HL incident on 2013-08-08 — TX

Operator
Mid - Valley Pipeline Co
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$250
Incident datetime
2013-08-08 08:40
Report number
Location
TX
Narrative
On the date of the incident mvpl's delivery station to the refinery was shut in and not making a delivery. The refinery was preparing to take a delivery from another pipeline. The refinery piping for that delivery is common with the refinery piping which takes delivery from mvpl. Pressure built on the refinery piping when the third party delivery commenced. The check valve at the point where mvpl piping connects to refinery piping did not seat completely. This allowed pressure to build on mvpl's station and drain system piping. As the pressure built, a corroded area on a 2" x 3" swedge began to leak. Two barrels were released.
Detailed record list
Report Received Date
2013-09-06 00:00:00
Iyear
2013
Report Number
20130300
Supplemental Number
18513
Report Type
Original Final
Operator Id
Name
Mid - Valley Pipeline Co
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2013-08-08 08:28:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
2
Recovered Bbls
2
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Incident Identified Datetime
2013-08-08 08:40:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
The Delivery Station Was Not Operating At The Time.
On Site Datetime
2013-08-08 08:55:00
Ignite Ind
No
Explode Ind
No
Pipe Fac Name
Bp Terminal
Segment Name
Lima To Samaria 22"
Onshore State Abbreviation
Oh
Onshore Postal Code
43616
Onshore City Name
Oregon
Onshore County Name
Lucas
Designated Location
Milepost/valve Station
Designated Name
Mp 81
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Pipe Facility Type
Interstate
Item Involved
Auxiliary Piping (E.g. Drain Lines)
Release Type
Rupture
Rupture Orient
Circumferential
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
175
Est Cost Prop Damage
250
Est Cost Emergency
8775
Est Cost Environmental
919
Est Cost Other
0
Prpty
10119
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Preparer Name
K****** D**** B***
Preparer Title
Area Dot Compliance Supervisor
Preparer Email
K*****@s**************.com
Preparer Telephone
281-637-6497
Preparer Fax
281-637-6425
Prepared Date
2013-09-06 00:00:00
Authorizer Name
K****** D**** B***
Authorizer Telephone
281-637-6497
Authorizer Title
Area Dot Compliance Supervisor
Authorizer Email
K*****@s**************.com
Narrative
On the date of the incident mvpl's delivery station to the refinery was shut in and not making a delivery. The refinery was preparing to take a delivery from another pipeline. The refinery piping for that delivery is common with the refinery piping which takes delivery from mvpl. Pressure built on the refinery piping when the third party delivery commenced. The check valve at the point where mvpl piping connects to refinery piping did not seat completely. This allowed pressure to build on mvpl's station and drain system piping. As the pressure built, a corroded area on a 2" x 3" swedge began to leak. Two barrels were released.
Report Received Date 2013-09-06 00:00:00
Iyear 2013
Report Number 20130300
Supplemental Number 18513
Report Type Original Final
Operator Id 12470 PHMSA Enforcement
Name Mid - Valley Pipeline Co
Operator Street Address 1300 Main Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2013-08-08 08:28:00
Location Latitude 41.67284 Google Maps OpenStreetMap
Location Longitude -83.45352 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 2
Recovered Bbls 2
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Incident Identified Datetime 2013-08-08 08:40:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain The Delivery Station Was Not Operating At The Time.
On Site Datetime 2013-08-08 08:55:00
Ignite Ind No
Explode Ind No
Pipe Fac Name Bp Terminal
Segment Name Lima To Samaria 22"
Onshore State Abbreviation Oh
Onshore Postal Code 43616
Onshore City Name Oregon
Onshore County Name Lucas
Designated Location Milepost/valve Station
Designated Name Mp 81
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Pipe Facility Type Interstate
Item Involved Auxiliary Piping (E.g. Drain Lines)
Release Type Rupture
Rupture Orient Circumferential
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 175
Est Cost Prop Damage 250
Est Cost Emergency 8775
Est Cost Environmental 919
Est Cost Other 0
Prpty 10119
Pipeline Function > 20% Smys Regulated Transmission
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Preparer Name K****** D**** B***
Preparer Title Area Dot Compliance Supervisor
Preparer Email K*****@s**************.com
Preparer Telephone 281-637-6497
Preparer Fax 281-637-6425
Prepared Date 2013-09-06 00:00:00
Authorizer Name K****** D**** B***
Authorizer Telephone 281-637-6497
Authorizer Title Area Dot Compliance Supervisor
Authorizer Email K*****@s**************.com
Narrative On the date of the incident mvpl's delivery station to the refinery was shut in and not making a delivery. The refinery was preparing to take a delivery from another pipeline. The refinery piping for that delivery is common with the refinery piping which takes delivery from mvpl. Pressure built on the refinery piping when the third party delivery commenced. The check valve at the point where mvpl piping connects to refinery piping did not seat completely. This allowed pressure to build on mvpl's station and drain system piping. As the pressure built, a corroded area on a 2" x 3" swedge began to leak. Two barrels were released.

All rights reserved. Copyright © by ClearPHMSA