Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2013-07-30 — OK
Operator
Magellan Terminals Holdings, Lp
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2013-07-30 09:00
Report number
Location
OK
Narrative
Facility personnel were conducting a daily inspection when oil was found in the dike around unit #5 at shinn pence. Upon investigation, it was found that the valve packing pressured up due to oil seeping into the cavity on the valve. Through the rising temperatures of the day, this cavity pressured up and released oil. The valve was repacked and put back in service. Investigating the potential to add thermal relief valves on the affected piping.
Detailed record list
Report Received Date
2013-08-27 00:00:00
Iyear
2013
Report Number
20130292
Supplemental Number
19818
Report Type
Supplemental Final
Operator Id
31580
Name
Magellan Terminals Holdings, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2013-07-30 09:00:00
Location Latitude
35.94754
Location Longitude
-96.74449
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.47
Recovered Bbls
0.47
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Incident Identified Datetime
2013-07-30 09:00:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Pipeline Was Already Idle
On Site Datetime
2013-07-30 09:20:00
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Shinn Pence
Segment Name
Station #801
Onshore State Abbreviation
Ok
Onshore Postal Code
74023
Onshore City Name
Cushing
Onshore County Name
Payne
Designated Location
Survey Station No.
Designated Name
801
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Auxiliary Or Other Valve
Release Type
Leak
Leak Type
Seal Or Packing
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
0
Est Cost Emergency
3000
Est Cost Environmental
0
Est Cost Other
0
Prpty
3000
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Preparer Name
D******* C*********
Preparer Email
D******************@m*********.com
Prepared Date
2014-10-23 00:00:00
Authorizer Name
D******* C*********
Authorizer Telephone
918-574-7386
Authorizer Title
Compliance Coordinator Sr
Authorizer Email
D******************@m*********.com
Narrative
Facility personnel were conducting a daily inspection when oil was found in the dike around unit #5 at shinn pence. Upon investigation, it was found that the valve packing pressured up due to oil seeping into the cavity on the valve. Through the rising temperatures of the day, this cavity pressured up and released oil. The valve was repacked and put back in service. Investigating the potential to add thermal relief valves on the affected piping.
| Report Received Date | 2013-08-27 00:00:00 |
|---|---|
| Iyear | 2013 |
| Report Number | 20130292 |
| Supplemental Number | 19818 |
| Report Type | Supplemental Final |
| Operator Id | 31580 PHMSA Enforcement |
| Name | Magellan Terminals Holdings, Lp |
| Operator Street Address | 100 West 5th Street |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74103 |
| Local Datetime | 2013-07-30 09:00:00 |
| Location Latitude | 35.94754 Google Maps OpenStreetMap |
| Location Longitude | -96.74449 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 0.47 |
| Recovered Bbls | 0.47 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Incident Identified Datetime | 2013-07-30 09:00:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Pipeline Was Already Idle |
| On Site Datetime | 2013-07-30 09:20:00 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Shinn Pence |
| Segment Name | Station #801 |
| Onshore State Abbreviation | Ok |
| Onshore Postal Code | 74023 |
| Onshore City Name | Cushing |
| Onshore County Name | Payne |
| Designated Location | Survey Station No. |
| Designated Name | 801 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Pipe Facility Type | Interstate |
| Item Involved | Valve |
| Valve Type | Auxiliary Or Other Valve |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 0 |
| Est Cost Prop Damage | 0 |
| Est Cost Emergency | 3000 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 3000 |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Non-Threaded Connection Failure |
| Eq Failure Type | Non-Threaded Connection Failure |
| Preparer Name | D******* C********* |
| Preparer Email | D******************@m*********.com |
| Prepared Date | 2014-10-23 00:00:00 |
| Authorizer Name | D******* C********* |
| Authorizer Telephone | 918-574-7386 |
| Authorizer Title | Compliance Coordinator Sr |
| Authorizer Email | D******************@m*********.com |
| Narrative | Facility personnel were conducting a daily inspection when oil was found in the dike around unit #5 at shinn pence. Upon investigation, it was found that the valve packing pressured up due to oil seeping into the cavity on the valve. Through the rising temperatures of the day, this cavity pressured up and released oil. The valve was repacked and put back in service. Investigating the potential to add thermal relief valves on the affected piping. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA