HL incident on 2013-07-30 — —

Operator
Kinder Morgan Cochin Llc
Cause
Incorrect Operation
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2013-07-30 16:30
Report number
Location
Narrative
During the process of repairing a butt weld associated with this project, an instantaneous flash occurred when a welder started a root bead. The flash self-extinguished immediately after the initial event. Post event no additional flammable vapors could be detected. Air movers were installed to maintain the area clear of any potential flammable vapors and the weld repair was completed. This change was not submitted to the construction manager and the contractor's foreman for review before the unplanned weld repair task proceeded. Notes about specific report data: 1.) part a, item 9, estimated volume of commodity released unintentionally (barrels): a "0" (zero) is entered within PHMSA's online form for part a, line 9. Phmsa system does not show a zero in the final published document. The smallest one digit increment of 0.10 barrels (4.2 gallons) allowed by PHMSA's system is extremely greater than the negligible vapor amount we estimated. The flash event not the quantity of vapors released is what made this event reportable. Zeroes were entered for part a, items 10 & 11. 2.) part d, item 8, estimated property damage: km did not identify any cost associated with this event. There were no damages or expenses associated with this event and the vapors that flashed were not from raw product as this section had been purged with nitrogen prior to starting or project and open to the atmosphere during the initial check valve cutout. Due to the nature of the event no emergency response organization were not called upon for support nor was there any environmental remediation required.
Detailed record list
Report Received Date
2013-08-23 00:00:00
Iyear
2013
Report Number
20130288
Supplemental Number
19037
Report Type
Supplemental Final
Operator Id
Name
Kinder Morgan Cochin Llc
Operator Street Address
4000, 585-8 Ave Sw
Operator City Name
Calgary
Operator Postal Code
T2p1g1
Local Datetime
2013-07-25 16:30:00
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Residual Vapors
Unintentional Release Bbls
0
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2013-07-30 16:30:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
The System Was Previously Shut Down And Purged For Project Construction Work.
On Site Datetime
2013-07-30 16:30:00
Nrc Rpt Datetime
2013-07-25 19:49:00
Nrc Rpt Num
Ignite Ind
Yes
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Wheaton Pump Station
Segment Name
Wheaton To Hector
Onshore State Abbreviation
Mn
Onshore Postal Code
56296
Onshore City Name
Wheaton
Onshore County Name
Traverse
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Weld, Including Heat-Affected Zone
Weld Subtype
Other Butt Weld
Installation Year
2013
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Small Flash Event When Welder Started Root Bead.
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
0
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Est Cost Other Details
No Cost Associated With Event. There Were No Associated Damages.
Prpty
0
Accident Psig
0
Mop Psig
1000
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The section is question was shut in and blown down for scheduled project construction work. This section was not being operated at the time of the event and was purged of product.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Incorrect Operation
Cause Details
Other Incorrect Operation
Operation Type
Other Incorrect Operation
Operation Details
The Act Of Conducting A Weld Repair Should Have Been Considered A Change To The Initial Work Plan. This Change Should Have Been Submitted To The Construction Manager And The Contractor's Foreman For Review Before The Unplanned Weld Repair Task Proceeded.
Related Failure Follow Ind
Yes
Category Type
Construction
Operator Qualification Ind
Yes
Qualified Individuals
Yes, They Were Qualified For The Task(S)
Preparer Name
J**** H********
Preparer Title
Manager Compliance Codes And Standards
Preparer Email
J**************@k***********.com
Preparer Telephone
713-369-9443
Preparer Fax
713-495-2767
Prepared Date
2014-02-20 00:00:00
Authorizer Name
J**** H********
Authorizer Telephone
713-369-9443
Authorizer Title
Manager Compliance Codes And Standards
Authorizer Email
J**************@k***********.com
Narrative
During the process of repairing a butt weld associated with this project, an instantaneous flash occurred when a welder started a root bead. The flash self-extinguished immediately after the initial event. Post event no additional flammable vapors could be detected. Air movers were installed to maintain the area clear of any potential flammable vapors and the weld repair was completed. This change was not submitted to the construction manager and the contractor's foreman for review before the unplanned weld repair task proceeded. Notes about specific report data: 1.) part a, item 9, estimated volume of commodity released unintentionally (barrels): a "0" (zero) is entered within PHMSA's online form for part a, line 9. Phmsa system does not show a zero in the final published document. The smallest one digit increment of 0.10 barrels (4.2 gallons) allowed by PHMSA's system is extremely greater than the negligible vapor amount we estimated. The flash event not the quantity of vapors released is what made this event reportable. Zeroes were entered for part a, items 10 & 11. 2.) part d, item 8, estimated property damage: km did not identify any cost associated with this event. There were no damages or expenses associated with this event and the vapors that flashed were not from raw product as this section had been purged with nitrogen prior to starting or project and open to the atmosphere during the initial check valve cutout. Due to the nature of the event no emergency response organization were not called upon for support nor was there any environmental remediation required.
