Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2013-04-19 — OK
Operator
Magellan Terminals Holdings, Lp
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$5,000
Incident datetime
2013-04-19 15:30
Report number
Location
OK
Narrative
A leak occurred on the pipelinedue to external corrosion pitting. This line was found to be uncoated, however cp readings showed to be well above the requirements. The applied cp date of 1991 was based on the earliest readings provided by the previous owner of the rectifier servicing this line. This line has been removed from service. A courtesy notification was made to the nrc as it was unknown if the $50,000 criteria would be met. However this release did not meet the notification requirements. An attempt to submit this report was made on 5/17/13, however, PHMSA's website was down for the weekend due to maintenance. The incident investigation concluded that the cp was adequate on the line but was inconclusive to the exact mode of failure. It is unknown if adequate cp was applied during the previous ownership and may have potentially contributed to the corrosion of the line. As local projects are completed the piping and coating conditions are evaluated and identified issues are addressed per magellan's 7.01-adm-001 pipeline defect evaluation and repair procedure.
Detailed record list
Report Received Date
2013-05-20 00:00:00
Iyear
2013
Report Number
20130173
Supplemental Number
18819
Report Type
Supplemental Final
Operator Id
31580
Name
Magellan Terminals Holdings, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2013-04-19 15:30:00
Location Latitude
35.94336
Location Longitude
-96.75159
Commodity Released Type
Crude Oil
Unintentional Release Bbls
5
Recovered Bbls
5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Other
Accident Details
Phillips 66 Employee
Incident Identified Datetime
2013-04-19 15:30:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2013-04-19 15:30:00
Still Shutdown Ind
Yes
On Site Datetime
2013-04-19 16:00:00
Nrc Rpt Datetime
2013-04-22 14:12:00
Nrc Rpt Num
1044720
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Cushing Central Crude (Phillips 66 Location)
Segment Name
7205 Cushing Central To Enbridge 12"/14"
Onshore State Abbreviation
Ok
Onshore Postal Code
74023
Onshore City Name
Cushing
Onshore County Name
Payne
Designated Location
Milepost/valve Station
Designated Name
0.2
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
12.75
Pipe Wall Thickness
0.25
Pipe Smys
35000
Pipe Specification
Grade B
Pipe Seam Type
Seamless
Pipe Manufacturer
Unknown
Pipe Coating Type
None
Manufactured Year
1944
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
440
Est Cost Prop Damage
5000
Est Cost Emergency
25000
Est Cost Environmental
0
Est Cost Other
5000
Est Cost Other Details
Sampling And Report For Occ.
Prpty
35440
Accident Psig
112
Mop Psig
275
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
5280
Internal Inspection Ind
No
Other Restrictions Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
Localized Pitting
Galvanic Corrosion Ind
Yes
Field Exam Basis Ind
Yes
Underground Location
Yes
Under Cathodic Protection Ind
Yes
Cathodic Pro Start Year
1991
Shielding Evident
No
Cathodic Survey Type
Yes
Cp Annual Survey Ind
Yes
Cp Annual Survey Year
2013
Prior Damage
No
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
D******* C*********
Preparer Title
Sr. Compliance Coordinator
Prepared Date
2013-12-12 00:00:00
Authorizer Name
D******* C*********
Authorizer Telephone
918-574-7386
Authorizer Title
Sr. Compliance Coordinator
Authorizer Email
D******************@m*********.com
Narrative
A leak occurred on the pipelinedue to external corrosion pitting. This line was found to be uncoated, however cp readings showed to be well above the requirements. The applied cp date of 1991 was based on the earliest readings provided by the previous owner of the rectifier servicing this line. This line has been removed from service. A courtesy notification was made to the nrc as it was unknown if the $50,000 criteria would be met. However this release did not meet the notification requirements. An attempt to submit this report was made on 5/17/13, however, PHMSA's website was down for the weekend due to maintenance. The incident investigation concluded that the cp was adequate on the line but was inconclusive to the exact mode of failure. It is unknown if adequate cp was applied during the previous ownership and may have potentially contributed to the corrosion of the line. As local projects are completed the piping and coating conditions are evaluated and identified issues are addressed per magellan's 7.01-adm-001 pipeline defect evaluation and repair procedure.
