HL incident on 2013-04-23 — TX

Operator
Enbridge Energy, Limited Partnership
Cause
Natural Force Damage
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$128,015
Incident datetime
2013-04-23 15:03
Report number
Location
TX
Narrative
On april 23 at approximately 3:00 pm, while conducting the daily inspection at the viking station, the technician noticed oil on the ground in and around the whistle in the area of the line 2 discharge pressure transmitter. Line 2 was immediately shut down to determine the source of the oil. The threaded joint between the 2"piping and the 2" valve off the mainline failed. Further investigation discovered the leak was caused by the whistle frost heaving up and pushing on the 2" pipe, which in turn caused the pipe threads to fail. A temporary hose was installed that same day and line 2 was returned to service later that evening. The permanent piping is being configured and will be put into service in the next few weeks. Approximately 220 yards of contaminated soil was removed from the site and disposed of at an approved location.
Detailed record list
Report Received Date
2013-05-21 00:00:00
Iyear
2013
Report Number
20130176
Supplemental Number
18838
Report Type
Supplemental Final
Operator Id
Name
Enbridge Energy, Limited Partnership
Operator Street Address
915 N Eldridge Parkway, Suite 1100
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77079
Local Datetime
2013-04-23 15:03:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
33.33
Recovered Bbls
33.33
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2013-04-23 15:03:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2013-04-23 15:03:00
Restart Datetime
2013-04-23 20:15:00
On Site Datetime
2013-04-23 15:03:00
Nrc Rpt Datetime
2013-04-23 16:09:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Line 2
Segment Name
Line 2 Viking Station
Onshore State Abbreviation
Mn
Onshore Postal Code
56760
Onshore City Name
Viking
Onshore County Name
Marshall
Designated Location
Milepost/valve Station
Designated Name
848.26 Mp
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Inside Other Enclosed Space
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Auxiliary Piping (E.g. Drain Lines)
Installation Year
1998
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
128015
Est Cost Emergency
5053
Est Cost Environmental
107610
Est Cost Other
0
Prpty
240678
Accident Psig
205
Mop Psig
714
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
1
Num Employees Failed
0
Cause
Natural Force Damage
Cause Details
Temperature
Natural Force Type
Temperature
Temperature Subtype
Frost Heave
Nf Extreme Weather Ind
No
Preparer Name
S**** S****
Preparer Title
Compliance Analyst
Preparer Email
S**********@e*******.com
Preparer Telephone
218-464-5754
Preparer Fax
218-464-5992
Prepared Date
2013-12-17 00:00:00
Authorizer Name
D**** S*******
Authorizer Telephone
218-464-5751
Authorizer Title
Manager Us Pipeline Compliance
Authorizer Email
D*************@e*******.com
Narrative
On april 23 at approximately 3:00 pm, while conducting the daily inspection at the viking station, the technician noticed oil on the ground in and around the whistle in the area of the line 2 discharge pressure transmitter. Line 2 was immediately shut down to determine the source of the oil. The threaded joint between the 2"piping and the 2" valve off the mainline failed. Further investigation discovered the leak was caused by the whistle frost heaving up and pushing on the 2" pipe, which in turn caused the pipe threads to fail. A temporary hose was installed that same day and line 2 was returned to service later that evening. The permanent piping is being configured and will be put into service in the next few weeks. Approximately 220 yards of contaminated soil was removed from the site and disposed of at an approved location.
Report Received Date 2013-05-21 00:00:00
Iyear 2013
Report Number 20130176
Supplemental Number 18838
Report Type Supplemental Final
Operator Id 11169 PHMSA Enforcement
Name Enbridge Energy, Limited Partnership
Operator Street Address 915 N Eldridge Parkway, Suite 1100
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77079
Local Datetime 2013-04-23 15:03:00
Location Latitude 48.21111 Google Maps OpenStreetMap
Location Longitude -96.43556 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 33.33
Recovered Bbls 33.33
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2013-04-23 15:03:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2013-04-23 15:03:00
Restart Datetime 2013-04-23 20:15:00
On Site Datetime 2013-04-23 15:03:00
Nrc Rpt Datetime 2013-04-23 16:09:00
Nrc Rpt Num 1044848 NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Line 2
Segment Name Line 2 Viking Station
Onshore State Abbreviation Mn
Onshore Postal Code 56760
Onshore City Name Viking
Onshore County Name Marshall
Designated Location Milepost/valve Station
Designated Name 848.26 Mp
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Inside Other Enclosed Space
Crossing No
Pipe Facility Type Interstate
Item Involved Auxiliary Piping (E.g. Drain Lines)
Installation Year 1998
Material Involved Carbon Steel
Release Type Leak
Leak Type Connection Failure
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 0
Est Cost Prop Damage 128015
Est Cost Emergency 5053
Est Cost Environmental 107610
Est Cost Other 0
Prpty 240678
Accident Psig 205
Mop Psig 714
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind Yes
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind Yes
Contractor Drug Test Ind No
Num Employees Tested 1
Num Employees Failed 0
Cause Natural Force Damage
Cause Details Temperature
Natural Force Type Temperature
Temperature Subtype Frost Heave
Nf Extreme Weather Ind No
Preparer Name S**** S****
Preparer Title Compliance Analyst
Preparer Email S**********@e*******.com
Preparer Telephone 218-464-5754
Preparer Fax 218-464-5992
Prepared Date 2013-12-17 00:00:00
Authorizer Name D**** S*******
Authorizer Telephone 218-464-5751
Authorizer Title Manager Us Pipeline Compliance
Authorizer Email D*************@e*******.com
Narrative On april 23 at approximately 3:00 pm, while conducting the daily inspection at the viking station, the technician noticed oil on the ground in and around the whistle in the area of the line 2 discharge pressure transmitter. Line 2 was immediately shut down to determine the source of the oil. The threaded joint between the 2"piping and the 2" valve off the mainline failed. Further investigation discovered the leak was caused by the whistle frost heaving up and pushing on the 2" pipe, which in turn caused the pipe threads to fail. A temporary hose was installed that same day and line 2 was returned to service later that evening. The permanent piping is being configured and will be put into service in the next few weeks. Approximately 220 yards of contaminated soil was removed from the site and disposed of at an approved location.