Report Received Date 2013-08-23 00:00:00
Iyear 2013
Report Number 20130288
Supplemental Number 19037
Report Type Supplemental Final
Operator Id 32258 PHMSA Enforcement
Name Kinder Morgan Cochin Llc
Operator Street Address 4000, 585-8 Ave Sw
Operator City Name Calgary
Operator Postal Code T2p1g1
Local Datetime 2013-07-25 16:30:00
Location Latitude 45.883706 Google Maps OpenStreetMap
Location Longitude -96.492211 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Other Hvl
Commodity Details Residual Vapors
Unintentional Release Bbls 0
Intentional Release Bbls 0
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Contractor Working For The Operator
Incident Identified Datetime 2013-07-30 16:30:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain The System Was Previously Shut Down And Purged For Project Construction Work.
On Site Datetime 2013-07-30 16:30:00
Nrc Rpt Datetime 2013-07-25 19:49:00
Nrc Rpt Num 1055117 NRC Report How to search
Ignite Ind Yes
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Wheaton Pump Station
Segment Name Wheaton To Hector
Onshore State Abbreviation Mn
Onshore Postal Code 56296
Onshore City Name Wheaton
Onshore County Name Traverse
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Underground
Incident Area Subtype Exposed Due To Excavation
Crossing No
Pipe Facility Type Interstate
Item Involved Weld, Including Heat-Affected Zone
Weld Subtype Other Butt Weld
Installation Year 2013
Material Involved Carbon Steel
Release Type Other
Release Type Details Small Flash Event When Welder Started Root Bead.
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 0
Est Cost Prop Damage 0
Est Cost Emergency 0
Est Cost Environmental 0
Est Cost Other 0
Est Cost Other Details No Cost Associated With Event. There Were No Associated Damages.
Prpty 0
Accident Psig 0
Mop Psig 1000
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The section is question was shut in and blown down for scheduled project construction work. This section was not being operated at the time of the event and was purged of product.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Incorrect Operation
Cause Details Other Incorrect Operation
Operation Type Other Incorrect Operation
Operation Details The Act Of Conducting A Weld Repair Should Have Been Considered A Change To The Initial Work Plan. This Change Should Have Been Submitted To The Construction Manager And The Contractor's Foreman For Review Before The Unplanned Weld Repair Task Proceeded.
Related Failure Follow Ind Yes
Category Type Construction
Operator Qualification Ind Yes
Qualified Individuals Yes, They Were Qualified For The Task(S)
Preparer Name J**** H********
Preparer Title Manager Compliance Codes And Standards
Preparer Email J**************@k***********.com
Preparer Telephone 713-369-9443
Preparer Fax 713-495-2767
Prepared Date 2014-02-20 00:00:00
Authorizer Name J**** H********
Authorizer Telephone 713-369-9443
Authorizer Title Manager Compliance Codes And Standards
Authorizer Email J**************@k***********.com
Narrative During the process of repairing a butt weld associated with this project, an instantaneous flash occurred when a welder started a root bead. The flash self-extinguished immediately after the initial event. Post event no additional flammable vapors could be detected. Air movers were installed to maintain the area clear of any potential flammable vapors and the weld repair was completed. This change was not submitted to the construction manager and the contractor's foreman for review before the unplanned weld repair task proceeded. Notes about specific report data: 1.) part a, item 9, estimated volume of commodity released unintentionally (barrels): a "0" (zero) is entered within PHMSA's online form for part a, line 9. Phmsa system does not show a zero in the final published document. The smallest one digit increment of 0.10 barrels (4.2 gallons) allowed by PHMSA's system is extremely greater than the negligible vapor amount we estimated. The flash event not the quantity of vapors released is what made this event reportable. Zeroes were entered for part a, items 10 & 11. 2.) part d, item 8, estimated property damage: km did not identify any cost associated with this event. There were no damages or expenses associated with this event and the vapors that flashed were not from raw product as this section had been purged with nitrogen prior to starting or project and open to the atmosphere during the initial check valve cutout. Due to the nature of the event no emergency response organization were not called upon for support nor was there any environmental remediation required.