| Report Received Date | 2013-05-20 00:00:00 |
|---|---|
| Iyear | 2013 |
| Report Number | 20130173 |
| Supplemental Number | 18819 |
| Report Type | Supplemental Final |
| Operator Id | 31580 PHMSA Enforcement |
| Name | Magellan Terminals Holdings, Lp |
| Operator Street Address | 100 West 5th Street |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74103 |
| Local Datetime | 2013-04-19 15:30:00 |
| Location Latitude | 35.94336 Google Maps OpenStreetMap |
| Location Longitude | -96.75159 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 5 |
| Recovered Bbls | 5 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Other |
| Accident Details | Phillips 66 Employee |
| Incident Identified Datetime | 2013-04-19 15:30:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2013-04-19 15:30:00 |
| Still Shutdown Ind | Yes |
| On Site Datetime | 2013-04-19 16:00:00 |
| Nrc Rpt Datetime | 2013-04-22 14:12:00 |
| Nrc Rpt Num | 1044720 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Remotely Controlled |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Cushing Central Crude (Phillips 66 Location) |
| Segment Name | 7205 Cushing Central To Enbridge 12"/14" |
| Onshore State Abbreviation | Ok |
| Onshore Postal Code | 74023 |
| Onshore City Name | Cushing |
| Onshore County Name | Payne |
| Designated Location | Milepost/valve Station |
| Designated Name | 0.2 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 12.75 |
| Pipe Wall Thickness | 0.25 |
| Pipe Smys | 35000 |
| Pipe Specification | Grade B |
| Pipe Seam Type | Seamless |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | None |
| Manufactured Year | 1944 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 440 |
| Est Cost Prop Damage | 5000 |
| Est Cost Emergency | 25000 |
| Est Cost Environmental | 0 |
| Est Cost Other | 5000 |
| Est Cost Other Details | Sampling And Report For Occ. |
| Prpty | 35440 |
| Accident Psig | 112 |
| Mop Psig | 275 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 5280 |
| Internal Inspection Ind | No |
| Other Restrictions Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the facility was not monitored by a controller(s) at the time of the accident |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | External Corrosion |
| Internal External | External Corrosion |
| Visual Exam Results | Localized Pitting |
| Galvanic Corrosion Ind | Yes |
| Field Exam Basis Ind | Yes |
| Underground Location | Yes |
| Under Cathodic Protection Ind | Yes |
| Cathodic Pro Start Year | 1991 |
| Shielding Evident | No |
| Cathodic Survey Type | Yes |
| Cp Annual Survey Ind | Yes |
| Cp Annual Survey Year | 2013 |
| Prior Damage | No |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | D******* C********* |
| Preparer Title | Sr. Compliance Coordinator |
| Prepared Date | 2013-12-12 00:00:00 |
| Authorizer Name | D******* C********* |
| Authorizer Telephone | 918-574-7386 |
| Authorizer Title | Sr. Compliance Coordinator |
| Authorizer Email | D******************@m*********.com |
| Narrative | A leak occurred on the pipelinedue to external corrosion pitting. This line was found to be uncoated, however cp readings showed to be well above the requirements. The applied cp date of 1991 was based on the earliest readings provided by the previous owner of the rectifier servicing this line. This line has been removed from service. A courtesy notification was made to the nrc as it was unknown if the $50,000 criteria would be met. However this release did not meet the notification requirements. An attempt to submit this report was made on 5/17/13, however, PHMSA's website was down for the weekend due to maintenance. The incident investigation concluded that the cp was adequate on the line but was inconclusive to the exact mode of failure. It is unknown if adequate cp was applied during the previous ownership and may have potentially contributed to the corrosion of the line. As local projects are completed the piping and coating conditions are evaluated and identified issues are addressed per magellan's 7.01-adm-001 pipeline defect evaluation and repair procedure. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA