurgical laboratory determined that the hole resulted from an electrical discharge. The laboratory also determined that there was no evidence of corrosion or mechanical damage. The root cause analysis investigation determined the electrical discharge was most likely the result of a lightning strike. Although the exact date of the lightning strike is unknown, the investigation concluded that it most likely occurred between july 29 and august 9, 2013. Per PHMSA guidance, this report is being submitted as a "final" report because the accident response consists of only long term remediation which is being conducted under the auspices of the north dakota department of health.

All rights reserved. Copyright © by ClearPHMSA