HL incident on 2013-07-11 — TX

Operator
Sunoco Pipeline L.p.
Cause
Material Failure Of Pipe Or Weld
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$2,000
Incident datetime
2013-07-11 16:00
Report number
Location
TX
Narrative
On 7/11/2013 at approximately 16:00 hours, a report of dead vegetation was received at the montello control center. Pipeline personnel arrived at 16:10 to assess the claim of dead vegetation along the right of way. Dead grass was observed along the right of way. Splp personnel investigated to determine whether a sunoco pipeline was related to the dead vegetation. After excavation and exposing a portion of the pipe, a pinhole leak was discovered at a weld at approximately the 6 o'clock position on the pipe. A temporary repair was made by installing a pipe clamp. The affected section was cut out and sent for analysis. A new section of pipe was installed as a permanent repair. Metallurgical analysis results indicated that the leak occurred at an internal discontinuity within the girth weld.
Detailed record list
Report Received Date
2013-08-07 00:00:00
Iyear
2013
Report Number
20130268
Supplemental Number
18854
Report Type
Supplemental Final
Operator Id
Name
Sunoco Pipeline L.p.
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2013-07-11 16:00:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
0.1
Recovered Bbls
0.1
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Other
Accident Details
Report Of Dead Vegetation Along The Right Of Way
Incident Identified Datetime
2013-07-11 16:00:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Pipeline Was Not Transferring Product At The Time.
On Site Datetime
2013-07-11 16:10:00
Nrc Rpt Datetime
2013-07-11 21:18:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Brjt-Cdjt-8
Segment Name
13023
Onshore State Abbreviation
Oh
Onshore Postal Code
43616-4172
Onshore City Name
Oregon
Onshore County Name
Lucas
Designated Location
Survey Station No.
Designated Name
206+57.3
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
42
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Weld, Including Heat-Affected Zone
Pipe Diameter
8
Pipe Wall Thickness
0.277
Pipe Smys
35000
Pipe Specification
Api 5l Grade B
Pipe Seam Type
Seamless
Pipe Manufacturer
Youngstown Sheet And Tube
Pipe Coating Type
Coal Tar
Weld Subtype
Pipe Girth Weld
Installation Year
1949
Manufactured Year
1949
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
2000
Est Cost Gas Released
0
Est Cost Prop Damage
2000
Est Cost Emergency
51540
Est Cost Environmental
0
Est Cost Other
0
Prpty
55540
Accident Psig
0
Mop Psig
740
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
24970
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Design-, Construction-, Installation-, Or Fabrication-Related
Metallurgical Ind
Yes
Failure Type
Design-, Construction-, Installation-, Or Fabrication-Related
Other Factor
Yes
Other Factor Details
Internal Discontinuity Within The Girth Weld.
Pwf Additional Other Ind
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Axial Recent Year
2013
Geometry Recent Year
2013
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
A* K******
Preparer Title
Dot Compliance Specialist
Preparer Email
A********@s**************.com
Preparer Telephone
610-859-5755
Preparer Fax
866-741-1888
Prepared Date
2013-12-18 00:00:00
Authorizer Name
A* K******
Authorizer Telephone
610-859-5755
Authorizer Title
Dot Compliance Specialist
Authorizer Email
A********@s**************.com
Narrative
On 7/11/2013 at approximately 16:00 hours, a report of dead vegetation was received at the montello control center. Pipeline personnel arrived at 16:10 to assess the claim of dead vegetation along the right of way. Dead grass was observed along the right of way. Splp personnel investigated to determine whether a sunoco pipeline was related to the dead vegetation. After excavation and exposing a portion of the pipe, a pinhole leak was discovered at a weld at approximately the 6 o'clock position on the pipe. A temporary repair was made by installing a pipe clamp. The affected section was cut out and sent for analysis. A new section of pipe was installed as a permanent repair. Metallurgical analysis results indicated that the leak occurred at an internal discontinuity within the girth weld.
Report Received Date 2013-08-07 00:00:00
Iyear 2013
Report Number 20130268
Supplemental Number 18854
Report Type Supplemental Final
Operator Id 18718 PHMSA Enforcement
Name Sunoco Pipeline L.p.
Operator Street Address 1300 Main Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2013-07-11 16:00:00
Location Latitude 41.61955 Google Maps OpenStreetMap
Location Longitude -83.44724 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls 0.1
Recovered Bbls 0.1
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Other
Accident Details Report Of Dead Vegetation Along The Right Of Way
Incident Identified Datetime 2013-07-11 16:00:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain Pipeline Was Not Transferring Product At The Time.
On Site Datetime 2013-07-11 16:10:00
Nrc Rpt Datetime 2013-07-11 21:18:00
Nrc Rpt Num 1053540 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Remotely Controlled
Downstream Valve Type Ind Remotely Controlled
Num Pub Evacuated 0
Pipe Fac Name Brjt-Cdjt-8
Segment Name 13023
Onshore State Abbreviation Oh
Onshore Postal Code 43616-4172
Onshore City Name Oregon
Onshore County Name Lucas
Designated Location Survey Station No.
Designated Name 206+57.3
Federal No
Location Type Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 42
Crossing No
Pipe Facility Type Interstate
Item Involved Weld, Including Heat-Affected Zone
Pipe Diameter 8
Pipe Wall Thickness 0.277
Pipe Smys 35000
Pipe Specification Api 5l Grade B
Pipe Seam Type Seamless
Pipe Manufacturer Youngstown Sheet And Tube
Pipe Coating Type Coal Tar
Weld Subtype Pipe Girth Weld
Installation Year 1949
Manufactured Year 1949
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
Usa Drinking Ind Yes
Usa Drinking Yes No Yes
Est Cost Oper Paid 2000
Est Cost Gas Released 0
Est Cost Prop Damage 2000
Est Cost Emergency 51540
Est Cost Environmental 0
Est Cost Other 0
Prpty 55540
Accident Psig 0
Mop Psig 740
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 24970
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function < 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Material Failure Of Pipe Or Weld
Cause Details Design-, Construction-, Installation-, Or Fabrication-Related
Metallurgical Ind Yes
Failure Type Design-, Construction-, Installation-, Or Fabrication-Related
Other Factor Yes
Other Factor Details Internal Discontinuity Within The Girth Weld.
Pwf Additional Other Ind Yes
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Geometry Deformation Ind Yes
Axial Recent Year 2013
Geometry Recent Year 2013
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name A* K******
Preparer Title Dot Compliance Specialist
Preparer Email A********@s**************.com
Preparer Telephone 610-859-5755
Preparer Fax 866-741-1888
Prepared Date 2013-12-18 00:00:00
Authorizer Name A* K******
Authorizer Telephone 610-859-5755
Authorizer Title Dot Compliance Specialist
Authorizer Email A********@s**************.com
Narrative On 7/11/2013 at approximately 16:00 hours, a report of dead vegetation was received at the montello control center. Pipeline personnel arrived at 16:10 to assess the claim of dead vegetation along the right of way. Dead grass was observed along the right of way. Splp personnel investigated to determine whether a sunoco pipeline was related to the dead vegetation. After excavation and exposing a portion of the pipe, a pinhole leak was discovered at a weld at approximately the 6 o'clock position on the pipe. A temporary repair was made by installing a pipe clamp. The affected section was cut out and sent for analysis. A new section of pipe was installed as a permanent repair. Metallurgical analysis results indicated that the leak occurred at an internal discontinuity within the girth weld.