HL incident on 2013-06-30 — TX

Operator
Plains Pipeline, L.p.
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2013-06-30 19:45
Report number
Location
TX
Narrative
Approximately 220 bbls of crude oil were released within the tank dike of tank 2 due to a failure of a temporary line used to transfer the remaining contents of tank 2 to tank 202608. At the time of the release, tank 2 was being removed from service; the tank's volume was being transferred to tank 202608 using a diaphragm pump with a temporary line attached. During the transfer process, movement of the temporary line caused the line to fatigue and rupture resulting in a release. Once the release was discovered tank 2 was isolated. The release volume was fully contained within the dike surrounding tank 2 and no water was impacted. We awknowledge & apologize for this late submittal; our error is due to a scheduling oversight in setting the due date for this report.
Detailed record list
Report Received Date
2013-08-06 00:00:00
Iyear
2013
Report Number
20130267
Supplemental Number
18424
Report Type
Original Final
Operator Id
Name
Plains Pipeline, L.p.
Operator Street Address
333 Clay Street, Suite 1900
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2013-06-30 19:45:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
220
Recovered Bbls
220
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2013-06-30 19:45:00
System Part Involved
Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Operators Were Able To Close The Valves From The Tank
On Site Datetime
2013-06-30 19:45:00
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Catarina Station
Onshore State Abbreviation
Tx
Onshore Postal Code
78836
Onshore City Name
Catarina
Onshore County Name
Dimmit
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Tank, Including Attached Appurtenances
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Other
Tank Type
Atmospheric
Item Involved Details
Temporary Line
Installation Year
2013
Material Involved
Material Other Than Carbon Steel
Material Details
Steel Reinforced Rubber Hose
Release Type
Rupture
Rupture Orient
Circumferential
Rupture Width
6
Rupture Length
4
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
2000
Est Cost Prop Damage
0
Est Cost Emergency
10000
Est Cost Environmental
30600
Est Cost Other
0
Prpty
42600
Accident Psig
75
Mop Psig
285
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Movement was done locally, the control room was not managing the flow at the time.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Other Equipment Failure
Eq Failure Type
Other Equipment Failure
Failure Details
Temporary Line
Additional Support Ind
Yes
Preparer Name
S***** N*****
Preparer Title
Compliance Specialist
Preparer Email
S******@p****.com
Preparer Telephone
(713)993-5673
Preparer Fax
(713)646-4310
Prepared Date
2013-08-06 00:00:00
Authorizer Name
T***** M*****
Authorizer Telephone
(713)646-4109
Authorizer Title
Sr Director Env And Regulatory Compliance
Authorizer Email
T*******@p****.com
Narrative
Approximately 220 bbls of crude oil were released within the tank dike of tank 2 due to a failure of a temporary line used to transfer the remaining contents of tank 2 to tank 202608. At the time of the release, tank 2 was being removed from service; the tank's volume was being transferred to tank 202608 using a diaphragm pump with a temporary line attached. During the transfer process, movement of the temporary line caused the line to fatigue and rupture resulting in a release. Once the release was discovered tank 2 was isolated. The release volume was fully contained within the dike surrounding tank 2 and no water was impacted. We awknowledge & apologize for this late submittal; our error is due to a scheduling oversight in setting the due date for this report.
Report Received Date 2013-08-06 00:00:00
Iyear 2013
Report Number 20130267
Supplemental Number 18424
Report Type Original Final
Operator Id 300 PHMSA Enforcement
Name Plains Pipeline, L.p.
Operator Street Address 333 Clay Street, Suite 1900
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2013-06-30 19:45:00
Location Latitude 28.3563889 Google Maps OpenStreetMap
Location Longitude -99.571389 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 220
Recovered Bbls 220
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2013-06-30 19:45:00
System Part Involved Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain Operators Were Able To Close The Valves From The Tank
On Site Datetime 2013-06-30 19:45:00
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Catarina Station
Onshore State Abbreviation Tx
Onshore Postal Code 78836
Onshore City Name Catarina
Onshore County Name Dimmit
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Tank, Including Attached Appurtenances
Crossing No
Pipe Facility Type Intrastate
Item Involved Other
Tank Type Atmospheric
Item Involved Details Temporary Line
Installation Year 2013
Material Involved Material Other Than Carbon Steel
Material Details Steel Reinforced Rubber Hose
Release Type Rupture
Rupture Orient Circumferential
Rupture Width 6
Rupture Length 4
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 2000
Est Cost Prop Damage 0
Est Cost Emergency 10000
Est Cost Environmental 30600
Est Cost Other 0
Prpty 42600
Accident Psig 75
Mop Psig 285
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function < 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Movement was done locally, the control room was not managing the flow at the time.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Other Equipment Failure
Eq Failure Type Other Equipment Failure
Failure Details Temporary Line
Additional Support Ind Yes
Preparer Name S***** N*****
Preparer Title Compliance Specialist
Preparer Email S******@p****.com
Preparer Telephone (713)993-5673
Preparer Fax (713)646-4310
Prepared Date 2013-08-06 00:00:00
Authorizer Name T***** M*****
Authorizer Telephone (713)646-4109
Authorizer Title Sr Director Env And Regulatory Compliance
Authorizer Email T*******@p****.com
Narrative Approximately 220 bbls of crude oil were released within the tank dike of tank 2 due to a failure of a temporary line used to transfer the remaining contents of tank 2 to tank 202608. At the time of the release, tank 2 was being removed from service; the tank's volume was being transferred to tank 202608 using a diaphragm pump with a temporary line attached. During the transfer process, movement of the temporary line caused the line to fatigue and rupture resulting in a release. Once the release was discovered tank 2 was isolated. The release volume was fully contained within the dike surrounding tank 2 and no water was impacted. We awknowledge & apologize for this late submittal; our error is due to a scheduling oversight in setting the due date for this report.

All rights reserved. Copyright © by ClearPHMSA