HL incident on 2013-08-01 — TX
Operator
Enterprise Products Operating Llc
Cause
Equipment Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$42,700
Incident datetime
2013-08-01 09:40
Report number
Location
TX
Narrative
On 8/1/2013, an aerial patrol pilot informed the jackson station technician of dead vegetation near am 428. The technician drove to the site and discovered a 15' radius of stunted growth of corn above enterprise's west leg blue line. The technician found elevated lel at ground level in the cracks of the ground. The line was not running at the time. The technician informed pipeline control who lowered pressure on the line. The leaking segment was then blocked in between am 422 and am 432. The area was excavated and a small bubble leak was found at the thread of the bleeder valve on the stopple blind flange. The leak stopped and lel readings were not detected once the bleeder valve was tightened. To mitigate future leak potential due to failure at the thread, a tor was welded on the blind flange to encase the bleeder valve. The pipeline was restarted on 8/9/2013 at 10:00 am.
Detailed record list
Report Received Date
2013-08-30 00:00:00
Iyear
2013
Report Number
20130294
Supplemental Number
18987
Report Type
Supplemental Final
Operator Id
31618
Name
Enterprise Products Operating Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2013-08-01 09:40:00
Location Latitude
43.78507
Location Longitude
-94.624817
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Propane
Unintentional Release Bbls
0.2
Intentional Release Bbls
0.1
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Incident Identified Datetime
2013-08-01 09:40:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
The Pipeline Was Already Shut Down At The Time.
On Site Datetime
2013-08-01 09:40:00
Nrc Rpt Datetime
2013-08-01 11:15:00
Nrc Rpt Num
1055769
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
West Leg Blue Line
Segment Name
Lid 410
Onshore State Abbreviation
Mn
Onshore Postal Code
56176
Onshore City Name
Trimont
Onshore County Name
Martin
Designated Location
Milepost/valve Station
Designated Name
Am 428
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Pipe Facility Type
Interstate
Item Involved
Tap Fitting(Stopple, Thread-O-Ring, Weld-O-Let, Etc.)
Release Type
Leak
Leak Type
Connection Failure
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
1200
Est Cost Gas Released
0
Est Cost Prop Damage
42700
Est Cost Emergency
2400
Est Cost Environmental
0
Est Cost Other
0
Prpty
46300
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Threaded Connection/coupling Failure
Eq Failure Type
Threaded Connection/coupling Failure
Preparer Name
N*** T*****
Preparer Title
Pipeline Compliance Engineer
Preparer Email
N*******@e****.com
Preparer Telephone
713-381-2493
Prepared Date
2014-02-05 00:00:00
Authorizer Name
N*** T*****
Authorizer Telephone
713-381-2493
Authorizer Title
Pipeline Compliance Engineer
Authorizer Email
N*******@e****.com
Narrative
On 8/1/2013, an aerial patrol pilot informed the jackson station technician of dead vegetation near am 428. The technician drove to the site and discovered a 15' radius of stunted growth of corn above enterprise's west leg blue line. The technician found elevated lel at ground level in the cracks of the ground. The line was not running at the time. The technician informed pipeline control who lowered pressure on the line. The leaking segment was then blocked in between am 422 and am 432. The area was excavated and a small bubble leak was found at the thread of the bleeder valve on the stopple blind flange. The leak stopped and lel readings were not detected once the bleeder valve was tightened. To mitigate future leak potential due to failure at the thread, a tor was welded on the blind flange to encase the bleeder valve. The pipeline was restarted on 8/9/2013 at 10:00 am.
| Report Received Date | 2013-08-30 00:00:00 |
|---|---|
| Iyear | 2013 |
| Report Number | 20130294 |
| Supplemental Number | 18987 |
| Report Type | Supplemental Final |
| Operator Id | 31618 PHMSA Enforcement |
| Name | Enterprise Products Operating Llc |
| Operator Street Address | 1100 Louisiana Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2013-08-01 09:40:00 |
| Location Latitude | 43.78507 Google Maps OpenStreetMap |
| Location Longitude | -94.624817 Google Maps OpenStreetMap |
| Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
| Commodity Subtype | Other Hvl |
| Commodity Details | Propane |
| Unintentional Release Bbls | 0.2 |
| Intentional Release Bbls | 0.1 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Incident Identified Datetime | 2013-08-01 09:40:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | The Pipeline Was Already Shut Down At The Time. |
| On Site Datetime | 2013-08-01 09:40:00 |
| Nrc Rpt Datetime | 2013-08-01 11:15:00 |
| Nrc Rpt Num | 1055769 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | West Leg Blue Line |
| Segment Name | Lid 410 |
| Onshore State Abbreviation | Mn |
| Onshore Postal Code | 56176 |
| Onshore City Name | Trimont |
| Onshore County Name | Martin |
| Designated Location | Milepost/valve Station |
| Designated Name | Am 428 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Pipe Facility Type | Interstate |
| Item Involved | Tap Fitting(Stopple, Thread-O-Ring, Weld-O-Let, Etc.) |
| Release Type | Leak |
| Leak Type | Connection Failure |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 1200 |
| Est Cost Gas Released | 0 |
| Est Cost Prop Damage | 42700 |
| Est Cost Emergency | 2400 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 46300 |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Threaded Connection/coupling Failure |
| Eq Failure Type | Threaded Connection/coupling Failure |
| Preparer Name | N*** T***** |
| Preparer Title | Pipeline Compliance Engineer |
| Preparer Email | N*******@e****.com |
| Preparer Telephone | 713-381-2493 |
| Prepared Date | 2014-02-05 00:00:00 |
| Authorizer Name | N*** T***** |
| Authorizer Telephone | 713-381-2493 |
| Authorizer Title | Pipeline Compliance Engineer |
| Authorizer Email | N*******@e****.com |
| Narrative | On 8/1/2013, an aerial patrol pilot informed the jackson station technician of dead vegetation near am 428. The technician drove to the site and discovered a 15' radius of stunted growth of corn above enterprise's west leg blue line. The technician found elevated lel at ground level in the cracks of the ground. The line was not running at the time. The technician informed pipeline control who lowered pressure on the line. The leaking segment was then blocked in between am 422 and am 432. The area was excavated and a small bubble leak was found at the thread of the bleeder valve on the stopple blind flange. The leak stopped and lel readings were not detected once the bleeder valve was tightened. To mitigate future leak potential due to failure at the thread, a tor was welded on the blind flange to encase the bleeder valve. The pipeline was restarted on 8/9/2013 at 10:00 am. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA