Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2013-04-30 — TX
Operator
Mobil Pipe Line Company
Cause
Other Outside Force Damage
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2013-04-30 13:40
Report number
Location
TX
Narrative
Pipeline damage was apparently caused by third party installation of a guy wire to anchor a power pole. The pole was installed in 1984 prior to the missouri one call system. No record found to indicate that any notification was received prior to pole/anchor installation. Ozark borders co-op provided information on the installation date. Incident still under investigation and a supplemental report will be completed upon final investigation. 3-21-14 supplemental report submitted to add missing data in part c, question 3 - added pipe
Detailed record list
Report Received Date
2013-05-30 00:00:00
Iyear
2013
Report Number
20130189
Supplemental Number
19160
Report Type
Supplemental
Operator Id
12628
Name
Mobil Pipe Line Company
Operator Street Address
800 Bell Street Room 623 F
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2013-04-30 13:40:00
Location Latitude
36.57243
Location Longitude
-90.87867
Commodity Released Type
Crude Oil
Unintentional Release Bbls
1.3
Recovered Bbls
1.3
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
Incident Identified Datetime
2013-04-30 13:40:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Pipeline Was Previously Shut Down Due To March 29 Release In Mayflower Ar.'
On Site Datetime
2013-04-30 14:10:00
Nrc Rpt Datetime
2013-04-30 15:37:00
Nrc Rpt Num
1045614
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Pegasus Pipeline System
Segment Name
Doniphan To Strawberry Section
Onshore State Abbreviation
Mo
Onshore Postal Code
63935
Onshore City Name
Doniphan
Onshore County Name
Ripley
Designated Location
Milepost/valve Station
Designated Name
Mp 461.52
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
25
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
20
Pipe Wall Thickness
0.312
Pipe Smys
42000
Pipe Specification
5xl-42
Pipe Seam Type
Seamless
Pipe Manufacturer
National
Pipe Coating Type
Coal Tar
Installation Year
1947
Manufactured Year
1947
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
3
Puncture Circum
0.1
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
5000
Est Cost Gas Released
100
Est Cost Prop Damage
0
Est Cost Emergency
75000
Est Cost Environmental
143000
Est Cost Other
50000
Est Cost Other Details
Repair For Welding , Nde, And Associate Repair Cost.
Prpty
273100
Accident Psig
410
Mop Psig
875
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
328680
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Pipeline system was not running and was shut down from a earler incident. The pipeline was being monitored by controller.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Outside Force Damage
Cause Details
Other Outside Force Damage
Outside Force Type
Other Outside Force Damage
Osf Other Details
Pipeline Damage Was Apparently Caused By Third Party Installation Of A Guy Wire To Anchor A Power Pole. The Pole Was Installed In 1984 Prior To The Missouri One Call System.
Preparer Name
L**** H********
Preparer Title
Pipeline Safety Advisor
Preparer Email
L****************@e*********.com
Preparer Telephone
903-654-5345
Preparer Fax
903-654-5374
Prepared Date
2014-03-21 00:00:00
Authorizer Name
M*** D W******
Authorizer Telephone
713-656-0227
Authorizer Title
Manager- Safety-Health - Environmental
Authorizer Email
M*************@e*********.com
Narrative
Pipeline damage was apparently caused by third party installation of a guy wire to anchor a power pole. The pole was installed in 1984 prior to the missouri one call system. No record found to indicate that any notification was received prior to pole/anchor installation. Ozark borders co-op provided information on the installation date. Incident still under investigation and a supplemental report will be completed upon final investigation. 3-21-14 supplemental report submitted to add missing data in part c, question 3 - added pipe
| Report Received Date | 2013-05-30 00:00:00 |
|---|---|
| Iyear | 2013 |
| Report Number | 20130189 |
| Supplemental Number | 19160 |
| Report Type | Supplemental |
| Operator Id | 12628 PHMSA Enforcement |
| Name | Mobil Pipe Line Company |
| Operator Street Address | 800 Bell Street Room 623 F |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2013-04-30 13:40:00 |
| Location Latitude | 36.57243 Google Maps OpenStreetMap |
| Location Longitude | -90.87867 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 1.3 |
| Recovered Bbls | 1.3 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Notification From Public |
| Incident Identified Datetime | 2013-04-30 13:40:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Pipeline Was Previously Shut Down Due To March 29 Release In Mayflower Ar.' |
| On Site Datetime | 2013-04-30 14:10:00 |
| Nrc Rpt Datetime | 2013-04-30 15:37:00 |
| Nrc Rpt Num | 1045614 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Remotely Controlled |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Pegasus Pipeline System |
| Segment Name | Doniphan To Strawberry Section |
| Onshore State Abbreviation | Mo |
| Onshore Postal Code | 63935 |
| Onshore City Name | Doniphan |
| Onshore County Name | Ripley |
| Designated Location | Milepost/valve Station |
| Designated Name | Mp 461.52 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 25 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 20 |
| Pipe Wall Thickness | 0.312 |
| Pipe Smys | 42000 |
| Pipe Specification | 5xl-42 |
| Pipe Seam Type | Seamless |
| Pipe Manufacturer | National |
| Pipe Coating Type | Coal Tar |
| Installation Year | 1947 |
| Manufactured Year | 1947 |
| Material Involved | Carbon Steel |
| Release Type | Mechanical Puncture |
| Puncture Axial | 3 |
| Puncture Circum | 0.1 |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Usa Drinking Ind | Yes |
| Usa Drinking Yes No | Yes |
| Usa Ecological Ind | Yes |
| Usa Ecological Yes No | Yes |
| Est Cost Oper Paid | 5000 |
| Est Cost Gas Released | 100 |
| Est Cost Prop Damage | 0 |
| Est Cost Emergency | 75000 |
| Est Cost Environmental | 143000 |
| Est Cost Other | 50000 |
| Est Cost Other Details | Repair For Welding , Nde, And Associate Repair Cost. |
| Prpty | 273100 |
| Accident Psig | 410 |
| Mop Psig | 875 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 328680 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Pipeline system was not running and was shut down from a earler incident. The pipeline was being monitored by controller. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Other Outside Force Damage |
| Cause Details | Other Outside Force Damage |
| Outside Force Type | Other Outside Force Damage |
| Osf Other Details | Pipeline Damage Was Apparently Caused By Third Party Installation Of A Guy Wire To Anchor A Power Pole. The Pole Was Installed In 1984 Prior To The Missouri One Call System. |
| Preparer Name | L**** H******** |
| Preparer Title | Pipeline Safety Advisor |
| Preparer Email | L****************@e*********.com |
| Preparer Telephone | 903-654-5345 |
| Preparer Fax | 903-654-5374 |
| Prepared Date | 2014-03-21 00:00:00 |
| Authorizer Name | M*** D W****** |
| Authorizer Telephone | 713-656-0227 |
| Authorizer Title | Manager- Safety-Health - Environmental |
| Authorizer Email | M*************@e*********.com |
| Narrative | Pipeline damage was apparently caused by third party installation of a guy wire to anchor a power pole. The pole was installed in 1984 prior to the missouri one call system. No record found to indicate that any notification was received prior to pole/anchor installation. Ozark borders co-op provided information on the installation date. Incident still under investigation and a supplemental report will be completed upon final investigation. 3-21-14 supplemental report submitted to add missing data in part c, question 3 - added pipe |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA